|
|
Running between Edgewood Drive and Meade Street in Appleton, the Apple Creek Trail is a 3.9-mile ribbon of smooth asphalt winding alongside a reedy stream.
About the Route
The Apple Creek Trail...
|
WI |
3.9 mi |
Asphalt
|
|
|
|
The Baird Creek Greenway is a trail system that includes several trails for variety of activities including walking, running, biking, mountain biking, snowshoeing, and cross-country skiing. The paved...
|
WI |
3.2 mi |
Asphalt
|
|
|
|
The Devil's River State Trail stretches 14.6 miles, connecting the towns of Denmark, Maribel, Francis Creek, and Kossuth in eastern Wisconsin. The trail is a scenic jaunt through farmland, woodland,...
|
WI |
14.6 mi |
Crushed Stone
|
|
|
|
The East River Trail winds for just over 6 miles along its namesake waterway through the communities of Green Bay, Bellevue, Allouez, De Pere, and Ledgeview. Its first section was developed in 1990...
|
WI |
6.5 mi |
Concrete
|
|
|
|
The Eisenbahn State Trail gives a nod to Wisconsin’s German heritage in its name—Eisenbahn is German for “railway.” The strict translation, “iron road,” refers to the iron rails originally used as...
|
WI |
24.3 mi |
Asphalt, Crushed Stone
|
|
|
|
The Fox River State Trail connects Packerland with pastureland as it travels for 24.5 miles between the hometown of NFL’s Green Bay Packers and farming communities south. Named for the river that...
|
WI |
24.5 mi |
Asphalt, Crushed Stone
|
|
|
|
Loop the Little Lake, or the Loop, is a 3.5-mile circle of trails, bike lanes, sidewalks and parks around the lower half of Little Lake Butte des Morte in Wisconsin, just north of the larger Lake...
|
WI |
3.5 mi |
Asphalt, Boardwalk, Concrete
|
|
|
|
Travelers on the Mariners Trail will be spoiled with beautiful vistas of beaches, parks, forests, and the sparkling waters of Lake Michigan. Supplementing the scenic landscapes are several trailside...
|
WI |
6.2 mi |
Asphalt
|
|
|
|
The Nelson Family Heritage Crossing is a 1,100-foot pedestrian/bicycle bridge crossing the Fox River between the downtown districts of the Village of Little Chute and the City of Kaukauna. Along with...
|
WI |
1.5 mi |
Asphalt, Boardwalk, Concrete
|
|
|
|
Appleton’s Newberry Trail follows the Fox River, its navigational canal locks and an active rail line at different points during its scenic trek. The area was once an industrial hub, but mature trees...
|
WI |
2.4 mi |
Asphalt
|
|
|
|
Closure Notice: The Newton Blackmour State Trail is closed for 2.5 miles from Highway 76 to Puls Rd. due to recent washouts. Please consult Wisconsin DNR for more current information.
The Newton...
|
WI |
21 mi |
Crushed Stone
|
|
|
|
The Shoreland 400 Rail Trail opened in 2013 on a former Union Pacific Railroad corridor through the heart of Sheboygan. More than 30% of Sheboygan County’s residents live within a mile of the trail,...
|
WI |
1.85 mi |
Asphalt
|
|
|
|
Despite its futuristic name, the Tomorrow River State Trail takes users on a tour of a historic rail-trail through beautiful Portage and Waupaca Counties. Trail users will find a good start at the...
|
WI |
29.2 mi |
Crushed Stone
|
|
|
|
The West Side Railroad Trail cuts a diagonal 1.5-mile route across Green Bay's western neighborhoods from South Oneida Street to Bond Street. Much of the paved pathway is pleasantly buffered by trees....
|
WI |
1.5 mi |
Concrete
|
|
|
|
The CE Trail, one of the longest trails in the Fox Valley region of Wisconsin, links Appleton and Kaukauna along busy County Highway CE. While not particularly scenic, the trail offers access to a...
|
WI |
5.8 mi |
Asphalt
|
|
|
|
The 85.2-mile Mountain-Bay State Trail, one of the longest trails in the state, travels a mostly scenic, wooded route through three counties—Marathon, Shawano, and Brown—as it makes its way from...
|
WI |
85.2 mi |
Asphalt, Crushed Stone, Dirt, Grass, Gravel
|
|
|
|
The Old Plank Road Trail parallels State Route 23—a road originally built out of wooden planks in the 1800s—from the western edge of Sheboygan to the Village of Greenbush. The trail was one of the...
|
WI |
37.6 mi |
Asphalt
|
|
|
|
The Prairie Trail offers a paved route of nearly 7 miles along the eastern boundary of Fond du Lac, a mid-sized city befitting its French name which means “foot of the lake” as it hugs the southern...
|
WI |
6.7 mi |
Asphalt
|
|
|
|
Closure Notice: The Wild Goose State Trail is currently closed between Prospect Rd. and Teal Rd. Please check with Wisconsin DNR for more current information.
The Wild Goose State Trail is a...
|
WI |
34.5 mi |
Asphalt, Crushed Stone, Dirt, Grass
|
|
|
|
On the western end, the Duck Creek Trail picks up where the Newton Blackmour State Trail leaves off, that is just east of the town of Seymour at Vanderheuvel Road. Traveling along an old railroad...
|
WI |
6 mi |
Crushed Stone
|
|