Barre, VT Fishing Trails and Maps

230 Reviews

Looking for the best Fishing trails around Barre?

Find the top rated fishing trails in Barre, whether you're looking for an easy short fishing trail or a long fishing trail, you'll find what you're looking for. Click on a fishing trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
11 Results
Activities
Length
Surfaces
Type

Ammonoosuc Rail Trail

19.2 mi
State: NH
Ballast, Dirt, Gravel, Sand

Black Pond Trail

0.8 mi
State: NH
Dirt

Cambridge Greenway

1.4 mi
State: VT
Crushed Stone, Gravel

Colchester Bayside to Village Path

3.8 mi
State: VT
Asphalt

Cross Vermont Trail

87.4 mi
State: VT
Asphalt, Concrete, Crushed Stone, Dirt, Grass, Gravel

Cross Vermont Trail (Montpelier & Wells River Trail)

22.9 mi
State: VT
Ballast, Dirt, Gravel, Sand

Franconia Brook Trail

7.2 mi
State: NH
Ballast

Island Line Rail Trail

13.4 mi
State: VT
Asphalt, Gravel

Lincoln Woods Trail

2.7 mi
State: NH
Ballast

Mascoma River Greenway

2.1 mi
State: NH
Asphalt, Gravel
Trail Image Trail Name States Length Surface Rating
The Ammonoosuc Rail Trail carries its users for 19.2 miles along the scenic river that shares its name and is itself a destination for fishing, kayaking, and canoeing. The trail passes through a...
NH 19.2 mi Ballast, Dirt, Gravel, Sand
The Black Pond Trail itself is short but it can be linked with other trails that run through the forest in the White Mountains of New Hampshire, just northeast of Lincoln. Specifically, the Black Pond...
NH 0.8 mi Dirt
Cambridge Greenway hugs the Lamoille River through the village of Jeffersonville in northern Vermont, about 30 miles northeast of Burlington. It is a four-season trail, popular with cross-country...
VT 1.4 mi Crushed Stone, Gravel
The Colchester Bayside to Village Path runs for nearly 4 miles along the southeast tip of Malletts Bay near Colchester Village. The path links the Malletts Bay Campground on the west end with...
VT 3.8 mi Asphalt
The Cross Vermont Trail (CVT) is a statewide route that links a number of Vermont trails and includes on-road sections. As of January 2016, 87 miles of trail are built and scattered across the state....
VT 87.4 mi Asphalt, Concrete, Crushed Stone, Dirt, Grass, Gravel
Locals lovingly describe the Cross Vermont Trail as a patchwork quilt that will ultimately form a 90-mile trail from Lake Champlain in the west to the Connecticut River in the east. A component of the...
VT 22.9 mi Ballast, Dirt, Gravel, Sand
The Franconia Brook Trail runs from just north of the confluence of the east branch of the Pemigewasset River and Franconia Branch. Note that bicycling is not permitted along the route. You can...
NH 7.2 mi Ballast
Update: As of September 2019, the Colchestor Causeway is closed for major repairs following damage from washouts. It will reopen in May 2020. Check the Colchester Parks & Recreation website for...
VT 13.4 mi Asphalt, Gravel
The Lincoln Woods Trail runs for 2.6 miles along the east branch of the Pemigewasset River. You can combine the trail with other trails that run through the forest in the White Mountains of New...
NH 2.7 mi Ballast
The Mascoma River Greenway is a planned 4-mile non-motorized pathway through the heart of Lebanon. The trail is envisioned to link West Lebanon to the Northern Rail Trail, which spans more than 50...
NH 2.1 mi Asphalt, Gravel
Many rail-trails start at a vintage depot, an old caboose, or a rusty locomotive acquired by the local historical society. The Warren to East Haverhill Railroad Grade Trail, however, starts at the...
NH 10.8 mi Dirt

Now, More Than Ever, Trails Matter!

During COVID-19, trails are being counted on as places where people can find solace and respite and we need your support to keep trails open and provide these critical FREE resources! Please continue to practice physical distancing and check the status of your trail before heading out!

