Find the top rated atv trails in Ft Wayne, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.
We started in Akron and rode about 18 miles north. Loved it!!!
We rode about 35 miles of this trail August, 2024. Day 1: D street trailhead to Williamsburg (22 miles round trip). Very rough road in Richmond and heavy traffic at 2 road crossings. Once we got to Webster it was a lovely ride to Williamsburg. Porta-john at Webster and Williamsburg. Nice little shelter with picnic tables in Williamsburg too. Day 2: Williamsburg to Losantville (25 miles round trip). Alternated between wooded areas and open farmland. Saw some animals and birds - including cardinals. The last 3 miles into Losantville follows US 35 and there is a lot of vehicle noise but the trail does not force you to cross US 35. We did walk across 35 in Losantville to gas station for drink and snack - there was some tables and chairs outside. Also used the restroom. Day 3: Medford north to just past US 35 (27 miles round trip). This is roughest part of path we rode. There were not only horizontal cracks but also deep vertical cracks in pavement that were dangerous to bike tires. Not much shade and not very scenic with several heavy traffic rode crossings, including crossing US 35 twice. We did stop at depot in Muncie. Nice restrooms, gift shop and trail info, including mileage chart that I did not find online anywhere.
For several decades the first 1.5 miles of the pumpkinvine nature trail heading out of Goshen was indeed crushed limestone. It was decent, but dusty, or iffy when wet. Well, this September the city finally decided to pave it and it’s awesome—wide, smooth asphalt, with limestone shoulders. In the last year, they also finished the section connecting CR 33 to CR 35 so the trail really feels like it’s finally done and among the nicer trails in the state. Be sure to check out Mooey’s, the Amish ice cream shop at mile marker 6. They’re open thru September 28.
This is a beautiful trail. We had to stop for two fawns standing on the trail. We watched a doe and a bald eagle in the river. There is a hairpin turn as you near Lagro, that has an immediate uphill climb.
The trail is getting widened so it will no longer be a glorified sidewalk. The surface will be asphalt. I can't wait to give it another chance!
If you want nature this is not the trail for you. Spent most of the trail crossing roads and watching out for cars.
We ( recumbent trike & e-bike) headed West from the Kiwanis park. Turned around after 9km as the surface was really tough on the trike. There’s 2 good wheel tracks for bikes, but the trike had to ride partially in the coarse trail ballast. Scenic area with farm views and a huge windmill farm in the distance.
It was hot and muggy, but under the canopy of trees it was wonderful. Some hills, but not too bad. This is one of my top three bike trails.
Very nice shaded trail. Would ride it again
7/19/24—just finished ride from Lehman Park, Berne to Snow cemetery on hard packed gravel ROW trail under construction. Nice ride even for 79 y/o with regular road bike. Scheduled to be paved starting late July.
Saw 4 red headed woodpeckers , numerous birds, chipmunks , rabbits and coyote scat. I was only one on trail during Friday early afternoon.
Hidden gem.
I’m not sure how this trail is a 5 star trail? The surface is mediocre with fragments, roots, and bumps. It’s confusing with multiple turns and trail closures. It’s unsafe with crossings at busy intersections and sections running along side busy roads. My husband and I used our road bikes. We were disappointed with the section we rode. Maybe other sections are better? We will not be returning or recommending this trail to others for biking.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!