Nashua, NH Atv Trails and Maps

1644 Reviews

Looking for the best Atv trails around Nashua?

Find the top rated atv trails in Nashua, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
2 Results
Activities
Length
Surfaces
Type

Hillsborough Recreational Rail Trail

7.8 mi
State: NH
Crushed Stone, Dirt
Trail Image Trail Name States Length Surface Rating
Crossing through wooded areas and featuring magnificent wetland vistas, the Rockingham Recreational Rail Trail (Fremont Branch) offers an 18.3-mile trail adventure from Epping to Windham. The northern...
NH 18.3 mi Dirt, Sand
Hillsborough Recreational Rail Trail connects three communities in south-central New Hampshire: Hillsborough, Deering, and Bennington. The unpaved trail winds along the Contoocook River through rural...
NH 7.8 mi Crushed Stone, Dirt

Recent Trail Reviews

Nashua River Rail Trail

Nice but bumpy

July, 2026 by ellenkillam

I haven't been on this trail for a few years so was disappointed to find there is still an issue with bumps from tree roots and small sink holes. I did not do the entire trail because of this. It is too bad because it is a nice trail.

Old Eastern Marsh Trail

Beautiful experience

July, 2026 by 62lark

Rode this trail today (7/17/26) in combination with several other adjacent trails. Smooth, well-paved, lots of rest stops, beautiful marsh lands, continued onto the Clipper City trail at the southern end in Newburyport. One of the nicest trails I've ridden.

Clipper City Rail Trail

Loop completed

July, 2026 by 62lark

Outstanding trail wandering through Newburyport, great mix of quiet woods and urban setting. The Trail has been completed to include the piece from the cemetery to the train station, making the entire route complete. Wonderful experience today!

Accordion

Assabet River Rail Trail

Very nice Marlborough to Hudson ride

July, 2026 by andrix

Assabet is a 5 mile or so paved trail in good shape. We started at 72 Jefferson St. in Marlborough, MA where there was plenty of parking spaces and a path to the trail. The Assabet is pretty much a city/suburb experience with a few road crossings that need to be executed with care. Just recently it has been joined in Hudson by the 7 mile spanking brand new Hudson to Sudbury Trail (part of the Mass Central Rail Trail system). Then, in Sudbury the Bruce Freeman trail joins making for all sorts of possibilities for some great rides. My wife and I plan next time to park in Sudbury at the spot where the Bruce Freeman and Hudson to Sudbury connect (there's parking near) and make our riding choices from there.

Needham Rail Trail

Quiet and well maintained

July, 2026 by jobu1138

It was a warm summer day. We were one of two cars in the almost empty trailhead parking lot. The trail was cool and mostly in the late afternoon shade. There was enough space to ride bikes next to each other or walk 3 across. The gravel is not so deep as to slow you down. We saw two deer meander through a field. A great time was had by all.

Harrisville and Hancock Rail Trails

Not for everyone!

July, 2026 by ktrenaud

2.5 stars. Entered the trail a the far western end on Hancock Rd. near Skatutakee Lake. Biked eastward for several miles. Mixed surface (dirt, cinder, sand & forest floor). This trail is rough and best suited for fat-tire or full-suspension mountain bikes. You could do it with a gravel bike but be ready for a very bumpy ride. Partially buried track ties and roots cover roughly over a 3rd of this segment of the trail. The swamps and brook are absolutely beautiful. There are a few benches for a peaceful stop. The trail has a gentle decline most of the way so be prepared for the uphill on the return trip. Mostly shaded so sunscreen isn't needed but bug spray might be a good idea if stopping for prolonged periods. The bridges are beautiful & well maintained. The signage is discreet & informative. This is a wonderful all season trail that I plan to return to in foliage season. It has a lot of potential but in its current condition it has a LONG way to go to become a destination that will attract tourists & generate $$$ for the local economy.

Squannacook River Rail Trail

nice shorter ride

July, 2026 by slasalle76

Pleasant ride on this crushed stone surface, using my hybrid. Very short section that still has rails and ties and requests that bikes go around on the sidewalk, but easily joins back up to the actual trail after about 100 yards. The eastern end terminates in the Squannacook wildlife management area, with walking trails to follow down toward the river. If you are looking for a nice short ride that's under 10 miles total, this is a good one to choose. Stop for a bite at the local diner in Townsend center, or an ice cream.

Ashburnham Rail Trail

Short but scenic

June, 2026 by bhaalck

0.8 miles of this trail now consists of crushed gravel

New Hampshire Seacoast Greenway

The trail in the north is 80-90% full sun exposure in the summer. Just be aware if you're going out for a long run. It did start to get shady about 2 miles after the skate park.

June, 2026 by mullins.aa2012

The trail in the north is 80-90% full sun exposure in the summer. Just be aware if you're going out for a long run. It did start to get shady about 2 miles after the skate park.

Danvers Rail Trail

I have been going to different trails around my area and this was by far the nicest even with no pavement just a nice ride

June, 2026 by tko103g

I have been going to different trails around my area and this was by far the nicest even with no pavement just a nice ride

Minuteman Commuter Bikeway

I parked at Lexington lot & took my atb after reading how rough the path is. Pleasantly surprised. I'll take my road bike next time.

June, 2026 by bradleybrenner

I parked at Lexington lot & took my atb after reading how rough the path is. Pleasantly surprised. I'll take my road bike next time.

Minuteman Commuter Bikeway

Only half the trail is open

June, 2026 by lambros705

As of June 1, 2026, the first half of this trail starting in Bedford, MA is nice, but due to construction, it stops about halfway - I believe somewhere in Lexington. You can choose to exit the trail and go onto Massachusetts Avenue to ride in the bike lane, but that involves riding right alongside traffic and can be very stressful and dangerous. My husband and I did this today and I don't think I will do this again. At any point, someone in a parked car adjacent to where you are riding can open up their door right into you. Also, the bike lane often shares a lane with cars and is pretty scary for people not used to this. I hope the rest of the Minuteman bike path opens up to bikers again soon!

Find Nearby City trails

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.