Southbury Snowmobiling Trails and Maps

1178 Reviews

Looking for the best Snowmobiling trails around Southbury?

Find the top rated snowmobiling trails in Southbury, whether you're looking for an easy short snowmobiling trail or a long snowmobiling trail, you'll find what you're looking for. Click on a snowmobiling trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
0 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 30,000 of trail maps
  • Share your trail photos
  • Save your own favourite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Trails by activity

Recent Trail Reviews

Hudson Valley Rail Trail

Great ride!

October, 2018 by omalleyclan

Parked at western end of trail in a very new parking lot on Rt 299 across from the Lowe's. Trail is beautifully paved all the way to the Walkway Over the Hudson, some of the pavement appeared to put down only days before we rode on it. State of NY is doing a fantastic job making this and the Walkway a great destination ride, installing modern bathrooms/visitor center on each side of the Walkway (open already on the west side of the river and under construction on the eastern side). On eastern side, seamlessly connects to another 13 mile rail trail. You will have to ride very slow over the Walkway, as there are a lot of walkers, but you're going to want to stop and take pictures anyway!

Wallkill Valley Rail Trail

Neat Country Trail

October, 2018 by dstinson3

We enjoyed the ride through the country side and found the trail fairly empty on a early October Wednesday morning. Several parts of the trail were muddy and narrow. The best stop was the Rosendale Trestle with spectacular view. Worth riding again.

Hudson Valley Rail Trail

Joint Ride with Walkway Over the Hudson and Duchess Trails

October, 2018 by dstinson3

We parked at Tony Williams Park rode past the Walkway over the Hudson down to mile marked 8 on the Duchess Trail where we stopped on a bench for lunch. The path is wide and mostly smooth and only one construction area (putting in a modern restroom on southside of the Walkway). We would rate this the best trail we have ever been on as far as access, parking, restrooms (including port-a-potties in some areas) and very few rode/driveways to cross. We rode on a Thursday morning early October and the path was not crowded. Our 20 mile round trip was Fantastic!

Accordion

Heritage Trail (NY)

Beautiful trail

October, 2018 by kelly.marsicano

This is a beautiful paved trail for biking, running, walking, strollers, and wheelchairs. It is well-kept and offers scenic views--from rolling fields, to bridges, to train cars, to even an old cemetery. My husband and I biked the entire length and back on a gorgeous fall day. It was a really nice ride, but be aware that it is often a false flat trail. One other major thing to be aware of is that you CANNOT access this trail from Mary Harriman Park in Harriman. Your best bet is to access if from Monroe. If heading east on the trail toward Harriman, the trail comes to a dead end fenced off bridge with no access and you're forced to turn around and go back the way you came. Hopefully someday they will fix this and extend it into Harriman for better access. That is my only complaint about this otherwise beautiful trail.

Pequonnock River Trail

Dangerous crossing- Whitney Ave, Trumbull

October, 2018 by mrizio72

I love to walk the trail and have since 1971, the cross over on Whitney Ave in Trumbull is Terrifying, The cars cannot see any one passing the road way until they are in the roadway. The line of sight is completely obscured by vegetation and the small sign in the middle of the Street??? I have seen people run right across the road with out even slowing down prior to or while crossing Whitney Ave. I personally saw a woman hit the side of a car as she could not stop running in time to avoid the car. This section is an accident waiting to happen. Whitney Ave. crossing needs to be safer for both motorist and trail user.

Bronx River Greenway

Short version starting in Bronxville to Kensico Dam (24mi RT)

September, 2018 by jonng911

No meter parking along Kimball Ave before Palmer Rd.
To avoid getting lost trying to connect to the bike path after passing the Scarsdales Train Station: exit at the station go north on East Pkwy; Rt on Crane Rd; Lf on Fox Meadows Rd (after Fenimore Rd) it changes to Walworth Ave and Lf on Greenacres Ave. The 2nd entrance to the trail is about 1/5 mile on the right.
There are restrooms when you reach the Kensico Dam.

EPCAL Alternative Transportation Path

Great Path - Good for Beginners and Families

September, 2018 by wascallywabbit

Paved path of just about 8.5 miles (all off the regular roadways) provides a great pathway for all skill levels. Beginners can take a leisurely ride with gradual inclines or more experienced riders can challenge themselves with speed and cadence. The path is completely free of roadway dangers as it is only open to walkers, bikers, skaters, etc. It has quite a bit of shady areas to stay out of direct sun due to its location near the woods. Some nice natural scenery. Start/end point located near Veteran Memorial and Isaac Dog Park for other points of interest.

Air Line State Park Trail

Response to Construction News

September, 2018 by blueskye

In April 2018 the Windham Town Council approved $1,300,000 for rehabilitation on the Willimantic River bridge behind Mackeys. This would include 800 feet of trail. It was put out for bids due on July 26th. I haven't seen any work yet. There is still the bridge over the Hop River which looks to be in terrible shape and may never be repaired.

Farmington Canal Heritage Trail

Last gap in Cheshire closed

September, 2018 by pausau

Quick update that a stretch of trail less than one mile between Cornwall Av. and West Main St. in Cheshire is now officially opened, avoiding a detour onto Willow St. There is now a continuous, paved, off-road stretch of trail some 25 miles from Temple St. in downtown New Haven to Lazy Lane in Southington.

Air Line State Park Trail

Construction News

September, 2018 by CW4

I just road the Airline Trail across the Willimantic River and then toward the newer ending at Mackie's Ag. Store near the Columbia town line. It was in fine shape. However, what I was looking for is evidence that the work on the Willimantic River bridge was started. I found nothing underway. I road to the easterly end of the Hop River Trail hoping that it was starting at that end. No such luck. Does anyone out there have any information on when this section will be started?

Hop River State Park Trail

Great trail

September, 2018 by albern36

This is a really nice trail, most of it is under a canopy of trees, nice scenic spots on the river if you want to stop for lunch. I took my hybrid the full 40 miles out and back. Except for maybe a half mile of stones and gravel in Bolton Notch where a mountain bike would be better, the rest was nice hard pack dirt and pulverized stone. I saw thin tire street bikes on this trail as well. There are very long stretches on this trail where you don't cross any roads, and except for maybe one exception, most of the crossings have little traffic and are side roads. I also like the width of the trail. Two thirds of the trail is very wide. After Andover it gets a bit more narrow but there were also fewer people on the trail towards Willimantic. The only down side is that the trail terminus in Willimantic is pretty anticlimactic. You come to a road that that's it. No parking lot or grassy area, just a road and you know its over unless you want to continue on-road biking to Willimantic.

Charter Oak Greenway

Construction News

September, 2018 by CW4

As of September 8th 2018 there is only one thing holding back the expansion of the Charter Oak Trail from Porter Street to the Hop River Trail in Bolton, the bridge over Camp Meeting Road. It should be the completion of just a few details that will allow this section to be open to the public: accepting the last bridges and some land scaping work. Once the bureaucracy is done, riders will be able to connect from East Hartford to Bolton and beyond. That's about 15 miles of the Charter Oak Trail and 20 miles of the Hop River Trail that will be connected, finally. Of note, there are two more bridges in Windham and Columbia at the eastern end of the Hop River Trail that are going to bid this fall. Once done, it will open a trail from the Hartford area to Pomfret CT. Be patient. What's another year or so to get all these trails linked.

Find Nearby City trails

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews
OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!
OR