Wheeling Heritage Trails

West Virginia

Wheeling Heritage Trails Facts

States: West Virginia
Counties: Ohio
Length: 16.5 miles
Trail end points: Short Creek Rd. and SR 2 (Short Creek) to 48th St. and Water St. (S. Wheeling) and Lava Ave. at Jr. Ave. (Elm Grove)
Trail surfaces: Asphalt
Trail category: Rail-Trail
ID: 6015540
Trail activities: Bike, Inline Skating, Fishing, Wheelchair Accessible, Mountain Biking, Walking, Cross Country Skiing

With Unlimited:

  • Export to My Trail Guide
  • Create Guidebook
  • Download GPX
  • Download Offline Maps
  • Print Friendly Map
Upgrade Now

Register for Free with TrailLink Today!

View over 30,000 miles of trail maps
Share your trail photos
Save Your Favorite Trails
Find New Trails Near You
Leave reviews for trails
Submit new trails to our site
Register Now

Wheeling Heritage Trails Description

The Wheeling Heritage Trails running on the former B&O line are known locally as two trails that connect in downtown Wheeling: the Ohio River Trail and the Wheeling Creek Trail. The route is flat and paved, and beautiful signs along the way provide a self-guided tour of Wheeling's past.

The Ohio River Trail segment runs from 48th Street at Water Street in South Wheeling north to Pike Island Locks and Dam in Clearview. The trail provides an urban escape and an opportunity to soak up local history and modern industry in this historical city. The route follows the eastern bank of the Ohio River, once the lifeblood of the city's manufacturing industry. Barges still go up and down the river, and with good timing and patience you can watch one progress through the series of locks. Take a break to rest on a bench and you will be rewarded with a splendid view of the river and wildlife. This trail connects to the Wheeling Creek Trail at Heritage Port.

From downtown Wheeling, the Wheeling Creek Trail heads east to Elm Grove. Along the way, you'll cross high above Wheeling Creek on the Hempfield Viaduct and pass through Hempfield Tunnel, built in 1904. This segment of the Wheeling Heritage Trails is less urban and meanders along a wooded corridor.

It is worth nothing that at the trail's northern terminus, you can pick up the nearly 7-mile Brooke Pioneer Trail and continue your journey all the way to Wellsburg for a more substantial ride.

Parking and Trail Access

To get to the starting point from downtown Wheeling, travel north on River Road and look for Pike Island Locks and Dam on the left. The parking lot is in front of the dam. The southern endpoint is located at the intersection of 48th Street and Water Street in downtown Wheeling.

Wheeling Heritage Trails Reviews

We were staying at the Ogelbay Resort in WV and took a ride on the Wheeling Heritage Trail which follows a portion of the Ohio River. The trail is ok but if your looking for a scenic trail along a river don't bother. The trail is paved and in decent shape but you see more of the gritty side of old industrial Wheeling than you see of the river. We're from the Pittsburgh area and in my experience the trails here are far superior.

I rode (bicycle) this trail by way of the Brooke County Pioneer Trail (which comes from the North). The majority of the Pioneer Trail's paved surface is in great shape. Wish I could say the same for this trail.

This trail, starting from the Pike Island Locks, is in desperate need of repair. Conservatively, I'd estimate that 75% of this trail is full of large, jarring cracks. And, they come one right after the other. They're the worst right by the locks, but there's miles upon miles of them. They subside once you get close to Wheeling. But, that's the minority of the ride.

If the cracks were filled, I'd give this trail 5 stars. I found the scenery nice, and the trail itself is quite level. However, in it's current state, I don't think I'll be making a return visit.

Went to Elm Grove to get a ride in with two of my Boy Scouts who are working towards their merit badges. Loved the ride! The road markings around WVNCC are somewhat faded and the return route by the Boury Loft project is blocked by construction equipment and debris. Overall, the trail is in good shape. Several signs were defaced and there are no mileage markers on the Elm Grove section, but it was a beautiful day with good company. Did 15.2 miles on an up-and-back route, using Elm Grove as our terminus.

Accordion

When you go north of the heritage port in Wheeling, the cracks have been paved, and where there was a go around, is now done and you don't have to go around anything trying to figure out how to get back. I wouldn't go past that point before it reopened(would go to the Local grocery before turning around) due to having extra wheels.

The trail is very nice but you need to make sure your tires are fully inflated; there's quite a number of seams /bumps that could cause pinch flats.

