Explore the best rated trails in Lexington, VA, whether you're looking for an easy walking trail or a bike trail like the Greenbrier River Trail and Craig County Greenway Trail . With more than 20 trails covering 157 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.
We started at the south end on 10/13 and ride to the Anthony Rd. Boat launch and returned to the south end. Great trail conditions, not too busy traffic-wise. Looking forward to our next trip to the region to pick up where we left off.
As nice as the Greenbrier over in nearby WV. Great surface the whole way from Intervale to the northern end.
The trail is in great condition. The combination of shade and open sky made it a pleasant ride in low 80s temps.
Only a few minor repairs need to be made- steps for riders on both sides of the bridges are needed to dismount their horses- a few bridges were missing them. Also, there is a board sticking out into the path on the long bridge at mile marker 4.5. It looks like they tried to repair it, the board needs to be replaced.
Beautiful trail that follows an amazing, clear stream that begs to be fished. It is the water supply for Lewisburg.
Did the ride on 23 Jul. As part of trip planning I called Allegheny Outdoors to determine trail status. They are located at the eastern end parking lot. Being told the trail was open all the way I loaded up and left for the trail head. Rode the trail east to west and back. Beautiful views of the river with tree covered mountains on the other side no real vistas this is close up nature at it’s best. Great facilities on each end with additional parking along the way. Surface was ok. I thought the ground stone was a little deep in places. Probably because it’s a newer trail and recent rains required patching in places. I think I’ll return in late fall/early winter when view of the river will be better and temps more palatable for this ole man. Highly recommended ride.
I love that you are along a river a lot of the time and cross a river multiple times. The trail is mostly shaded. Tons of interesting birds sing in the spring. The bathroom at Rose’s Mill is a plus. They tell you not to drink the water but after I did by mistake I suffered no ill effects. I encounter people on any day of the week, but definitely on the weekends. I highly recommend this trail.
It's quiet, has plenty of shade, peppered with picnic tables, and markings for 5K, 10K, half and full Marathon runs starting from the Intervale trailhead (bathrooms). Trail was closed due to recent washout about 8 or 9 mi up from Intervale.
10 mile asphalt trail with few root-cracks and little shade (I'm beginning to suspect the two are related). No road crossings except for the well-marked, half-mile detour through a quit neighborhood for major bridge construction. There is no longer a gap between Bridge St. and Salem (despite the Traillink narrative and map), asphalt extending to Cook Dr. That access has a porta-potty.
Quiet, flat, maintained, mostly shaded, along the Piney river with benches and the occasional picnic table. Port-a-potty at the Piney River trailhead, running water bathroom at the Roses Mill trailhead .
We spent three days riding this trail. It was an absolutely beautiful ride with lots of bridges and two tunnels. It's mostly flat with plenty of shade on a hot summer day. Lots of photo opportunities.
My friend and fellow bike adventurer David and I spent three days riding the entire trail twice. West Virginia is truly scenic and this trail also doesn't disappoint. Many trails claim they are adjacent to water but often meander far away. This trail is next to the scenic Greenbrier River almost the entire 77 miles and the tree canopy was protective on our hot, sunny days. We lodged in Marlinton (TwoTire AirB&B) a town with all necessary services. Day one we rode north to Cass, an historic town with a nice cafe, museum, gift shop and an excursion steam locomotive. The up and back ride was 51 miles. Day two we rode south to Rorer (26 miles) and back for our 52 mile day. We stopped at the really nice general store on the trail in Seebert (10 miles south of Marlinton) and bought sandwiches to take to our lunch stop...this is the only food service on this stretch of the trail. On day three we drove to Spring Creek so we could ride south to the trails end near Caldwell. Spring Creek has very limited and remotely located parking so I'd recommend other parking areas if you follow a similar itinerary. There is no food service on this stretch. we planned to ride into Caldwell and over to Lewisburg but this turned out to be a bad idea. The trail ends at mile marker 3.1. The narrow and hilly country road into Caldwell has no shoulder and had traffic on our Sunday stop. We determined it was too dangerous to cycle but we needed lunch...solution...call Dominoes and have a pizza delivered to the trailhead.
Phone service is limited but we found that stops like Cass, Seebert and Caldwell had service.
The trail is mostly a two track path and is fairly well maintained. The best bike for this trail would be a gravel or touring style bike with 36c or larger tires. I wouldn't recommend a road bike and while we saw one hand cycle and one recumbent, they were struggling a bit.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!