Find the top rated atv trails in Hudson, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.
We started in Manchester and rode east. The first 3 miles the surface was packed gravel with fall leaves but no rocks. We rode another 2 miles and found the path very bumpy with thicker gravel and rocks protruding. We have 2 inch tires but it wasn’t fun for us. We wanted to bike to Raymond but turned around. We have biked on other packed trails in NH without any issues but this path was worse after 3 miles.
I use this trail as a connection after I get off Bradford rail trail take Salem st to this trail. Ride it until the end. Then your on the Border to Boston trail.
Rode the entire trail from Ayer, MA to Nashua, NH then back to Ayer on 10/09/24. Paved the entire length and extremely well maintained with frost heaves painted white, although, one should be careful when sections of the trail are leaf strewn, as it was yesterday. Suitable for walkers, joggers, rollerblading and cycling. This is the nicest trail I’ve ridden since moving to Massachusetts 2 years ago
We did this trail with e-bikes with 2.1" tires. This all-dirt trail is very rustic and narrow in parts. From the north, after .5 miles you will start to feel the presence of tree roots which at times are very dense - so dense that they are difficult to ride over at any speed. From about .8 to 1.2 miles the trail goes up and down a hill which is all rocks and anything other than a mountain bike will need to be walked.
My wife and I are both injured(fortunately not serious) after both of us thrown off our bikes simultaneously on a small poorly surfaced wooden bridge just north of Keene NH. The wooden boards were uneven and some rotted causing our bikes to wedge in a step-off causing us both to fall off our bikes. The trail had several road crossings just outside of the town of Keene which are very dangerous. There are tiny stop sign markings on the trail and no large or blinking light warnings on the crossing roads which have poor visibility in both directions due to curving of the road. I would not recommend this trail for transient travelers trying a new RT on vacation. This is for locals only who know the trail well in my opinion.
Nice easy trail until it crosses the stream then turns into more challenging path. Small elevation changes. Lots of mosquitoes since it goes next to a stream/bog/swamp
I'm in love with this trail. Much of the trail path is dirt, but there is a new area with fine gravel. I find this such a peaceful trail and consider it to be in good maintenance. Thanks to everyone that maintains the trails.
This is a decent trail but there are a few things to note: No parking lot on Marlboro end but I did find parking on a side street. The trail has many street crossings, especially when you are in Hudson. Some of the crossings are busy intersections. The trail ends in Hudson but you can bike along rte 62 for a few miles, then down a side street to pick it up again in stow. That portion of the trail will take you to action. The guide says this is 10 miles but I’m not sure if the Marlboro to Hudson section is 10 miles or if it is 10 miles with the stow to acton portion. Marlboro to Hudson didn’t seem like 10 miles. I wouldn’t go out of my way to do this tri
Wellington Greenway Trail is good place to ride my bike underpass the MBTA purple and orange line trains. Ducks walk by the river pond. I have seen yacht boats there.
This section (8/2024) is about 5 miles long. It goes through woodland and past leafy backyards, but it runs alongside the towers for a high-tension power line. Trees have been clear-cut about 25 feet on both sides of the trail, so there's no shade along this section. But the trail is wide, very straight, and smoothly paved. It has a few small ups and downs and crosses four or five quiet roads before it comes to a traffic signal at the intersection of Routes 126 and 27. Just beyond, the trail turns to crushed stone with a few sandy patches. There's a large supermarket and shopping center adjacent to the trail at that point.
We parked in West Concord and decided to ride south to Sudbury. Beautiful trail — ends 2 miles from where we parked with a locked gate. BUT… there is more trail on the other side. There is a nice, paved switchback up to a crossing at Powdermill Road. All marked with great signage. The way down on the other side is very steep and not paved—but manageable after dismounting. Trail is just as beautiful on the other side. We didn’t make it quite to the end because I got a construction-based flat at North Road (the Davis Field parking lot). I didn’t notice that they hadn’t paved the transitions at the road crossing and pinched a tire. Oh well. Hopefully, by the time you ride the construction will be complete and you can just enjoy the scenery!
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!