Addition to hallsballs0 review: it gets MUCH better further along. You turned around just about the place it gets better. It's true there are cracks, but my view is there are only a few large cracks, and most are small ones. Then about mile 11, it suddenly starts to be smooth. Perhaps a more recent paving. But it's smooth, and while it follows Highway 2 for a bit, there are long stretches where you feel like you're in the woods, because you are. Very quiet and peaceful. There's a rest area with an outhouse and a nice walking path (to stretch my legs) a hundred yards to the river. Seamless transition to the Brooke Pioneer trail, which is also beautiful and woodsy. I didn't finish the Brooke Pioneer trail because I had a time constraint. But I wanted to let hallsballs0 know that the trail does lose the cracks, and is smooth the rest of the way. And I wasn't as bothered by the cracks as s/he was.

I absolutely loved riding this trail! Even though I grew up in Wheeling, I appreciated going through the various sections of Wheeling on my bike. I felt safe the entire trip and it was easy to bike though I am a beginner.

If you're coming from the Pittsburgh area I don't think this trail is worth the drive. I was headed to Wheeling anyway though, so I took my bike along.

I only rode from the beginning of the trail to the ten mile marker and back, but I can't imagine that the rest of the trail would have been much better.

Most of this trail is pretty urban running past factories, run down and abandoned homes and along side of a very busy road. And although it runs along side the river the actual view of the river is obstructed by thick trees for a lot of the ride.

Around the 6-7 mile mark there is a sign that says, trail detour ahead, but when you get "ahead" it doesn't tell you where to go. I followed another rider up the sidewalk of an elementary school, through their parking lot and then onto the road for approx three blocks before cutting back over to the trail. I rode with the rider I had followed through the detour for a few miles and she said the detour has been like that for years now. Crazy!

As far as the trail surface goes, it is technically paved, but it has LARGE cracks across the entire trail approx every 15 feet. So the entire ride is thump-thump, thump-thump from riding over the cracks. It is not suitable for rollerblading whatsoever.



I started in Elm Grove and rode to the river then headed south. I enjoyed the scenery and the history signs along the way. More wildlife than I expected to see, chipmunks, squirrels, a couple ground hogs, 2 blue herons and a hawk. There were a few tree branches down partially blocking the trail but otherwise clear. Some cracks in the asphalt made for some bumpy spots but my mountain bike handled them just fine; they would have been jarring on my old Cannondale. I plan to ride again soon and head north to see that end of the trail. No easily accessible bathrooms along the route I took. No food establishments open Sunday 10am along the route I took and I did ride around the city a bit at the end of the Elm Grove trail portion.

This is a scenic trail along the river...however the trail maintenance is really lacking. The asphalt surface needs the large cracks sealed with tar or repaved. It is difficult to ride this trail when every twenty or so feet you're trying to avoid the large cracks. Also, there is an area not to far from Pike Island L&D (going towards Whlg.) that is developing into a sink hole. In a short time this is going to be a real danger. Sorry, I don't have the exact milepost but its close to the eagle observation signs. And, under the I-70 bridge closer to the town of Wheeling there is a large pothole that if left alone will eventually swallow the front tire of an unsuspecting rider. If you're already aware of these problems then I'm sorry for beating a dead horse . But I probably won't be back because there are tons of other trails to ride. Thanks for listening...

This trail was disappointing. We traveled from the eastern Pennsylvania for a "riding weekend" and anticipated a nice trail with river views.

Right below the dam and locks the surface has 3-inch-wide cracks. That might not be a problem for all terrain bikes, but for roller-blades, skateboards, scooters or Trikkes, it meant I spent more time looking at the asphalt, than at the scenery.

The scenery was disappointing as well. Running right next to the river, I expected it to be nicer. It occurs to me that if the local businesses and civic groups would all "adopt a mile" for beautification the trail could be far more pleasant.

At some points we were riding right next to the highway. While that is unfortunate, it could be overlooked if the rest of the trail was wonderful.

It seems that the region has fallen on hard times but it could become a tourist destination with the right visionaries.

I am glad we came to check out the trail, but sadly, in the current shape it is in, I would not be inclined to plan a return visit.

The main trail along the Ohio River now runs from 48th Street in South Wheeling to Wellsburg WV. A total of 18 miles one way. Totally paved and mostly level. Wheeling has a nice trail system.

This trail wasn't what we expected, being in West Virginia. We were hoping for a more scenic route. We began in downtown Wheeling and worked our way north. There's almost no shade along the way and not much to look at. It also winds around Route 2 and we were literally riding next to fast moving traffic. At the end of this route, we did continue on another trail and it became much more scenic, though we were unable to complete that trail.