Trails by activity

Colchester Bayside to Village Path

VT - 3.8 miles

The Colchester Bayside to Village Path runs for nearly 4 miles along the southeast tip of Malletts Bay near Colchester Village. The path links the Malletts Bay Campground on the west end with...

Island Line Rail Trail

VT - 13.4 miles

Update: As of September 2019, the Colchestor Causeway is closed for major repairs following damage from washouts. It will reopen in May 2020. Check the Colchester Parks & Recreation website for...

Mascoma River Greenway

NH - 2.1 miles

The Mascoma River Greenway is a planned 4-mile non-motorized pathway through the heart of Lebanon. The trail is envisioned to link West Lebanon to the Northern Rail Trail, which spans more than 50...

Cambridge Greenway

VT - 1.4 miles

Cambridge Greenway hugs the Lamoille River through the village of Jeffersonville in northern Vermont, about 30 miles northeast of Burlington. It is a four-season trail, popular with cross-country...

Franconia Brook Trail

NH - 7.2 miles

The Franconia Brook Trail runs from just north of the confluence of the east branch of the Pemigewasset River and Franconia Branch. Note that bicycling is not permitted along the route. You can...

Warren to East Haverhill Railroad Grade Trail

NH - 10.8 miles

Many rail-trails start at a vintage depot, an old caboose, or a rusty locomotive acquired by the local historical society. The Warren to East Haverhill Railroad Grade Trail, however, starts at the...

Colchester Bayside to Village Path

VT - 3.8 miles

The Colchester Bayside to Village Path runs for nearly 4 miles along the southeast tip of Malletts Bay near Colchester Village. The path links the Malletts Bay Campground on the west end with...

Accordion

Lincoln Woods Trail

NH - 2.7 miles

The Lincoln Woods Trail runs for 2.6 miles along the east branch of the Pemigewasset River. You can combine the trail with other trails that run through the forest in the White Mountains of New...

Black Pond Trail

NH - 0.8 miles

The Black Pond Trail itself is short but it can be linked with other trails that run through the forest in the White Mountains of New Hampshire, just northeast of Lincoln. Specifically, the Black Pond...

Cross Vermont Trail

VT - 87.4 miles

The Cross Vermont Trail (CVT) is a statewide route that links a number of Vermont trails and includes on-road sections. As of January 2016, 87 miles of trail are built and scattered across the state....

Mascoma River Greenway

NH - 2.1 miles

The Mascoma River Greenway is a planned 4-mile non-motorized pathway through the heart of Lebanon. The trail is envisioned to link West Lebanon to the Northern Rail Trail, which spans more than 50...

Ammonoosuc Rail Trail

NH - 19.2 miles

The Ammonoosuc Rail Trail carries its users for 19.2 miles along the scenic river that shares its name and is itself a destination for fishing, kayaking, and canoeing. The trail passes through a...

Island Line Rail Trail

VT - 13.4 miles

Update: As of September 2019, the Colchestor Causeway is closed for major repairs following damage from washouts. It will reopen in May 2020. Check the Colchester Parks & Recreation website for...

Cross Vermont Trail (Montpelier & Wells River Trail)

VT - 22.9 miles

Locals lovingly describe the Cross Vermont Trail as a patchwork quilt that will ultimately form a 90-mile trail from Lake Champlain in the west to the Connecticut River in the east. A component of the...

Cross Vermont Trail

VT - 87.4 miles

The Cross Vermont Trail (CVT) is a statewide route that links a number of Vermont trails and includes on-road sections. As of January 2016, 87 miles of trail are built and scattered across the state....

Cambridge Greenway

VT - 1.4 miles

Cambridge Greenway hugs the Lamoille River through the village of Jeffersonville in northern Vermont, about 30 miles northeast of Burlington. It is a four-season trail, popular with cross-country...

Colchester Bayside to Village Path

VT - 3.8 miles

The Colchester Bayside to Village Path runs for nearly 4 miles along the southeast tip of Malletts Bay near Colchester Village. The path links the Malletts Bay Campground on the west end with...

Cross Vermont Trail (Montpelier & Wells River Trail)

VT - 22.9 miles

Locals lovingly describe the Cross Vermont Trail as a patchwork quilt that will ultimately form a 90-mile trail from Lake Champlain in the west to the Connecticut River in the east. A component of the...

