Clyde, Ohio (OH) Trails & Maps

Sort by
  • Bridgeway Trail

    Rail-Trail

    State: OH
    Length: 4.5 miles
    Surface: Asphalt

    The Brideway Trail is found within the Black River Reservation, a park in Lorain County, where you can walk, job, inline skate, cross-country ski or bike. The trail runs between Day's Dam in Lorain and the High Meadows picnic area in Elyria, ...

  • Heritage Park

    State: MI
    Length: 0 miles
    Surface: Dirt

    These trails are maintained in part by volunteers of the Michigan Mountain Biking Association (MMBA).

  • Heritage Trail (OH)

    Rail-Trail

    State: OH
    Length: 20.13 miles
    Surface: Asphalt, Crushed Stone, Dirt, Grass, Gravel, Woodchips

    NOTE:This, and all trails in Hancock County, are closed during hunting season, September 1 to January 31. Segments running through Findlay are not closed. Hancock County's Heritage Trail runs for more than 20 miles from Heritage Trail Center ...

  • Huron River Greenway (OH)

    Rail-Trail

    State: OH
    Length: 2 miles
    Surface: Crushed Stone

    The Huron River Greenway has two separate segments, each just under 1 mile long. The northern (Huron) segment runs from DuPont Marsh State Nature Preserve off River Road and heads south about 0.9 mile, ending at a gate on River View Drive in ...

  • International Park Rotary Trail

    Rail-Trail

    State: OH
    Length: 2.36 miles
    Surface: Asphalt

    The International Park Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it loops back to the park's north end. You can also ...

  • Killbuck Wildlife Area Trail

    Rail-Trail

    State: OH
    Length: 3.7 miles
    Surface: Dirt

    A walking-only trail for wildlife observation is being established on the abandoned B&O Railroad through the center of the Killbuck Marsh Wildlife Area. The trail is currently 3.7 miles long and passes through a large variety of natural habitats. ...

  • North Coast Inland Trail - Huron County (Norwalk to Bellevue)

    Rail-Trail

    State: OH
    Length: 15.4 miles
    Surface: Crushed Stone, Dirt

    The North Coast Inland Trail through Huron County is just one segment of a system of trails in the North Coast Inland chain. Other segments include Lorain County, Sandusky/Ottawa counties and the Wabash Connector. The trail passes among hardwood ...

  • North Coast Inland Trail - Lorain County (Elyria to Kipton)

    Rail-Trail

    State: OH
    Length: 13.1 miles
    Surface: Asphalt

    The Kipton to Elyria rail-trail is a 13-mile paved path and part of the 65-mile North Coast Inland Trail. The corridor is classic rail-trail: flat and mostly straight. Heading northeast from Kipton's downtown community park and restored depot, ...

  • North Coast Inland Trail - Sandusky/Ottawa County (Bellevue to Elmore)

    Rail-Trail

    State: OH
    Length: 26 miles
    Surface: Asphalt, Cinder

    NOTE: Although other segments of the North Coast Inland Trail may permit equestrians, this segment does not. This portion of North Coast Inland Trail, managed by the Sandusky County Park District, includes 23.25 miles of paved trail from Elmore ...

  • North Coast Inland Trail Wabash Connector

    Rail-Trail

    State: OH
    Length: 1.9 miles
    Surface:

    As of late 2012, only 1.9 miles of this planned 14-mile trail is complete. This segment will eventually link the North Coast Inland Trail and the Wabash Cannoball Trail. Currently, there is a bike lane between Millbury Road in Millbury, via ...

  • Oakwoods Trails

    Rail-Trail

    State: OH
    Length: 1.4 miles
    Surface: Asphalt, Dirt, Grass, Woodchips

    The Oakwoods Trail system runs through a 155-acre nature preserve bordering Interstate 75 southwest of downtown Findlay. The preserve features a small lake, woodlands and meadows. The trails form three main loops, and a small section occupies ...

  • Orrville to Clinton Trail

    Rail-Trail

    State: OH
    Length: 8 miles
    Surface:

    The much anticipated 8 mile trail from Orrville to Clinton is closer to reality. The corridor was purchased in the summer of 2010 from Norfolk and Southern Railroad. The trail will go from Orrville through the village of Marshallville to Clinton. ...

  • Richland B&O Trail

    Rail-Trail

    State: OH
    Length: 18.4 miles
    Surface: Asphalt

    Carving a semi-circular route between Butler and Mansfield, the Richland B&O Trail zigzags across the same several roads and weaves in and out of rural landscapes, moving northwest from Butler. From Hitchman Park in Butler, commemorative benches ...

  • Slippery Elm Trail

    Rail-Trail

    State: OH
    Length: 13 miles
    Surface: Asphalt

    The mileage slips by on the Slippery Elm Rail-Trail as you take in the flat, fast and scenic northwest Ohio countryside. The 13-mile paved path runs south from Bowling Green through the small town of Rudolph and finishes in North Baltimore. ...

  • Steel Mill Trail

    Rail-Trail

    State: OH
    Length: 2 miles
    Surface: Asphalt

    The Steel Mill Trail is a 2-mile continuation of the Bridgeway Trail, which lies within the Black River Reservation, a scenic wooded park in Lorain. The Steel Mill Trail picks up at the north end of the Bridgeway Trail by the Days Dam Picnic ...

  • Towpath Trail

    State: OH
    Length: 9.1 miles
    Surface: Crushed Stone, Dirt

    For much of its 9-mile length, the Towpath Trail traces the scenic Maumee River, paralleling US 24 (at some distance), on the southwestern outskirts of Toledo. It traverses three parks as it follows the former Miami & Erie Canal (circa mid-1800s). ...

  • University Park Bike-Hike Trail

    Rail-Trail

    State: OH
    Length: 6.3 miles
    Surface: Asphalt

    The University-Parks Bike-Hike Trail is a 6.3 mile paved multi-purpose trail that is suitable for walking, jogging, inline skating and bicycling. The trail is also suitable for wheelchair users. The trail extends between King Road in Sylvania ...

  • Wabash Cannonball Trail (North and South Fork)

    Rail-Trail

    State: OH
    Length: 63 miles
    Surface: Asphalt, Cinder, Crushed Stone, Dirt, Grass

    The Wabash Cannonball Trail in northwest Ohio is actually two trails in one: the north fork runs east–west for 46 miles and the south fork makes up the balance of this 63-mile trail. The trails converge in the eastern city of Maumee then ...

Explore urban trails in and around Clyde, Ohio.Find detailed trail guides for Clyde bike trails, Clyde walking paths and much more.Click on a trail below to find trail descriptions, trail maps, photos and reviews. Once you find the trail you’re looking for,plan a trip there and use one of our partners to book your hotel, bed and breakfast, or campground near Clyde.