Bridgeport, CT Atv Trails and Maps

989 Reviews

Looking for the best Atv trails around Bridgeport?

Find the top rated atv trails in Bridgeport, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
0 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 30,000 of trail maps
  • Share your trail photos
  • Save your own favourite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Trails by activity

Recent Trail Reviews

Bethpage Bikeway

Many Trails in One Place

December, 2018 by slipsoup

This is a nice trail, which passes through the Massapequa Preserve on the southern end. The northern end of the trail is located near the Syosset Long Island Railroad station, which makes it an easy destination for riders from the City. There are some street crossings, easy to navigate. There is one part of the trail that is confusing, where it crosses Sunrise Highway. There is a dental office across the street. When you cross the Highway, continue to the right and the trail picks up in about an eighth of a mile. The Bethpage State Park is huge. There are numerous mountain biking trails in the area. There are bathrooms at the Bethpage State Park parking/picnic area.

EPCAL Alternative Transportation Path

EPCAL and Wildwood connection

December, 2018 by detail_tl

Just a mile or so due North is another EXCELLENT off-road biking destination: Wildwood State Park on Long Island Sound. 700 undeveloped acres of mountain biking and hiking trails open to the public.
https://parks.ny.gov/parks/68/details.aspx

Hudson River Greenway

great trail with incredible sights

October, 2018 by hardboy1864

This trail is a must, but be carful about the crowds.

Accordion

Cross Island Parkway Trail

Newly paved trail is now open from the marina to Northern Blvd. This is a great ride especially during the week when it is not so crowded. As another reviewer stated one can extend their ride into nearby Fort Totten.

October, 2018 by golfdrm

Newly paved trail is now open from the marina to Northern Blvd. This is a great ride especially during the week when it is not so crowded. As another reviewer stated one can extend their ride into nearby Fort Totten.

Pequonnock River Trail

Dangerous crossing- Whitney Ave, Trumbull

October, 2018 by mrizio72

I love to walk the trail and have since 1971, the cross over on Whitney Ave in Trumbull is Terrifying, The cars cannot see any one passing the road way until they are in the roadway. The line of sight is completely obscured by vegetation and the small sign in the middle of the Street??? I have seen people run right across the road with out even slowing down prior to or while crossing Whitney Ave. I personally saw a woman hit the side of a car as she could not stop running in time to avoid the car. This section is an accident waiting to happen. Whitney Ave. crossing needs to be safer for both motorist and trail user.

Bronx River Greenway

Short version starting in Bronxville to Kensico Dam (24mi RT)

September, 2018 by jonng911

No meter parking along Kimball Ave before Palmer Rd.
To avoid getting lost trying to connect to the bike path after passing the Scarsdales Train Station: exit at the station go north on East Pkwy; Rt on Crane Rd; Lf on Fox Meadows Rd (after Fenimore Rd) it changes to Walworth Ave and Lf on Greenacres Ave. The 2nd entrance to the trail is about 1/5 mile on the right.
There are restrooms when you reach the Kensico Dam.

EPCAL Alternative Transportation Path

Great Path - Good for Beginners and Families

September, 2018 by wascallywabbit

Paved path of just about 8.5 miles (all off the regular roadways) provides a great pathway for all skill levels. Beginners can take a leisurely ride with gradual inclines or more experienced riders can challenge themselves with speed and cadence. The path is completely free of roadway dangers as it is only open to walkers, bikers, skaters, etc. It has quite a bit of shady areas to stay out of direct sun due to its location near the woods. Some nice natural scenery. Start/end point located near Veteran Memorial and Isaac Dog Park for other points of interest.

Shore Parkway Greenway Trail

Great path for any sport or hobby

September, 2018 by gallina1064

This bike path needs to be Swept with a sanitation truck. Sweeper at least once a month I have gotten so many bike tire flats I usually ride from howard beach to the verrazano and back or I do the 20 mile loop to Rockaway and back home it needs a good cleaning and May be more lighting Thank YOU

Air Line State Park Trail

Response to Construction News

September, 2018 by blueskye

In April 2018 the Windham Town Council approved $1,300,000 for rehabilitation on the Willimantic River bridge behind Mackeys. This would include 800 feet of trail. It was put out for bids due on July 26th. I haven't seen any work yet. There is still the bridge over the Hop River which looks to be in terrible shape and may never be repaired.

Farmington Canal Heritage Trail

Last gap in Cheshire closed

September, 2018 by pausau

Quick update that a stretch of trail less than one mile between Cornwall Av. and West Main St. in Cheshire is now officially opened, avoiding a detour onto Willow St. There is now a continuous, paved, off-road stretch of trail some 25 miles from Temple St. in downtown New Haven to Lazy Lane in Southington.

Air Line State Park Trail

Construction News

September, 2018 by CW4

I just road the Airline Trail across the Willimantic River and then toward the newer ending at Mackie's Ag. Store near the Columbia town line. It was in fine shape. However, what I was looking for is evidence that the work on the Willimantic River bridge was started. I found nothing underway. I road to the easterly end of the Hop River Trail hoping that it was starting at that end. No such luck. Does anyone out there have any information on when this section will be started?

Charter Oak Greenway

Construction News

September, 2018 by CW4

As of September 8th 2018 there is only one thing holding back the expansion of the Charter Oak Trail from Porter Street to the Hop River Trail in Bolton, the bridge over Camp Meeting Road. It should be the completion of just a few details that will allow this section to be open to the public: accepting the last bridges and some land scaping work. Once the bureaucracy is done, riders will be able to connect from East Hartford to Bolton and beyond. That's about 15 miles of the Charter Oak Trail and 20 miles of the Hop River Trail that will be connected, finally. Of note, there are two more bridges in Windham and Columbia at the eastern end of the Hop River Trail that are going to bid this fall. Once done, it will open a trail from the Hartford area to Pomfret CT. Be patient. What's another year or so to get all these trails linked.

Find Nearby City trails

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

OR