Malden, MA Atv Trails and Maps

1363 Reviews

Looking for the best Atv trails around Malden?

Find the top rated atv trails in Malden, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
1 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating
Crossing through wooded areas and featuring magnificent wetland vistas, the Rockingham Recreational Rail Trail (Fremont Branch) offers an 18.3-mile trail adventure from Epping to Windham. The northern...
NH 18.3 mi Dirt, Sand

Now, More Than Ever, Trails Matter!

During COVID-19, trails are being counted on as places where people can find solace and respite and we need your support to keep trails open and provide these critical FREE resources! Please continue to practice physical distancing and check the status of your trail before heading out!

Trails by activity

Recent Trail Reviews

Nashua River Rail Trail

Trail needs resurfacing for biking

July, 2021 by sunrayeng

Not sure why this particular trail gets top reviews. Maybe for walking and scenery. I'll give it that but for biking it sucks. The entire paved trail is nothing but divots and tree roots trying to break through the surface. I found it impossible to bike any short distance without hitting a marked or unmarked divot and when not hitting one of those a tree root. I hit numerous imperfections at 20+mph (no one around at the time) and almost got knocked off the bike. Thumbs UP for walking, dumbs DOWN for biking.

East Bay Bike Path

Providence end parking

July, 2021 by andee

We parked at India Point. Don't do that! It requires going up a ramp to cross the bridge (which fortunately has a bike and pedestrian corridor), and then downhill to an uninspiring part of town, then a lot of downhill until you get to the beautiful part of the path. Of course, when you finish, on a hot summer day, you have all that uphill to do in the open sunshine on the way back. We saw many opportunities to park along the path.

Other than that, the path is easy and beautiful and fairly shady, at least to Barrington, which is where we turned back (reluctantly).

Rockingham Recreational Rail Trail (Portsmouth Branch)

great trail

July, 2021 by vw7cghqxcg

Ran the length of the trail to set up a Fastest Known Time segment. Was surprised by how beautiful the whole trail was, and how much the flora changed throughout. Id like to go back at a slower pace and stop at some of the towns it crosses (like Raymond and Epping)

Accordion

Londonderry Rail Trail

great trail… can connect for longer rides!!

July, 2021 by geegee6519

Start at Londonderry (by airport) trail is 4.5 miles ends at A neighborhood… google the mile trek to Derry Trail Head - the Derry trail is 3.9 miles (make sure you stop at the Grind on the Rail Trail for lunch! In Derry!) then connects to the Windham Rail Trail which is 4.3 miles and will continue another 5 miles in Salem NH.

Southern New England Trunkline Trail

The highs are high, but the lows are really low. Virtually impassable in places.

July, 2021 by yw8km5gp4n

My actual rating on this one is 2.5 stars. One glorious day, probably in a couple of decades, this will be an amazing trail. Right now, it is an extremely mixed bag, and very challenging to do all the way. Me and the friends I rode with didn't make it to the end.

We started on this one as a continuation of the Air Line State Park Trail in Connecticut, heading from west to east, with the Forge Park/495 train station as our destination. The Douglas portion of this one was fine; none of it is paved, but it's maintained, free of ballast and standing water, and our bikes (one loaded tourer and two old-fashioned/90s mountain bikes) were fine on it, if not quite as fast as they would be on asphalt. There was very little traffic; most of the way was reasonably shaded, and the grades are gentle. At some point in Douglas State Forest, it starts skewing downhill, but not really enough to be noticeable. I probably wouldn't take a road bike on it, but a decent all-purpose bike should do fine.

Things became a little harder in Uxbridge. The trail got narrower, rockier, with some overgrowth. There were some pools of standing water, felled trees, the occasional stretch of ballast, and a few above-grade road crossings (i.e., steep hill to the road, then steep hill to get back on the trail), and heavy damage from ATVs. I, on a touring bike, was able to negotiate it, but I had to *negotiate*. And, more than once, walk my bike.

Things continued to be mediocre-to-challenging as we we approached Route 146. At the highway -- which is an uncrossable, shadless, multi-lane freeway -- the trail became complete garbage. We waded through deep pools of standing water and fought our way through fetid, swampy overgrowth before the way basically just disappeared. We had to ride *right* next to the highway itself for a short distance to find a steep, rocky little side path that drops you onto a surface road.

According to the information we had, the trail could be reacquired by riding through some nearby industrial parking lots, but this turned out not to be the case. Thank Cthulhu for Google Maps, because it seems you actually have to detour about a mile on the local roads, which are wide, fast, and without shade, in order to find the entrance to the Blackstone River Greenway, which is the next stretch of the trail. There is next to no signage for any of this.

After the mess that was Uxbridge, the BRG was *exceptional*. Smooth, shady, not heavily trafficked, and some beautiful views from river bridges. I enjoyed every single foot of it. Unfortunately, it dead-ends at a bridge that's still under construction. We needed to leave the BRG anyway, since it will ultimately connect to an existing trail in Rhode Island.