We did this ride on a sunny day after driving over from Indianapolis on our way to Mt. Morris PA for the MX race there on Sat. Excellent weather, saw a TON of groundhogs on the ride! The trail starting at 48th Street was well marked with signage regarding food restrooms etc. After leaving the Historic Wheeling area the signage went away. Trail was very well maintained, not many bikers this day though even with the great weather. We had the map with us but forgot that the end point was the locks, we continued on to the Brooke Pioneer Trail but we turned around before the very end as we wasn't sure how many miles that trail was. We ended up doing 35+ miles that day total. Nice hills, great scenery along the river. On the return trip we saw a groundhog and a light colored bunny almost playing with each other. A local fellow rider told us the bunny had been released by someone and was pretty tame. It did not run from us as we approached. Many other groundhogs also stayed near us even when we stopped, one was very close to a lounging cat we saw as well! We did see a small deer, many squirrels, chipmunks and birds. It would be nice for them to mark the end of the trail and mention that the connecting trail is an additional so many miles so out of towners would realize it easier. Overall a very nice trail that I would enjoy riding again.

Wanted to find a flat trail that was paved because of all the rain we've had lately. Noticed this rail trail come up on geocaching.com because of all the new caches placed nearby...so off I headed. This trail was great but I'm sure glad it wasn't too hot today, not much shade along the way! I will be headed back soon to finish the trail with my dog.

I rode the Greater Wheeling trail today and found it to be surprisingly better than I had anticipated. Don't judge the trail by the industrial areas that you drive by to get to it because it is far more scenic. Park at the Pike Island lock and dam, which is located at 40-09.203N and 080-41.881W, and follow the paved trail south toward the I-70 and I-470 bridges. There are particularly nice stretches with great river views including the impressive dam itself. You will likely see several barges working their way upriver as you ride. And what surprised me most was the abundance of deer - they apparently come down out of the hills to drink at the river so have a camera ready. I've ridden over 1,500 miles of rails-to-trails and the Greater Wheeling trail has far better signage than any others that I've ridden. Most of the signs relate the history of the area and of local business and are actually interesting to stop and read. You can continue south through the riverfront area downtown but the signage stops at the I-470 bridge. There isn't much to see south of there although you can ride to the southern terminus at 48th and Water Streets located at 40-02.004N and 080-43.737W. From the dam to this point and back is 15.7 miles. From there you can head over to the Hempfield Viaduct located at 40-04.393N and 080-42.648W. Originally built in 1904 for the B&O railroad, it is certainly a highlight of the trail. Those who continue east will find the eastern terminus near 40-02.813N and 080-39.843W although this is approximate as I didn't ride that far east...I just wanted to see the riverfront and the viaduct. If you just want to see the viaduct, park near 40-03.964N and 080-41.604W as it is only a 5-minute ride from there and would be extremely creepy just after sunset.

Any trail with riverfront scenery, a dam, a tunnel, and great signs deserves at least four stars!

May 7, 2011, GREAT NEWS!! Started a ride North from Wheeling Heritage Port and discovered that I could ride all the was to Wellsburg.. The Brooke Pioneer Trail is now complete. The trail is completely paved and very flat.

i started my ride on the island after crossing the historic suspension bridge i rode the trail from down town wheeling north to beach bottom the paved trail ends but i continued on dirt trail through woods along the river for about 3 miles then picked up a paved trail again and continued north all the way to north as far as it went and it dead ended into a park in wellsburg there was a few jogs on the road but i was able to follow pretty easy i actually think the trail name changed twice but its all the same path and it was a fun ride with lots on places to stop warwood is a nice town i saw historic warwood tool they were painting that day any way after the ride north i traveled south to benwood it got a little smelly by the wheeling water plant but all in all the wheeling bike path is a great ride from 1 end to the other with lots of places to stop i rode this trail several times when i was in town visiting family this was another trail that left me wanting more and i will ride again next time im in town i also recommend this trail to anyone

Riding the Wheeling Heritage trail itself is nice, but watch out if the Wheeling Heritage Port is busy with a festival or an event… The place can be quite bike unfriendly… The main trail along the Ohio river goes right through this Port area, and it’s difficult to get around the Port area when an event is going on. I been stopped by the city Police and told to get off my bike and turn around, not being allowed to continue on while an event was going on at the Heritage Port area. The reason I’m writing this review is because again just recently my friend and I were harassed by event participants for just trying to get through the trail there while an event was going on. I’m personally going to start to avoid this Heritage Port area, and turn around before I get to this problem area.

"This largely straight and flat trail has pleasant views of the ""old Ohio River"" and interesting views of old town Wheeling, WV. The trail goes through town. There are many interesting side stops. It's very safe and clean. There's little or no wildlife."

