|
The 153 Extension Trail is a short, paved sidepath in the eastern outskirts of Easley, South Carolina. The biking and walking pathway was built in 2020 as part of a road extension project, allowing...
|
SC |
1.2 mi |
Asphalt
|
|
|
The Doodle Rail Trail connects the towns of Easley and Pickens in the northwestern corner of South Carolina. The paved trail follows the former Doodle Line railroad for just over 8 miles and includes...
|
SC |
8.5 mi |
Asphalt
|
|
|
The trail extends from the dam at Duncan Park Lake and courses through the park to near Union Street by the baseball stadium. The path is a gradual hill (up or down, depending on your direction of...
|
SC |
1 mi |
Asphalt, Concrete
|
|
|
The first phase of this rail trail opened in April 2017 and provides safe and convenient pedestrian access to Lyman’s commercial center. While it is new, it is already fairly well-used. The trail...
|
SC |
0.5 mi |
Asphalt
|
|
|
The Mary Black Foundation Rail Trail is just a short segment of what will eventually become the 12-mile Hub City Connector, which itself will be part of the larger Palmetto Trail, a proposed 425-mile...
|
SC |
1.9 mi |
Asphalt
|
|
|
For lovers of outdoors, the Oklawaha Greenway presents a natural escape in an otherwise suburban setting. The greenway trails Mud Creek for a big part of its length, beginning its northwesterly...
|
NC |
3.5 mi |
Asphalt
|
|
|
Overview
Located approximately 25 miles east of the vibrant city of Asheville, the Point Lookout Trail offers visitors the opportunity to be enveloped by nature as they travel through the dense...
|
NC |
3.6 mi |
Asphalt
|
|
|
The 28-mile Prisma Health (formerly Greenville Health System) Swamp Rabbit Trail links the cities of Travelers Rest and Greenville in upstate South Carolina via a former railroad...
|
SC |
28 mi |
Asphalt, Boardwalk
|
|
|
The Purple Martin Greenway provides a beautiful community amenity in Rutherfordton. The quaint western North Carolina town was established in 1787 and has many buildings on the National Register of...
|
NC |
3.2 mi |
Asphalt
|
|
|
Constructed in 1981 as the city of Spartanburg's first mixed-use trail, the River Birch Trail was in rough shape, with vegetation overgrowing the route and the surface cracked and failing, until the...
|
SC |
1.1 mi |
Asphalt, Gravel
|
|
|
Closure Notice: The suspension bridge over First Broad River is temporarily closed due to flooding. Please check with local news authorities before heading out on the trail.
Shelby's rail-trail...
|
NC |
1.5 mi |
Dirt
|
|
|
Overview
The Thermal Belt Rail Trail lies at the heart of communities in Rutherford and Polk County. The name of the trail comes from the surrounding Isothermal Belt region which results in mild...
|
NC |
13.6 mi |
Asphalt
|
|
|
This is a 2-mile greenway located in the newly improved River Arts District on the east bank of the French Broad River. It was developed as part of the larger River Arts District Transportation...
|
NC |
2 mi |
Asphalt
|
|
|
Explore Cleveland Park via its paved trails that wind through the trees and fields, connecting the park's facilities and amenities.
The park includes the John B. Cleveland Event Center, picnic...
|
SC |
1.5 mi |
Asphalt, Concrete
|
|
|
The Estatoe Trail is a relatively flat trail, spanning just over 5 miles. About 1 mile (northwest end) follows the old Carr Lumber Company railway corridor and extends into the Pisgah National Forest...
|
NC |
5.6 mi |
Asphalt, Boardwalk, Concrete, Gravel
|
|
|
The French Broad River Greenway links three of Asheville's parks: Hominy Creek River Park, Carrier Park, and French Broad River Park. The trail follows the river, coursing through a wooded strip of...
|
NC |
3.5 mi |
Asphalt
|
|
|
Note: USC Upstate Passage is now open from the Rampey Center Trailhead to where it meets the Hub City Passage. The North Loop is still closed while under restoration.
The USC Upstate Passage is...
|
SC |
2.2 mi |
Dirt
|
|
|
The Wadsworth Trail parallels Willis Road from Harmon Drive to Hawk Creek Drive, with a spur heading south along SR 42-4382/Caldwell Drive. The Willis Road portion is 1.85 miles (one way), while the...
|
SC |
2.8 mi |
Asphalt
|
|
|
Southport Road Path follows the south side of Southport Road from Cedar Springs Road to South Avenue. Heading west from Cedar Springs Road, the multi-use path passes the 295 Sports Complex, a DMV...
|
SC |
3 mi |
Asphalt, Concrete
|
|
|
The trail runs from the heart of Belton north towards Williamston. Beginning from the Belton Library, the trail travels north within the former Southern Railway corridor, paralleling Main Street. The...
|
SC |
1.2 mi |
Asphalt, Concrete
|
|