|
|
The Ahnapee State Trail in northeast Wisconsin provides a scenic nearly 52-mile journey between Sturgeon Bay and Kewaunee, featuring a tour of water bodies along the Door Peninsula.
The trail also...
|
WI |
51.8 mi |
Asphalt, Crushed Stone
|
|
|
|
Closure Notice: The Newton Blackmour State Trail is closed for 2.5 miles from Highway 76 to Puls Rd. due to recent washouts. Please consult Wisconsin DNR for more current information.
The Newton...
|
WI |
21 mi |
Crushed Stone
|
|
|
|
Wisconsin’s Wiouwash State Trail is named for the four counties it passes through: Winnebago, Outagamie, Waupaca, and Shawano. Currently, 47 miles of the rail trail are open in two disconnected...
|
WI |
47.5 mi |
Crushed Stone, Grass
|
|
|
|
The 85.2-mile Mountain-Bay State Trail, one of the longest trails in the state, travels a mostly scenic, wooded route through three counties—Marathon, Shawano, and Brown—as it makes its way from...
|
WI |
85.2 mi |
Asphalt, Crushed Stone, Dirt, Grass, Gravel
|
|
|
|
The Old Plank Road Trail parallels State Route 23—a road originally built out of wooden planks in the 1800s—from the western edge of Sheboygan to the Village of Greenbush. The trail was one of the...
|
WI |
37.6 mi |
Asphalt
|
|
|
|
On the western end, the Duck Creek Trail picks up where the Newton Blackmour State Trail leaves off, that is just east of the town of Seymour at Vanderheuvel Road. Traveling along an old railroad...
|
WI |
6 mi |
Crushed Stone
|
|
|
|
The Friendship State Trail runs between Stevens Point and Manitowoc in eastern Wisconsin in two disconnected segments of the trail for 18.3 miles.
Note: Rural sections of the trail are gravel and...
|
WI |
18.3 mi |
Asphalt, Boardwalk, Crushed Stone
|
|