Returning to surface streets, there was no sign of the trail at this point, so we consulted Google Maps again and went up Castle Hill Way, which is a subdivision of condos, devoid of any indication that the trail's right-of-way is there. You have to ride up the road and then go through a little grassy area to get to the gate where the trail picks up. It was doable, but rocky and overgrown, with pockets of ballast and standing water, and stretches damaged by ATVs. Fun for mountain and gravel bikers, maybe, but not so much for us. There was a fenced-off road crossing, but we could maneuver our bikes around it.

The trail continued to be in poor condition, and eventually, somewhere in Bellingham, we ran into a long section of standing water and ballast. Amid the bugs, the heat, and the horrible, nearly impassable terrain, we decided we'd had enough and exited onto Old Elm St., taking the road the rest of the way. Had we gone another mile or so, we would have reached Center St., which we'd heard is where the trail becomes a smoothly paved path all the way to Grove St. in Franklin. We did pass an intersection with the trail on our way to the train station, so that seems to be correct.

So, as I said, this will be an incredible bike path one day. For now, except for the Douglas section, the Blackstone River Greenway ,and the paved section in Franklin and Bellingham, it is best used by people with strong mountain/gravel biking skills, and equipment to match. The painful parts are just not worth it.

Washington Secondary Bike Path

That's what I'm talking about

July, 2021 by yw8km5gp4n

Rode this with some friend, starting in Cranston, all the way to the end. I thought it was great! Good pavement and well-shaded in Cranston and Coventry, although things got a touch bumpy in West Warwick due to tree roots, and there was less shade there as well. Oh, and there wasn't much traffic either, which is a nice change from what I'm used to. Overall, it was everything I want in a rail trail, except for one thing: going from east to west, the last few miles are a steady climb. Since this is a rail trail, it's a relatively gentle climb, but it's constant and your legs will feel it. My advice is to shift to a slightly easier gear, get a good cadence going, and just take your time!

North Central Pathway

Ride it often

July, 2021 by facebook152

This is a nice (mostly flat) trail that is paved from the road behind the Clark YMCA all the way to 140. There is a short on-road section with a decent uphill to pick up the trail over by Rt 140. Past 140, the trail alternates between sand, gravel, and loose rock on one uphill. Trail suddenly ends at a barrier that’s the edge of a cemetary.

Salem Bike-Ped Corridor

Please update details

July, 2021 by dstopham

The paved and complete section is 2.0 miles long from the Windham Rail Trail to the Salem Main Street Depot. The next 1.3 miles are under development with CMAQ grants helping. The remaining distance to Methuen is not complete or funded but passable on a regrind surface. This 5.2 mile Salem corridor is the south link of the Granite State Rail Trail. (Submitted by Dave Topham, FSBPC Co-Chair & Treasurer)

East Bay Bike Path

Ride to Eat! Bike mirror ESSENTIAL

July, 2021 by smpfoley

This bike path is delightful - for all ages and abilities. Two negatives: lack of restrooms if you start from India Point/Veteran's Parkway. From the first lot at Veteran's Parkway, it is 3 miles to the coffee shop on the path which understandably their restroom is for paying customers only. The coffee shop is locally-owned and has outdoor seating right on the path! The next restroom I believe is in a state park (not Colt) but they are often locked. After that there is a port-a-potty after Police Cove Park, after you cross the bridge tucked next to a gas station.

Cyclists rarely announce they are passing you, a bike mirror is a must for your own safety since inconsiderate cyclists are a threat to you.

There is a bike shop on the route as well, which we had to use for minor repair, shoutout for great service. A smoothie/juice place, a taco truck, ice cream stand, you will encounter all on this trail. A national chain coffee shop is tucked in the Shaw's plaza at the major road crossing. You will not go hungry or thirsty!

In Bristol there is a plethora of delicious eateries and a waterfront park, plenty of grass and benches to relax.

Enjoy, ride safely, and thank you to the pioneers who made this path possible.

Fred Lippitt Woonasquatucket River Greenway

lovely quick ride

July, 2021 by lindarkv

Lovely little trail with appealing detours into small parks. Great for kids as well as adults. I recommend parking in Riverside Park. Check out Red Shed biking programs for kids which uses this greenway.

Southern New England Trunkline Trail

West St Uxbridge to Connecticut border

June, 2021 by rickhavu

I went from West St., Uxbridge, MA to the Connecticut boarder, it was around 8 1/2 miles on the way and over 16 miles round trip. Nice ride, saw 1 horse along the ride along with a few walkers and bikers.

Bruce Freeman Rail Trail

Fantastic trail!

June, 2021 by annetraf

I ran 8 miles of the trail and it was perfect! Lots of shade, mostly flat and all paved. Around mile 1 you have to pay attention to where the trail goes since you cross a street but other than that everything is clearly marked. I felt safe and there were even porta potties along the run at certain mile markers. Didn’t use them, but it could come in handy one day! Lovely trail for runners, bikers and walkers of all ages. Definitely coming back again!

Find Nearby City trails

Accordion

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

Register with Apple

OR