Hartford, WI Mountain Biking Trails and Maps

657 Reviews

Looking for the best Mountain Biking trails around Hartford?

Find the top rated mountain biking trails in Hartford, whether you're looking for an easy short mountain biking trail or a long mountain biking trail, you'll find what you're looking for. Click on a mountain biking trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
6 Results
Activities
Length
Surfaces
Type

Eisenbahn State Trail

24.3 mi
State: WI
Asphalt, Crushed Stone

Mascoutin Valley State Trail

21 mi
State: WI
Crushed Stone, Grass, Gravel

White River State Trail

19.7 mi
State: WI
Concrete, Crushed Stone, Gravel

Lake Michigan Pathway

14 mi
State: WI
Asphalt, Concrete, Crushed Stone

Seven Waters Bike Trail

18.6 mi
State: WI
Asphalt, Crushed Stone, Gravel

Wild Goose State Trail

34.5 mi
State: WI
Asphalt, Crushed Stone, Dirt, Grass
Trail Image Trail Name States Length Surface Rating
The Eisenbahn State Trail gives a nod to Wisconsin’s German heritage in its name—Eisenbahn is German for “railway.” The strict translation, “iron road,” refers to the iron rails originally used as...
WI 24.3 mi Asphalt, Crushed Stone
The Mascoutin Valley State Trail is divided into two segments along a former corridor of the Chicago and North Western Railway. The eastern section runs 10 miles between Fond du Lac and Rosendale. The...
WI 21 mi Crushed Stone, Grass, Gravel
The White River State Trail is a 19.7-mile trail composed of two separate segments: a 12-mile stretch that runs between Elkhorn and just west of Burlington in Walworth County, and a 7-mile section...
WI 19.7 mi Concrete, Crushed Stone, Gravel
The 13.5-mile Lake Michigan Pathway keeps you in close touch with the sixth-largest freshwater lake in the world as it links rail-trails north and south of the port city of Racine. Along the way, the...
WI 14 mi Asphalt, Concrete, Crushed Stone
The Seven Waters Bike Trail is a scenic corridor stretching more than 18 miles north–south between Burlington and Muskego Lake into Waukesha County. The trail was originally three trails, locally...
WI 18.6 mi Asphalt, Crushed Stone, Gravel
Notice: Utility work is progressing north along the trail from Hwy 60 to Fond du Lac. The trail should remain passable but use caution as the trail may be rough in those areas. Please see the Dodge...
WI 34.5 mi Asphalt, Crushed Stone, Dirt, Grass

Recent Trail Reviews

Starkweather Creek Path

Spiral Pedestrian Bridge Ramps

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt surface was in good condition. Most of the route meandered through a shaded canopy of trees. Half of the trail had a nice broken yellow center line. The northeast section was tucked away between a golf course and city neighborhood. The western branch ran along the side of a busy and noisy highway. The highlight of the trail were the spiral ramps entering and exiting the two pedestrian bridges. This trail connected directly to the Capital City State Trail.

CamRock Trail

Just what the doctor ordered

October, 2026 by kriekkoff_tl

The 9-foot-wide crushed stone surface was well maintained. The trail was a mix of mostly shaded canopy of trees through the woods with a small section of prairie. The route was relatively flat and easy to ride with four slight grade changes. The trail ends in the cute village of Rockdale to the south. The ride was very peaceful - just what the doctor ordered. There was also a separate mountain bike trail in the area.

Capital City State Trail

Great extended ride off the Lower Yahara Trail

October, 2026 by rturowski

Beautiful October Day with friends from Fond Du Lac whom we invited to experience the Lower Yahara. Since it was sunny, fall colors in all we simply could not stop, so the inevitable was to continue west on the Capital Trail. We've not ridden this trail in the fall, however have previously enjoyed it during the summer months with all the wildflowers in bloom. Today's experience was just as enjoyable. Would definitely recommend it. Our friends certainly enjoyed their time in the area.

