Washington, IN Atv Trails and Maps

42 Reviews

Looking for the best Atv trails around Washington?

Find the top rated atv trails in Washington, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
0 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating

Now, More Than Ever, Trails Matter!

During COVID-19, trails are being counted on as places where people can find solace and respite and we need your support to keep trails open and provide these critical FREE resources! Please continue to practice physical distancing and check the status of your trail before heading out!

Trails by activity

Recent Trail Reviews

Milwaukee Road Transportation Trailway

Not bad conditions, no washouts, only a few sticks, but watch for walnuts! There is no parking at the U Street trailhead, but there is parking approx 1/3 mile east with trail access..

October, 2021 by philbonneau27

Not bad conditions, no washouts, only a few sticks, but watch for walnuts! There is no parking at the U Street trailhead, but there is parking approx 1/3 mile east with trail access..

Limestone Greenway

Well marked trail that is lined with trees, limestone, and wildflowers. Perfect for running, walking, and biking. It passes a sewage treatment plant, so you might smell poop for a short time. One of my favorite places for a walk.

September, 2021 by christinareeves426

Well marked trail that is lined with trees, limestone, and wildflowers. Perfect for running, walking, and biking. It passes a sewage treatment plant, so you might smell poop for a short time. One of my favorite places for a walk.

Milwaukee Road Transportation Trailway

Rural Indiana at it's best.

July, 2021 by frd1967

We started at the Williams Dam and rode to the end at Bedford, then back. Very shaded and nicely packed trail. Nice scenery and many bridges make it an interesting ride. The trail was in good shape the whole way. It was a great ride.

Accordion

Clear Creek Trail (IN)

clear creek trail

May, 2021 by dracersmith

Walked part of the trail today and was impressed! Clean, paved & well marked. I was surprised to see mile markers. Both families and individuals were walking, running and bike riding enjoying the day.

Pigeon Creek Greenway Passage

really good

April, 2021 by jjpeeplesr

The trail was much better than I expected it to be pretty well maintain nice bike path

Pigeon Creek Greenway Passage

Much better than I expected

March, 2021 by bikin-mike

I usually don’t expect much from city trails. Too many streets. This one was a pleasant surprise. Parked at Gavin Park and headed south. Some of the trail on the levee, some on creek side, some on city side. Some nice easy curves and hills over levee and under underpasses. Trail does go around some scrapyards. Some minor trash around the skatepark. Had about 3 miles without streets. Last couple miles downtown along river are next to street, but nice wide promenade separated by planters. Just have to watch out for all the walkers and the scooters. Lots of nice signs about the history of Evansville. I really enjoyed this ride. Probably the best city ride I’ve ever done. Thanks Evansville.....bikin-mike Mar 2021

Pigeon Creek Greenway Passage

Much better than I expected

March, 2021 by bikin-mike

I usually don’t expect much from city trails. Too many streets. This one was a pleasant surprise. Parked at Gavin Park and headed south. Some of the trail on the levee, some on creek side, some on city side. Some nice easy curves and hills over levee and under underpasses. Trail does go around some scrapyards. Some minor trash around the skatepark. Had about 3 miles without streets. Last couple miles downtown along river are next to street, but nice wide promenade separated by planters. Just have to watch out for all the walkers and the scooters. Lots of nice signs about the history of Evansville. I really enjoyed this ride. Probably the best city ride I’ve ever done. Thanks Evansville.....bikin-mike Mar 2021

Pigeon Creek Greenway Passage

Rode this starting at Sunset Park, very scenic at the beginning. Nice the rest of the way. Garvin Park is very pretty, not many places for bathroom stops.

September, 2020 by abn2nds

Rode this starting at Sunset Park, very scenic at the beginning. Nice the rest of the way. Garvin Park is very pretty, not many places for bathroom stops.

Pigeon Creek Greenway Passage

Started at Sunset Park, very nice trail and perfect weather today.

September, 2020 by abn2nds

Started at Sunset Park, very nice trail and perfect weather today.

B-Line Trail

Info you can use...

September, 2020 by timothyrw

We started on the North end of the trail. We parked at the Rev Ernest D. Butler Park. Use the parking lot off of Fairview St on the east side of the park; this is by the playground/swings. There are about 7-8 parking spaces. From there it is a very short ride north to enter the trail (like, coast down the hill and there it is).

From there we rode the three miles of the B-Line. We went on a Sunday and the trail was relatively busy. Along the way we rode through part of downtown but traffic was very light. Vehicles were respectful of the crossings and would stop if they were paying attention.

Along the B-Line we saw a bike repair shop, bike/skate board park, splash pad, playground, dog park, and more. Bloomington has really developed this trail and the amenities on it. Due to COVID the water fountains were covered.

The trail is paved and mostly flat. There was one large incline overpass but nothing too hard. The B-Line section ends at W Country Club Dr where there is another area to park if you wanted to start on the South end and travel north. There are approximately 17 or so parking spaces there with Handicapped parking.

We continued south onto the gravel Bloomington Rail Trail. We actually rode straight south from the B-line and realized we were on a motor path that runs parallel to the Bloomington Rail Trail; to get on the Rail Trail there is a slight jog to the west (by the parking lot). We were not the only ones who did this; but the actual trail is better in that it has tree coverage and it was a really sunny day. We eventually cut over to the proper trail when the motor path ended as we continued south.

We stopped at a large creek bridge that is just south of the roundabout for the Clear Creek Trail. We rested, took some pictures, and headed back North. We had a 9-year old and 12-year old with us and they were worn out at the end of what turned out to be a 10-mile round trip bike ride. It was a great time, though!

Milwaukee Road Transportation Trailway

Trees down

July, 2020 by printerhughes

There are presently trees down on the trail following a storm (Probably July 11 or 12, 2020). The route is very blocked by bridge number 8, though walkers have moved around one side. This looked too difficult for us to navigate with bicycles. There is a large tree down over the path just east of bridge 16, approx. mile 4.7. It is possible to walk a bicycle under this tree. I do not know where or how to report these. Love the trail, good shade and good condition and beautiful.

Milwaukee Road Transportation Trailway

Shaded trail keeps you cool

June, 2020 by patrickhconnor

Great tree canopy for majority of trail, the bait shop and Williams Dam are must sees. First few miles from Bedford start need attention, stone should be crushed and packed down and many wash outs need to be addressed

Find Nearby City trails

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR