|
The half-mile 8th Street Greenway begins at North Loop Road and follows a tree-lined northwesterly route to Bakers Creek Park, where it connects to a trail of the same name which is part of a regional...
|
NC |
0.5 mi |
Asphalt
|
|
|
The Ararat River Greenway is a pleasant, hard surface trail in Mt. Airy, NC. The trail gets its name from the Ararat River, and was part of an initiative to restore the waterway with the twin goals of...
|
NC |
2.2 mi |
Asphalt, Crushed Stone
|
|
|
Stretching from north of Lake Brandt south to Greensboro Country Park and beyond, the newly named Yadkin & Atlantic Greenway is really a combination of three greenway segments, now made into one: the...
|
NC |
7.5 mi |
Asphalt, Concrete, Crushed Stone
|
|
|
The paved, scenic Bakers Creek Greenway follows its eponymous creek, connecting two parks in central North Carolina's Kannapolis. The trail is part of the Carolina Thread Trail, a network of pathways...
|
NC |
1.5 mi |
Asphalt
|
|
|
The Bethabara Greenway is a multiuse, multisurface trail that takes users through historic Bethabara in the City of Winston-Salem, NC. Bethabara was a settlement founded in the 18th Century by...
|
NC |
2.6 mi |
Asphalt, Boardwalk, Dirt, Gravel, Sand, Woodchips
|
|
|
Update: As of 2017, a segment of trail between Battleground Avenue and Wellspring Retirement Community has been closed due to the construction on I-73.
The Bicentennial Greenway is a 14.5-mile...
|
NC |
14.5 mi |
Asphalt
|
|
|
The Buffalo Creek Preserve Trail provides a 2-mile moderately challenging hike or mountain bike ride in the rural community of Mount Pleasant, about 30 miles northeast of Charlotte. The unpaved trail...
|
NC |
2.1 mi |
Crushed Stone, Dirt, Gravel
|
|
|
The Creekside Park Trails—all paved and interconnected—span about 3 miles in Archdale and lead to residential areas and important points in the community.
The mile-long Cedar Trail section of the...
|
NC |
2.8 mi |
Asphalt, Concrete
|
|
|
The Deep River Rail-Trail follows the abandoned rail bed of the Atlantic and Yadkin Railroad, which began operations in 1897 and shut down in 1980. A segment of the trail travels through...
|
NC |
3.5 mi |
Crushed Stone
|
|
|
The Downtown Greenway is a paved multiuse trails winding through Greensboro, North Carolina. The trail is close to 1.5 miles long, beginning on Spring Garden Street, with a landscaped buffer between...
|
NC |
1.5 mi |
Asphalt, Concrete
|
|
|
The Elkin & Alleghany Rail-Trail is part of an effort to connect the rural town of Elkin with the nearby Stone Mountain State Park, utilizing the long-abandoned route of the historic Elkin & Alleghany...
|
NC |
1.5 mi |
Crushed Stone
|
|
|
Stretching from Veteran’s Park to Worth St, in western Mt. Airy, is the Emily B. Taylor Greenway. The trail has been a hit with residents since the its construction in 2001, and remains arguably one...
|
NC |
2.3 mi |
Asphalt
|
|
|
A trip along the Gold Hill Rail-Trail through this historic village will transport you back to a time when North Carolina was the country's only gold-producing state. Signs posted every few hundred...
|
NC |
2.2 mi |
Dirt, Gravel
|
|
|
Greenhaven Greenway sits in the linear park of the same name. The trail mimics the course of Ryan Creek. It begins at Mystic Drive and parallels Lynhaven Drive south. After 500 feet, one branch loops...
|
NC |
0.63 mi |
Concrete
|
|
|
The High Point Greenway stretches 4.5 miles through the town of High Point, North Carolina. The paved path sits in the tree-lined riparian corridor along Boulding Branch, allowing residents of the...
|
NC |
4.5 mi |
Asphalt
|
|
|
Hillsdale Greenway is just one in Greensboro's catalogue of greenway trails scattered in neighborhoods across the city. The concrete trail sits in Hillsdale Park, paralleling South Buffalo Creek....
|
NC |
1.1 mi |
Concrete
|
|
|
This concrete trail travels the length of Lake Daniel Park, from Friendly Avenue to Mendenhall Street. The trail sits in the shadow of overhead power lines as it parallels North Buffalo Creek. The...
|
NC |
2 mi |
Concrete
|
|
|
Latham Park Greenway sits nestled among the neighborhoods of Latham Park, Iriving Park and Fisher Park in Greensboro. A concrete trail runs the length of Latham Park, from North Elm Street south to...
|
NC |
1.2 mi |
Concrete
|
|
|
In the 1870s, the arrival of the railroad into Winston-Salem helped spur the growth of its tobacco industry. Those factory buildings and warehouses survived into the present day and have been...
|
NC |
1.7 mi |
Asphalt
|
|
|
About 12 miles north of Charlotte, the McDowell Creek Greenway links the communities of Huntersville and Cornelius. The paved, mile-and-a-half route is part of the larger Carolina Thread Trail, a...
|
NC |
1.5 mi |
Asphalt
|
|