Accordion

Fox River Trail (WI)

Tale of Two Trails

October, 2026 by kriekkoff_tl

The trail system provides a delightful mix of downtown attractions, suburban neighborhoods and wooded wonderland. The northeastern section features downtown murals, sculptures, bridges, bars and restaurants. There is a designated bike trail (asphalt) and walking trail (decorative brick) that circles the Fox River around Frame Park. The surface of the bike trail, however, is bumpy due to periodic flooding. The southwestern section weaves the cyclist through suburban neighborhoods and wooded areas. Beware the stench as you pass the wastewater treatment plant along Sentry Drive!

New Berlin Recreation Trail

Perilous Road Crossings

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt surface is in need of a some serious TLC. Although the trail follows the powerlines down a wide corridor with nicely mowed sides, there are several wrist-jarring cracks running perpendicular to travel. The grade increases slightly from east to west. The trail is straight as an arrow with a 3-mile section between Calhoun and Springdale Roads with no road crossings that attract speed-training cyclists. A major concern are the street crossings at 4 busy roads. These are not controlled and must be crossed at one's own peril.

Barstow to Frederick Street Connector

Backyard Suburban Neighborhood

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt surface is in excellent condition. Beautiful backyard city neighborhoods. Although road traffic is not heavy, caution must be taken at each road crossing. Hopefully the trail will be extended west to connect with the Fox River Trail.

Racine County Bike Trail

Out there on it's own like an island

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt surface is in great condition. The trail hugs the road past two SC Johnson campuses as well as some government buildings. No shade and not a connector trail. Kind of out there on its own - like an island.

Racine-Sturtevant Trail

Cross at your own peril

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt trail was smooth overall with nicely mowed sides. There is a nice wooded section to the west, a road section in the middle and a hilly section on the eastern half of the trail that shares the same corridor as the powerline. There are no mile markers and no shade for most of the trail. This trail conveniently connects the Pike River Pathway to the North Shore Trail. There is one controlled intersection, but you will need to take caution when crossing the other roads along the trail.

Pike River Pathway

Pleasantly Quiet

October, 2026 by kriekkoff_tl

The 12-foot-wide asphalt surface had some cracks, but was good overall. The trail was relatively flat with good signage. There were some busy roads to cross, but all did so at controlled intersections. I was pleasantly surprised how quiet the ride was as I biked through both prairie and industrial sections. There were no mile markers. The south end of the trail connects conveniently with the KR Trail. There is a parking lot located at the south end of the trail at Highway 195 that is not listed on the Trail Link map.

Glacial Drumlin State Trail

Beautiful sunny October ride

October, 2026 by redpine2001

Completed my final leg of this trail by riding from London to Cottage Grove today. Trail conditions were very good, however the bridges can use some maintenance. All have matting across them to assist in preventing flats, however watch your approach, there can be some serious bumps getting onto & off the bridges. Having ridden the entire trail now, eastern portion several times; it’s just my opinion that the western portion would be my recommendation. East of Douseman the trail is paved, however much of it is in need of maintenance to remedy cracks.

CamRock Trail

A bit short, however very nice

October, 2026 by redpine2001

First time on this trail on a beautiful October day. I was impressed with the scenery and variety of alternate trails along the way that included hiking and mountain bike trails. While I accessed the trail from the southern trailhead, there are two alternate access points between Cambridge and Rockdale along highway B, containing picnic tables and facilities. Well done Dodge Co. park system.

Sheboygan Interurban Trail

finally found the trailhead!

October, 2026 by beachbadger

It took some doing to find the trailhead of the actual “trail” part of the ride. Dewitt Road in Oostburg was the start of the paved trail. Parking was available along a nearby neighborhood road. No parking lot. From there you can ride south with only one little part on the road around a factory just past Cedar Grove. There is a nice shelter with a porta potty at the Cedar Grove depot. Unfortunately we had to turn around short of Belgium so have to leave the rest for another day.

Find Nearby City trails

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.