Find the top rated hike trails in Howard, whether you're looking for an easy short hike trail or a long hike trail, you'll find what you're looking for. Click on a hike trail below to find trail descriptions, trail maps, photos, and reviews.
This was a fun trail, safe and chill, but the steady hills are still challenging. I ended up taking the trail all the way to the north end of the lake, pretty area.
I rode the trail starting in Andover, heading southeast, then backtracked to go west toward Wichita and again back to where I started at N Andover Road (where my sister lives). Going east of Andover was about 4 miles of packed, manageable gravel and great Heartland rural scenery- complete with cows and wildflowers. Going toward west toward Wichita, the path was very well maintained concrete.
I am not sure where this path starts to the west. I took an unmarked bike path from 135 to the RedBud trail a few miles away. It is paved and out of the way - which makes it nice for riding. But at one point the paved trail stops and a gravel portion starts. The gravel portion is blocked off making it look like it is closed. The gravel portion was ok. The gravel can be a bit loose and thick. I was riding 700x41 Knards and would not like to be on smaller tires. I wanted to really love this path BUT the constant road crossings was horrible. One intersection took me probably close to 5 minutes to cross - HORRIBLE. The street crossing are abundant and really made me dislike this trail (out east). The trails were also roped off so you had to stop and lift your bike over them - at least I had to. Parts of the trail were very nice but I gave up due to the street crossings. It was nice that this path crossed the K96 path which allowed me to connect trails and get in a 30 mile ride. Like the previous review, I hope they leave it gravel instead of concrete. Crushed limestone would be best and cheaper... Wichita is trying to provide a better bikeway (Bike, Hike, Walk) and this is a good start on the west end.
Great trail, it is now paved all the way to Woodlawn. East of Woodlawn it is gravel all the way to Andover. Its a great gravel-bike ride, I hope they keep it gravel and do not pave it all.
I walked the first .75 mile starting near the I-135 bridge. Not much shade on this part of the trail. I got out there later than planned so I didn't walk as far as I wanted due to the heat.
The road crossings mentioned in the other review have been completed, at least on the section I walked.
I'm looking forward to walking the rest at some point.
Path is not yet finished. It is mostly paved with the exception of the road crossings where it is still gravel/ballast.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!