Bellbrook, Ohio (OH) Trails & Maps

Sort by
  • 4-C Bicentennial Trail

    State: OH
    Length: 1.3 miles
    Surface: Asphalt

    The 4C Bicentennial Trail is one of several throughout Wilmington, OH, and runs between Southeast Neighborhood Park and Fife Avenue (CR 82), just across the road from the south end of Denver Williams Memorial Park. The trail passes through a ...
  • Armleder Park Trail

    State: OH
    Length: 2 miles
    Surface: Asphalt

    The Armleder Park Trail loops along a wide, paved route through the open meadows of the park, located east of Cincinnati. At the southeast end you'll find an overlook of the Little Miami River. The Armleder Park Trail links to the Lunken Airport ...
  • Buck Creek Trail (OH)

    Rail-Trail

    State: OH
    Length: 6.1 miles
    Surface: Asphalt

    The Buck Creek Trail runs between Buck Creek State Park and Plum Street by Wittenberg University. At its eastern end in Buck Creek State Park, the trail makes a loop and heads into 2 different directions bordering the southwest side of the reservoir. The ...
  • California Junction Trail

    Rail-Trail

    State: OH
    Length: 1 miles
    Surface: Ballast, Dirt, Woodchips

    The California Junction Trail is one of two National Recreation Trails located in the 115-acre California Woods Nature Preserve. Located near the mouth of the Little Miami and Ohio Rivers, the former rail line was operated by the Cincinnati, ...
  • Camp Chase Rail-Trail

    Rail-Trail

    State: OH
    Length: 6.9 miles
    Surface: Crushed Stone

    The Camp Chase Rail-Trail is a paved, 6.9-mile pathway stretching from Lilly Chapel to Galloway in central Ohio's Madison and Franklin Counties  It will one day total 15 miles and extend into the Columbus metro area.  It gets its name from the ...
  • Canal Feeder Trail

    State: OH
    Length: 2.4 miles
    Surface: Asphalt

    The Canal Feeder Trail begins at Graceland Cemetery on the south end of Sidney and continues southwest on a former historical canal towpath dating back to the 1840s. The paved trail parallels the Miami River through dense woodlands as it ...
  • Cardinal Greenway

    Rail-Trail

    State: IN
    Length: 62 miles
    Surface: Asphalt

    The Cardinal Greenway, the longest rail-trail in Indiana, stretches more than 60 miles from Marion to Richmond along a former CSX railroad corridor. The trail takes its name from the Cardinal, the passenger train that once regularly ran the ...
  • Creekside Trail

    Rail-Trail

    State: OH
    Length: 15 miles
    Surface: Asphalt, Concrete

    The Creekside Trail is an important connector in Ohio’s Miami Valley trail network, a system of 330 miles of paved, off-road trails. This 15-mile route cuts a swift route from Xenia to Dayton, passing a variety of sites, including drag racetracks ...
  • Darby Creek Trail

    State: OH
    Length: 7.8 miles
    Surface: Gravel

    The Darby Creek Trail is currently available in two disconnected segments that parallel the Big Darby State and National Scenic River on the western outskirts of Columbus. The northern 3.5 miles of trail wind through the Prairie Oaks Metro ...
  • Fairfax Bike Trail

    Rail-Trail

    State: OH
    Length: 0.8 miles
    Surface: Asphalt

    The Fairfax Trail is just 0.8 mile long and parallels the north side of Murray Avenue between Settle Street in Mariemont and La Crosse Avenue in Madisonville. There are plans to link the Fairfax Trail to another trail planned to run between ...
  • Great Miami River Trail

    State: OH
    Length: 86.2 miles
    Surface: Asphalt

    Note: Due to I-75 bridge work, the Great Miami River Trail is closed between Fifth Street and Helena Street in downtown Dayton until 2017. More information and a map of the half-mile, on-street detour around the closure is available on the Miami ...
  • Greenville Creek Trail

    State: OH
    Length: 0.5 miles
    Surface: Asphalt

    The Greenville Creek Trail is nice, albeit short, retreat through suburban Greenville. The paved path follows its namesake creek, passing under streets and linking neighborhood parks with the downtown. The trail runs for 0.5 mile between Alice ...
  • Hydraulic Canal Run

    State: OH
    Length: 2.3 miles
    Surface: Asphalt

    Hydraulic Canal Run begins in picturesque French Park, where stands of mature trees provide the perfect shady spots to picnic. From here, you can also connect to Piqua City Linear Park, a rail-trail that extends 5.5 miles across the city. From ...
  • Iron Horse Trail (OH)

    Rail-Trail

    State: OH
    Length: 7.6 miles
    Surface: Asphalt

    The 7-mile Iron Horse Trail (open in two disconnected segments) utilizes approximately 2 miles of former Penn Central right-of-way, providing users a pleasant route through neighborhoods, as well as a link to Centerville’s Iron Horse Park and ...
  • Lebanon Countryside YMCA Trail