Accordion

Ammonoosuc Rail Trail

NH - 19.2 miles

The Ammonoosuc Rail Trail carries its users for 19.2 miles along the scenic river that shares its name and is itself a destination for fishing, kayaking, and canoeing. The trail passes through a...

Island Line Rail Trail

VT - 13.4 miles

Update: As of September 2019, the Colchestor Causeway is closed for major repairs following damage from washouts. It will reopen in May 2020. Check the Colchester Parks & Recreation website for...

Franconia Brook Trail

NH - 7.2 miles

The Franconia Brook Trail runs from just north of the confluence of the east branch of the Pemigewasset River and Franconia Branch. Note that bicycling is not permitted along the route. You can...

Warren to East Haverhill Railroad Grade Trail

NH - 10.8 miles

Many rail-trails start at a vintage depot, an old caboose, or a rusty locomotive acquired by the local historical society. The Warren to East Haverhill Railroad Grade Trail, however, starts at the...

Black Pond Trail

NH - 0.8 miles

The Black Pond Trail itself is short but it can be linked with other trails that run through the forest in the White Mountains of New Hampshire, just northeast of Lincoln. Specifically, the Black Pond...

Lincoln Woods Trail

NH - 2.7 miles

The Lincoln Woods Trail runs for 2.6 miles along the east branch of the Pemigewasset River. You can combine the trail with other trails that run through the forest in the White Mountains of New...

Mascoma River Greenway

NH - 2.1 miles

The Mascoma River Greenway is a planned 4-mile non-motorized pathway through the heart of Lebanon. The trail is envisioned to link West Lebanon to the Northern Rail Trail, which spans more than 50...

Recent Trail Reviews

Stowe Recreation Path

early spring riding

March, 2020 by pollard3

I looked forward to taking a spin up this trail on my new Roscoe Trek. The first two miles (starting in town) were snow packed and groomed for Nordic skiing. Even so, the trail was a lot of fun. Being a sunny day, a lot of folks were out biking, cross country skiing and walking - but not so many to slow you down.

Ammonoosuc Rail Trail

No longer suitable for biking

November, 2019 by vtstream

My wife and I rode this trail a few years ago on touring bicycles and really enjoyed it. We returned recently and were unable to use the trail due to atv’s and four wheelers chewing up the surface to the point that it was impossible to ride. Let’s hope NH doesn’t decide to ruin the other rail trails in the state. Really a shame

Stowe Recreation Path

Stowe Rec Path

September, 2019 by paulbroderick41

My wife and I drove up from NYC On Fri morning to ride this trail. Parking was easy in a public lot on Weeks Hill Rd off Mountain Rd. The Path crosses Weeks Hill Rd and we road from there towards the mountain. You cross the road once and several bridges over a river. We were lucky it was a Friday and the trail was empty. There are a few spots where the path is narrow so if it were crowded it could be an issue. Heading towards the mountain it is a slight uphill so when you come back there are places were you Chan coast for a while if you wish.

Accordion

Island Line Rail Trail

Great trail - cause way section closure

September, 2019 by tn1637

We had a great ride on most of the trail today. A heads up to all that the causeway section is closed for repairs until May of 2020. Work is currently being performed around Las Island at mile 10 on the trail. We look forward to riding the entire trail when we pass through Vermont again in 2020.

Lamoille Valley Rail Trail

Great trail, very scenic

August, 2019 by Ratbas

Probably my favorite non-paved trail. The eastern section has a steady climb going all the way through, nothing hideous but you definitely maintain awareness of it. Also even by rail trail standards it does to feel a bit too straight and green-tunnelish.

The western section is far more scenic with a better variety of climbs and drops. Looking forward to watching the development of this trail. Don't pay too much attention to Google Maps as I think it's a bit behind on what's currently complete.

I'll agree with other reviewers who feel that there are minimal amenities on the trail itself, but there are a few options for places to eat and other points of interest not too far off of it. One of my favorites are the painted silos in Jeffersonville (you can also find a convenience store nearby if you need one).