"Wheeling has a beautiful trail! Wheeling to my surprise was a Beautiful City. The trail takes you thru industrial (but Clean) areas, thru a nice city river front park area & beautiful new & old residential areas - all along the Beautiful Ohio River. The north end of the trail is Pike Island Dam & Locks. You can watch boats & barges go in & out of the locks. A fun few eateries along the way that serve outdoors."

"I've ridden the Wheeling Trail many, many times & enjoy it tremendously. A wonderfully smooth, paved & straight trail that runs along the banks of the Ohio River most of the way. It's an easy trail to walk, blade or ride with only a couple of relatively short grades encountered. If you start at the north access at the Pike Island Lock & Dam it's at most about a 1/2 degree grade downhill the whole way & vice-versa if you start at the southern-most point.
Expect to encounter most trail-type activities(walking, biking,etc.)There are many families that walk & push baby strollers and quite a few seniors walking & biking at a leisurely pace. The people here are friendly - expect eye contact & a smiling nod or greeting when passing someone by. Since this trail runs along the linear edge of Wheeling, it's safe and you are never more than a few hundred yards from a store, restraunt, etc. There are also a few park benches placed along the route to rest & view the scenery."

"I grew up cycling in the Wheeling area during the 70's and it was nice to return home years later to see the city committed to cycling with two trails. You can ride along the bluff overlooking the Ohio River from South Wheeling to Pike Island Dam, where there are restrooms and can watch barge traffic go through the locks. You can add to the 8.5 miles by following the bike lane through Wheeling out 16th Street and follow another trail out Big Wheeling Creek, through the old Rock Point Tunnel and out to Elm Grove and back. Or, you could continue through Elm Grove, out Kruger Street, cross the creek at the bridge, make a left, and you can continue with a beautiful, 8 mile+ road ride out Big Wheeling Creek road to Burches Run Lake, a relatively flat ride along the creek bed that gets somewhat hilly further out. All combined, you can enjoy a 30-mile pleasent ride."

Trail Events

This trail does not have any events yet.
Be the first to add one!

Add an Event

Nearby Trails

Glen Dale to Moundsville Rail-Trail

West Virginia - 3.4 miles

The Glen Dale to Moundsville Rail-Trail runs for 3.4 paved miles between Glen Dale City Park and Moundsville Riverview Park. The trail parallels the...

National Road Bikeway

Ohio - 2.6 miles

Though only 2.5 miles, the National Road Bikeway features an impressive below-grade tunnel, which was built in 1902. The narrow tunnel is 532 feet...

Brooke Pioneer Trail

West Virginia - 6.7 miles

The Brooke Pioneer Trail follows the east bank of the Ohio River between Wellsburg and the Brooke–Ohio County line at Short Creek. Here the Brooke...

Accordion

Wellsburg Yankee Trail

West Virginia - 2.2 miles

The Wellsburg Yankee Trail is a short, paved rail-trail that spans the entire length of Wellsburg, a small city on the Ohio River in West Virginia’s...

Panhandle Trail

Pennsylvania - 29 miles

The Panhandle Trail is another jewel in the Pittsburgh metro area trail system. A Conrail line, known as the Panhandle Railroad, once connected...

Conotton Creek Trail

Ohio - 11.2 miles

Once the corridor of the Wheeling and Lake Erie Railway, today the 11.2-mile Conotton Creek Trail offers complete immersion in a bucolic setting in...

East Wetzel Rail-Trail

West Virginia - 1.5 miles

The East Wetzel Rail-trail is a 1.5 mile pathway that runs through the town of Hundred in West Virginia. The trail provides connectivity to various...

Montour Trail

Pennsylvania - 46 miles

The Montour Trail follows a portion of the old Montour Railroad, which was built between 1877 and 1914 to link the Pittsburgh and Lake Erie Railroad...

Greene River Trail

Pennsylvania - 5.2 miles

About 60 miles south of Pittsburgh, the beautiful Greene River Trail parallels the Monongahela River as it winds through the coal mining region of...

Great Guernsey Trail

Ohio - 6.1 miles

The Great Guernsey Trail runs for 6 miles from the eastern edge of Cambridge to Lore City. The paved trail occupies a former CSX railroad corridor...

Montour Trail - Airport Connector

Pennsylvania - 6.5 miles

The Airport Connector is a spur off the impressive Montour Trail that circles the western outskirts of Pittsburgh. The paved pathway begins just off...

Joel McCann Memorial Trail

West Virginia - 1.1 miles

The Joel McCann Memorial Trail is part of what will one day be a 16-mile rail-trail from Barrackville to Mannington following the former Baltimore &...

Download the TrailLink mobile app and take TrailLink with you!
Support Trails and Pick Your FREE Guidebook + Trail Kit Today!
Pledge to make a difference for trails!

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews
OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!
OR