|
|
Residents of Weston don't have to travel far to access beautiful trails. The village is home to the Mountain-Bay State Trail, which offers 83 miles of walking and biking across Wisconsin. For those...
|
WI |
1.25 mi |
Gravel
|
|
|
|
The description of the Green Circle Trail on the official site makes a unique boast: “All urban residents are within 10 minutes of the trail system, and yet, more than 80% of the Green Circle travels...
|
WI |
27 mi |
Asphalt, Boardwalk, Concrete, Crushed Stone, Gravel, Sand, Woodchips
|
|
|
|
The Hoover Road Trail is a 4-mile spur connecting the Green Circle Trail in Stevens Point to the Tomorrow River State Trail in the Village of Plover. The asphalt trail parallels Hoover Road passing...
|
WI |
4.5 mi |
Asphalt
|
|
|
|
The Mascoutin Valley State Trail is divided into two segments along a former corridor of the Chicago and North Western Railway. The eastern section runs 10 miles between Fond du Lac and Rosendale. The...
|
WI |
21 mi |
Crushed Stone, Grass, Gravel
|
|
|
|
Closure Notice: The Newton Blackmour State Trail is closed for 2.5 miles from Highway 76 to Puls Rd. due to recent washouts. Please consult Wisconsin DNR for more current information.
The Newton...
|
WI |
21 mi |
Crushed Stone
|
|
|
|
On the banks of the Wisconsin River is Merrill, a city which got its start as a logging settlement called Jenny Bull Fall. The river and the railroad were the economic lifelines of the town whilst its...
|
WI |
2.3 mi |
Asphalt
|
|
|
|
Opened in 2019, the Schrader Connection transformed a 1.7-mile stretch of a former Canadian National railroad line into a crushed-stone path that provides a shorter, pleasant route between two...
|
WI |
1.7 mi |
Crushed Stone
|
|
|
|
Despite its futuristic name, the Tomorrow River State Trail takes users on a tour of a historic rail-trail through beautiful Portage and Waupaca Counties. Trail users will find a good start at the...
|
WI |
29.2 mi |
Crushed Stone
|
|
|
|
Wisconsin’s Wiouwash State Trail is named for the four counties it passes through: Winnebago, Outagamie, Waupaca, and Shawano. Currently, 47 miles of the rail trail are open in two disconnected...
|
WI |
47.5 mi |
Crushed Stone, Grass
|
|
|
|
The 85.2-mile Mountain-Bay State Trail, one of the longest trails in the state, travels a mostly scenic, wooded route through three counties—Marathon, Shawano, and Brown—as it makes its way from...
|
WI |
85.2 mi |
Asphalt, Crushed Stone, Dirt, Grass, Gravel
|
|
|
|
The Bannerman Trail is open but largely unimproved between the communities of Redgranite and Neshkoro on a former Chicago and North Western Railway corridor. The dirt, grass and sand surface might...
|
WI |
7 mi |
Dirt, Grass, Sand
|
|
|
|
The Ahdawagam Blue Trail is a 4.1 rail trail that runs between Wisconsin Rapids and Port Edwards. It is paved and follows a flat trail between the two small towns.
It is also a rail-with-trail and...
|
WI |
2.5 mi |
Asphalt
|
|
|
|
The River Edge Parkway winds its way along the Wisconsin River in the small city of Wausau. 3.92 miles of the trail follows the eastern shore of the river and along the Isle of Ferns Park and Barkers...
|
WI |
5 mi |
Asphalt, Boardwalk, Concrete
|
|