Northern Rail Trail

Narrow trail

August, 2019 by vikkb34

We rode about 26 miles total. 13 miles there & back. Crushed stone most of the way..We parked in Lebanon parking lot,where it begins. Little grassy in sections.Gets wider in some spots & pretty narrow in some areas. We thought the first 10 miles were nice ,then it was a very narrow trail & buggy.lot of small bridges,some were in need of repair,need to pay attention.There was an area were the rail road ties were exposed about 10 miles from beginning.Just have to watch out..Rode past some lakes& huge rocks that were blasted out for trains..Was a pretty trail .. Could get muddy if rain ..

Stowe Recreation Path

Stowe Rec trail

August, 2019 by heykimbers

This is a beautiful trail but it is very narrow unlike Rail to Trails. On a busy weekend day it was a bit frustrating to ride this trail. There are many bridges but they aren't wide enough for bikes going both ways, never mind the walkers. It was also difficult on the bridges to see who was coming the other way so I ended up walking across the 10 bridges after a close collision.

Recommend going during the week when the trail may be quieter. It is a beautiful trail - but there are others in the area that can offer a better riding experience.

Lamoille Valley Rail Trail

Trail is growing a little bit more, and another big trestle has been added

July, 2019 by bobwhite

The Lamoille Valley Railtrail is a wonderful trail. I ride this trail a lot, usually once a week in the summer. I ride the two main sections ST J to West Danville and Morrisville to Cambridge Junction, both about 17 miles long.

There's some good news, this new section is just 1.5 miles long, stretching from the Mississiquoi Rail Trail intersection to Bridge Street in Sheldon, but this short section contains the longest original railroad bridge with great new decking on it. Best for now to ride this section in conjunction with a Mississiquoi trail ride for now.
Hopefully the complete 93 mile Lamoille Valley Railtrail will be totally completed in a few years, along with the existing 26 mile Mississiquoi RT, northern Vermont will offer some great rail-trails!

Presidential Rail Trail

Well maintained and so pretty

July, 2019 by kate2030

Last July, I reported that the bridges were a pretty sketchy to go over with horses. I am so happy to report that the bridge's planks have been replaced. I've ridden several days lately and each time the gentlemen brush-hogging were so polite turning off their motors so they wouldn't spook the horses. All the bikes and hikers I have met are so sweet and friendly. I just love to ride my horses on this trail. Thank you to whomever is responsible for maintaining the P R/T!

Millstone Hill West Bike Path

Nice Run

July, 2019 by cbroman

It is a little short at 1.4 miles but a nice trail. If you are a flat lander like me, the hills can be a little bit of a challenge but not bad.

Island Line Rail Trail

Amazing views of Lake Champlain

July, 2019 by godsmelissa

This trail was amazingly beautiful. My family and I kept stopping to take in the scenery. The nice volunteer at the ferry on the end stated it was 4miles from Airport Park- where we started to the end where you catch the bike ferry- for a nominal cost, which we chose not to as it was only 1 more paved mile on south hero island then all road- we had children in a trailer and it wasn’t for us to continue. Some spots on the trail had good washout and was marked w/ caution cones and even some areas were one way accessible at a time to opposing traffic. Everyone we encountered were all courteous to this and we had no issues in waiting or riding on. There was some hills leaving Airport Park and a marked rd crossing but again no issues. As well it was packed dirt and some grass areas. This trail is heavily traveled with foot traffic as well and many ppl walking dogs too. Well worth a visit. The playground at airport park was fun and the bathrooms were open too so that was good. Our trip was the second weekend in June. The weather had a nice breeze and sun all day but in that area it is still considered out of season till end of June

Niquette Bay State Park - Allen Trail

Accessibility of Allen Trail

June, 2019 by cari4

My daughter, who uses a power scooter, and I decided to check out how accessible Niquette Bay State Park is yesterday. First, we were greeted warmly and mentioned that we were looking to use their accessible trails. We were told that there was really only one trail that we could access, which was the Allen Trail. It is about a half-mile long and is a beautiful setting. It doesn't take long and little effort to be one with nature for a while. I recommend this trail if you are looking for a nice stroll in the woods. You cannot get to the water from any trail in this park if you are looking to do so from the accessible trail. It is a beautiful park and you could bring a picnic lunch and eat at their picnic tables. Enjoy!!

Find Nearby City trails

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

OR