Find the top rated atv trails in Eldersburg, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.
We had heard good things about this trail, and were able to visit and ride circa 26 miles out and back yesterday, (June 4). This is a wonderful and very scenic trail with amazing views of the river and bucolic landscape. Much of the trail is shaded which helped during the heat but also adds to the allure of the trail. The Trail Welcoming Center is well maintained and the staff there very friendly and helpful. In addition, the rest room(s) were immaculate! I can't recommend this trail highly enough, and we will absolutely, (the Good Lord Willing), return to ride anytime we have the opportunity! Thanks for developing and maintaining such a marvelous and beautiful venue for relaxing and enjoying nature at its finest. We also stopped and had lunch at a wonderful tavern about 10 miles from the Welcome Center that is right along the trail. Very welcoming, great food, and very friendly clientele! Fantastic all around Great Experience!
With the exception of the mile just north of Mt Vernon, all the root cracks have been ground down to nearly smooth. Would probably be acceptable on a road bike, but more comfortable on hybrid or gravel bike.
Just completed York to Maryland . Stopped in Railroad to spend the night at The Jackson House B and B. Great place. Ale Craft brewery nearby was excellent. Coming south through York was a bit of a challenge. We got off trail twice for a short period. Needs to be better marked
Most of this trail is not along streets. We often ride this trail round trip from Ballenger Creek Park to the other end which is near Dunkin Donuts. We often see deer. There are two bridges over Ballenger Creek, and an underpass at New Design Road which keeps trail users away from traffic. There are a few air pump and tool stands along the trail. The western half mile is on sidewalk along the road, with traffic light protection for crossing.
What an amazing trail. Beautiful scenery, smooth, lots of areas to take a break, or break the trail up. Great for new riders.
The amazing smell of the flowers at the start of the trail would be worth another ride for that alone. (We started at Welty Road Park.) Lots of hills, definitely a workout, some shade and some sun. The creek is absolutely beautiful.
From Dupont Circle in DC out to Purcellville in VA is almost exactly 50 miles. So hard core cyclists can do a century, while less extreme pedalers can make a two day trip out of it. And, as there are many Metro stops along the trail, cyclists can also do rides of varying lengths along different sections. An amazingly versatile trail in that regard. All of which — plus the C&O Canal (360 miles r/t from DC to Cumberland), Mt Vernon Trail (42 miles rt from DC to Mt Vernon), Rock Creek Park trail (45 miles rt from DC to Lake Needwood) should make DC the top cycling destination in the US.
Whether a multi-day ride from DC 180 miles to Cumberland or individual day rides along the tow path next to the C&O canal, this trail is awesome. And now that much of it has been resurfaced to be crushed granite rather than just dirt, muddy rides will no longer be a problem after and during rains. One of the top 10 bucket list rides in the US, easily.
Very easy to find the trail from any of the nearby red line stops which allows for easy segmenting if you don’t want to do the entire trail. Very runner friendly the entire way. It’s a great resource to have in the middle of the city.
Good mountain bike trail that as described in the trail overview traverses up and down the "rolling" hills with many areas of no shade. If you start up at the Germantown Soccerplex, I suggest you park near the BMX bike course and south along the tree line and you come across the starting marker for the Powerline trail (about a tenth of a mile down).
After being on the back burner for most of the past decade, progress on building a multi-use trail between York and Hanover is moving forward again.
As its name implies, the Hanover Trolley Trail was originally envisioned to follow the route of the York-Hanover Fast Line, a trolley service that connected York City with the southwestern boroughs of Spring Grove and Hanover between 1909 and 1939. Two short segments of the trail, each about 1.5 miles in length, were constructed on sections of the old trolley line, one from Moul Field in Hanover east to Gitts Run Road in Penn Twp., and another from Hosiery Alley in Spring Grove east to Martin Road in Jackson Twp. in the late 2000's/early 2010's.
Unfortunately, efforts to continue building the trail along the old trolley line stalled due to the fact that some sections had reverted to private ownership while others were converted to public roads. To work around this, newer segments of the trail will be routed along an inactive Genesee & Wyoming rail line that closely parallels the old trolley line for most of its length. The first section of trail along this new alignment was built on the east side of Spring Grove from the RR trestle on the original alignment southwest through Spring Grove Community Park to the corner of Main Street and Railroad St. next to the fire station in 2022.
Now, two years later, an additional 2 miles of the trail have been built along the old RR line from the trestle northeast to the Jackson Twp. line, immediately west of an abandoned bridge over Sunnyside Road. The first 1.5 miles of this section parallels an existing segment of the trail and the two alignments are connected via a half mile of Martin Road, giving users the option of riding or walking a loop.
Unlike the segment that it parallels on the trolley line, which crosses rolling farm fields, the new section passes through meadows and woodlands along the West Bank of the Codorus Creek. Observant trail users will note the concrete abutments to a now demolished bridge over the creek and a small family cemetery that sits on the side of a hill southwest of Martin Road. After passing a bucolic hamlet at Martin Road, the trail reenters the woods and follows the creek to a dead end immediately west of the old RR bridge. This bridge is currently barricaded and not open for use, and there is no public access to Sunnyside Road. The most notable features along this section include the clear waters of the creek and old rock cuts that were dug or blasted out to build the RR.
Although it does not yet connect to Bair or West York, this newest section of the Hanover Trolley Trail is a big step forward for the project. Efforts are already under way to extend the trail southwest to Gitts Run Road along the old rail line and to connect with the existing segment east of Hanover. Once that is accomplished, the portion from Sunnyside Road to Bair should be completed, and a feasible alignment through West Manchester Twp. to York City is currently under study.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!