    Rail-Trail

    State: OH
    Length: 8.2 miles
    Surface: Asphalt

    The Lebanon Countryside YMCA Trail offers 8 miles of paved pathway winding through Lebanon, from downtown to a connection to the 78-mile Little Miami Scenic Trail. The trail begins in the north near the Lebanon Railroad Station, which is used ...
  • Little Miami Scenic Trail

    Rail-Trail

    State: OH
    Length: 78 miles
    Surface: Asphalt, Concrete

    The Little Miami Scenic Trail is a jewel in the 330-mile network of paved, off-road trails in Ohio’s Miami Valley. The 78-mile paved path links Terrace Park near Cincinnati to Springfield, a dozen towns and four counties to the north. It passes ...
  • Lowe's Drive Trail

    State: OH
    Length: 0.7 miles
    Surface: Asphalt

    The Lowe's Connector Trail parallels Lowe's Drive in Wilmington, OH, and links Rombach Avenue with Prairie Road; however, this is no sidewalk once you reach Prairie Road. The trail is best used to access shopping centers along Lowe's Drive from ...
  • Lunken Airport Bike Path

    State: OH
    Length: 5 miles
    Surface: Asphalt

    The Lunken Airport Bike Path is a 5-mile loop trail that circles Lunken's airport. Much of the trail sits atop the levee that protects the airport from flooding of the Little Miami River. The paved path is wide and affords many nice views of ...
  • Luther Warren Peace Path

    Rail-Trail

    State: OH
    Length: 1.3 miles
    Surface: Asphalt

    The Luther Warren Peace Path is shady 1.2-mile journey along a level paved surface, delightfully cool in summer. The trail includes two old railroad bridges, one covered and built as a local Boy Scout project. There is a link to the path from ...
  • Mad River Trail

    Rail-Trail

    State: OH
    Length: 7.1 miles
    Surface: Asphalt

    Mad River Trail offers a paved, 7-mile route along its namesake river in northeastern Dayton and is part of one of the nation's largest network of paved, off-street trails. Its western end begins near Webster Street in RiverScape MetroPark. ...
  • Miami & Erie Canal (Minster to Fort Loramie)

    State: OH
    Length: 3 miles
    Surface: Dirt

    The 40-mile hiking and biking trail along the Miami & Erie Canal Towpath was created through the Ohio Trails Act. The trail is broken into five segments ranging from 3 miles to 14 miles between the towns of Delphos and Fort Loramie. Each segment ...
  • Miami & Erie Canal Towpath Overview

    State: OH
    Length: 40 miles
    Surface: Crushed Stone, Dirt, Grass, Gravel

    The Miami & Erie Canal was built between 1825 and 1845, an engineering marvel stretching from Cincinnati to Toledo. This canal was heavily used until competition from the railroad caused the decline of the canal system. The Miami & Erie Canal ...
  • Mill Creek Greenway

    State: OH
    Length: 3 miles
    Surface: Asphalt

    The growing Mill Creek Greenway follows one of Cincinnati’s most important urban waterways and will one day stretch 14 miles through the city's northern neighborhoods. Groundwork Cincinnati is a community-based nonprofit that works to develop ...
  • Newport Southbank Bridge (Purple People Bridge)

    Rail-Trail

    State: KY, OH
    Length: 0.5 miles
    Surface: Concrete

    The Newport Southbank Bridge, commonly known as the Purple People Bridge due to its unique paint scheme, links the large Ohio city of Cincinnati with Newport, Kentucky, a medium-sized city rapidly becoming the entertainment hub of fast-growing ...
  • Ohio River Trail (OH)

    State: OH
    Length: 7.6 miles
    Surface: Concrete

    When complete, the Ohio River Trail in eastern Cincinnati will be an important connector between downtown, riverfront parks, and many neighborhoods. It currently runs through T.M. Berry International Friendship Park, named for the city's first ...
  • Ohio to Erie Trail

    State: OH
    Length: 320 miles
    Surface: Asphalt, Concrete

    The Ohio to Erie Trail spans the state of Ohio from a tributary of the Ohio River in Cincinatti to Cleveland on the shores of Lake Erie. When complete, this trail will connect four of Ohio's metropolitan cities, a dozen large towns, and numerous ...
  • Pickaway County Rail-Trail

    Rail-Trail

    State: OH
    Length: 16.5 miles
    Surface:

    The old Cincinnati-Muskingum Railroad grade from Circleville to the County line at New Holland is now owned by the Pickaway County Park District. Efforts are now underway to develop the Pickaway Trail which will eventually be over 16 miles of ...
  • Piqua City Linear Park

