Explore the best rated trails in Roselawn, IN, whether you're looking for an easy walking trail or a bike trail like the Illinois & Michigan Canal State Trail and Spring Creek Greenway Trail . With more than 45 trails covering 4160 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.
Trail is closed at Rt. 30 heading North from Erie Lackwana trailhead.
I was traveling through to Ohio and wanted to ride this trail. Due to traffic on a Saturday with a concert at Soldier Field, I arrived a couple later than I had hoped. So I had to push the speed to do the whole trail. I got done as it was getting dark. I would encourage others to allow more time to enjoy it. Not knowing this in advance, I parked near trail construction and where the following day's event parking was being set up, so it was congested. I found the main trail (lots of sidewalks/paths going everywhere) and headed north. A few miles north and I was at the end. Going south, I got goofed up by the detour signs and other trails. A "north" or "south" sign on the detour signs might have helped. Maybe just me. I finally got on the trail and went north. The write-up says it is 19 miles long and ends at South Shore Cultural Center; however, the mile post ends at 18 (with a zero on the other side of the post) was at 71st street. That was where the red line on TrailLink also ended. Both close to each other, but I wasn't sure why the difference in mileage. I didn't have time to explore more. I turned around there.
Even though I don't like city driving and it all looked hectic to me (thankful for GPS voice commands), I wouldn't mind doing it again in the summer when more venues would be open and take all day to ride it by going a slower pace and seeing the sights. And maybe with someone else who will do the driving!
They started paving last fall. From County line rd heading West there is about 2-3 miles paved to Lake Shore County rd.
Straight flat the mile markers are off by 1.5 miles. The pavement is not smooth enough to skate on with ease. But for biking its fine. 80% friendly people to people of color.
Ok section, kind of dull. Agriculture & cows. Found a bit of shade by a grain elevator for lunch. Several washouts filled with tumbleweeds as you get closer to Lind.
rode the trail on 11/2/2024 roundtrip from manhattan road (mile 7) to the kankakee river (mile 22) . it was in good shape almost the whole length and without loose gravel anywhere.
We started in Akron and rode about 18 miles north. Loved it!!!
My wife & I rode two days from LaSalle toward Ottawa and from Ottawa to Marseilles on our recumbent etrikes. Had to turn around the first day before getting to Ottawa, as the trail became two narrow paths through the grass that were impassable for the trikes. The second day we had to lift our trikes over a fallen tree. There were no trail workers to be seen anywhere. That part of the trail rarely followed the canal, but instead wound through the woods on a cow path like trail. The 20 miles or so between LaSalle and Marseilles are not suitable for road bikes or recumbent trikes, but instead are only desirable for cross bikes or fat tire bikes preferably with electric assist.
I rode the Panhandle Pathway from the Kenneth trailhead to Winimac and back. Overall, it is a good trail for those who are wanting to get away from the crowds and do some riding. There is nothing specific to to tell about the trail except that the Tippecanoe River bridge is very well done. The trail is flat and easy to ride. The Winimac trailhead area is nice because there are public restrooms directly adjacent to the trail. Conversely, the Panhandle is experiencing the inevitable problem that comes with time. There are several areas that have tree roots heaving and then cracking the trail surface.
Rode the OST today. Well marked, flat and paved. A few tree roots but not significant. The trail goes through neighborhoods, parks and open land. Shaded most of the way. Overall a good 20 mile RT ride.
On 8/27/24, the National Park Service issued a solicitation for bids to improve the Marquette Trail within its boundaries as part of the overall Marquette Greenway project. Approximately 2.5 miles of the existing trail will become a 10-foot wide asphalt multi-use trail with 2-foot gravel shoulders, and include a new bridge. It looks like completion will be in 2026. Other segments of the Marquette Greenway are complete around Burns Harbor and Michigan City, and more will open by Fall 2024.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!