|
The 153 Extension Trail is a short, paved sidepath in the eastern outskirts of Easley, South Carolina. The biking and walking pathway was built in 2020 as part of a road extension project, allowing...
|
SC |
1.2 mi |
Asphalt
|
|
|
The Bill and Dustie MacKay Trail (also known as the Shortline Trail) spins a short, smooth circuit through Tallulah Gorge State Park. From its trailhead beside Tallulah Falls Lake, the 1.7-mile paved...
|
GA |
1.7 mi |
Asphalt, Dirt
|
|
|
This moderately difficult walk follows the bed of railroad that was never completed—the America Civil War got in the way of SC Statesman John C. Calhoun's rail dream. They did get as far as starting...
|
SC |
2.5 mi |
Boardwalk, Dirt, Woodchips
|
|
|
The Doodle Rail Trail connects the towns of Easley and Pickens in the northwestern corner of South Carolina. The paved trail follows the former Doodle Line railroad for just over 8 miles and includes...
|
SC |
8.5 mi |
Asphalt
|
|
|
The trail extends from the dam at Duncan Park Lake and courses through the park to near Union Street by the baseball stadium. The path is a gradual hill (up or down, depending on your direction of...
|
SC |
1 mi |
Asphalt, Concrete
|
|
|
The first phase of this rail trail opened in April 2017 and provides safe and convenient pedestrian access to Lyman’s commercial center. While it is new, it is already fairly well-used. The trail...
|
SC |
0.5 mi |
Asphalt
|
|
|
The Mary Black Foundation Rail Trail is just a short segment of what will eventually become the 12-mile Hub City Connector, which itself will be part of the larger Palmetto Trail, a proposed 425-mile...
|
SC |
1.9 mi |
Asphalt
|
|
|
For lovers of outdoors, the Oklawaha Greenway presents a natural escape in an otherwise suburban setting. The greenway trails Mud Creek for a big part of its length, beginning its northwesterly...
|
NC |
3.5 mi |
Asphalt
|
|
|
The 28-mile Prisma Health (formerly Greenville Health System) Swamp Rabbit Trail links the cities of Travelers Rest and Greenville in upstate South Carolina via a former railroad...
|
SC |
28 mi |
Asphalt, Boardwalk
|
|
|
Constructed in 1981 as the city of Spartanburg's first mixed-use trail, the River Birch Trail was in rough shape, with vegetation overgrowing the route and the surface cracked and failing, until the...
|
SC |
1.1 mi |
Asphalt, Gravel
|
|
|
Explore Cleveland Park via its paved trails that wind through the trees and fields, connecting the park's facilities and amenities.
The park includes the John B. Cleveland Event Center, picnic...
|
SC |
1.5 mi |
Asphalt, Concrete
|
|
|
The Estatoe Trail is a relatively flat trail, spanning just over 5 miles. About 1 mile (northwest end) follows the old Carr Lumber Company railway corridor and extends into the Pisgah National Forest...
|
NC |
5.6 mi |
Asphalt, Boardwalk, Concrete, Gravel
|
|
|
The Little Tennessee River Greenway follows the Little Tennessee River and a tributary, Cartoogechaye Creek. There are plans to extend the greenway from Suli Marsh, at Arthur Drake Road to Lake Emory,...
|
NC |
4.7 mi |
Asphalt
|
|
|
Note: USC Upstate Passage is now open from the Rampey Center Trailhead to where it meets the Hub City Passage. The North Loop is still closed while under restoration.
The USC Upstate Passage is...
|
SC |
2.2 mi |
Dirt
|
|
|
The Wadsworth Trail parallels Willis Road from Harmon Drive to Hawk Creek Drive, with a spur heading south along SR 42-4382/Caldwell Drive. The Willis Road portion is 1.85 miles (one way), while the...
|
SC |
2.8 mi |
Asphalt
|
|
|
Southport Road Path follows the south side of Southport Road from Cedar Springs Road to South Avenue. Heading west from Cedar Springs Road, the multi-use path passes the 295 Sports Complex, a DMV...
|
SC |
3 mi |
Asphalt, Concrete
|
|
|
The trail runs from the heart of Belton north towards Williamston. Beginning from the Belton Library, the trail travels north within the former Southern Railway corridor, paralleling Main Street. The...
|
SC |
1.2 mi |
Asphalt, Concrete
|
|
|
Part of an expansive revitalization effort that the city of Spartanburg has undertaken to improve the economic and ecological well-being of the Northside neighborhood, the Butterfly Branch Greenway...
|
SC |
0.5 mi |
Concrete
|
|
|
The Cambridge Gateway Trail stretches east-west along West Cambridge Avenue up to Calhoun Road/ State Route 225. The eight-foot wide stone-dust trail is lined with mature trees providing shade and is...
|
SC |
1 mi |
Crushed Stone
|
|
|
This 1.2 mile paved path meanders through Greenville's Cleveland Park, following Richland Creek and providing access to the downtown recreation area's various features. The trail surface is smooth...
|
SC |
1.2 mi |
Concrete
|
|