    Rail-Trail

    State: OH
    Length: 5.5 miles
    Surface: Asphalt

    Piqua City Linear Park was constructed on an abandoned railroad bed from the city's easternmost point to its westernmost point. Midway, it connects to the Great Miami River Trail and is part of the 330-mile Miami Valley trail system, one of ...
  • Prairie Grass Trail

    Rail-Trail

    State: OH
    Length: 29 miles
    Surface: Asphalt

    The Prairie Grass Trail is an important piece of the Ohio to Erie Trail, the extensive cross-state, 320-mile trail. This beautifully maintained asphalt rail-trail segment stretches 29 miles between London and Xenia, generally following US 42. ...
  • Roberts Pass Trail

    Rail-Trail

    State: OH
    Length: 6.5 miles
    Surface: Asphalt

    The Roberts Pass Trail runs from downtown London, Ohio, to rural Fairfield Township. The trail passes through farmland for 6.5 miles, although dense tree cover shades the route at all times. Although the trail might not offer varied scenery, ...
  • Shaker Trace Trail

    State: OH
    Length: 8 miles
    Surface: Asphalt

    Miami Whitewater Forest has much to offer any Cincinnati hiker interested in getting away from the daily grind for an hour or a day. You can enjoy an ice cream by the lake, or hike into the woods to observe the diverse wildlife. The three ...
  • Sharon Woods Loop Trail

    State: OH
    Length: 2.6 miles
    Surface: Asphalt

    The Sharon Woods Loop Trail circles a picturesque lake in this popular park in the Hamilton County Park District. Sharon Woods offers a visitor center, picnic areas and athletic fields.
  • Simon Kenton Trail

    Rail-Trail

    State: OH
    Length: 17.1 miles
    Surface: Asphalt

    The Simon Kenton Trail is a tribute to the hardworking volunteer group that built and maintains the corridor, once part of the Erie-Lackawanna rail line. The rail-trail is well designed, has extensions and improvements in the offing and has ...
  • Stillwater River Bikeway

    State: OH
    Length: 7.1 miles
    Surface: Asphalt

    The Stillwater River Bikeway winds through Dayton's northern suburbs, following the tree-lined eastern shore of its namesake waterway for much of the way. Two disconnected segments of trail are currently open. The shorter Northern Segment ...
  • Tecumseh Trail

    Rail-Trail

    State: OH
    Length: 2.4 miles
    Surface: Asphalt

    The paved Tecumseh Trail skirts the quaint city of New Carlisle. The trail takes users through some beautiful wooded areas along a former railroad corridor and connects to Smith Park. At the popular Wot-a-Dog Drive-In Restaurant along State ...
  • Tecumseh Trail Multi-use Pathway

    Rail-Trail

    State: OH
    Length: 7.2 miles
    Surface: Asphalt

    The Tecumseh Trail Multi-use Pathway offers a pleasant route, partially on the former Pennsylvania Railroad's Columbus-to-Saint Louis freight mainline. The rail route was also once used for Lincoln's funeral train in 1865. The trail provides ...
  • Tri-County Triangle Trail

    Rail-Trail

    State: OH
    Length: 34.8 miles
    Surface: Asphalt

    The Tri-County Triangle Trail is the flagship pathway of a planned trail network in the Ohio counties of Fayette, Ross and Highland. Nearly 35 miles of paved trail are currently open linking the communities of Washington Court House, Frankfort ...
  • Wolf Creek Trail (OH)

    Rail-Trail

    State: OH
    Length: 16.2 miles
    Surface: Asphalt

    Wolf Creek Trail is a well-maintained asphalt trail that is currently open in two disconnected segments. It’s part of the 330-mile Miami Valley trail system, one of the largest paved, off-road trail networks in the county. The longest section ...
  • Wright Brothers Huffman Prairie Bikeway

    Rail-Trail

    State: OH
    Length: 4.6 miles
    Surface: Asphalt, Concrete

    The Wright Brothers Huffman Prairie Bikeway runs from South Street in downtown Fairborn, along the north side of Kauffman Avenue adjacent to an active rail line, to National Road. At that point, the trail crosses Kauffman to the south side and ...
  • Xenia-Jamestown Connector

    Rail-Trail

    State: OH
    Length: 15.4 miles
    Surface: Asphalt

    The Xenia–Jamestown Connector Trail links these two eponymous communities, and travels east beyond Jamestown to the Green/Fayette county line at Rosemoor Road. It's part of Ohio’s Miami Valley trail system, one of the nation's largest networks ...
Explore urban trails in and around Bellbrook, Ohio.Find detailed trail guides for Bellbrook bike trails, Bellbrook walking paths and much more.Click on a trail below to find trail descriptions, trail maps, photos and reviews. Once you find the trail you’re looking for,plan a trip there and use one of our partners to book your hotel, bed and breakfast, or campground near Bellbrook.