|
|
Methuen Rail Trail connects three communities in northeastern Massachusetts as it follows the route of the former Manchester and Lawrence Branch of the Boston and Maine Railroad.
The rail-trail's...
|
MA |
2.4 mi |
Asphalt, Crushed Stone
|
|
|
|
The Middleton Rail Trail is a trail along the former Essex Railroad. The trail stretches 4.5 miles from the North Andover border, through the town, and will eventually join the Danvers Rail...
|
MA |
4.5 mi |
Crushed Stone
|
|
|
|
For many commuters, the Minuteman Commuter Bikeway provides freedom from congested traffic in the northwest Boston suburbs. For others, the 10.1-mile paved trail between Cambridge and Bedford serves...
|
MA |
10.1 mi |
Asphalt
|
|
|
|
The Mystic River Greenway is part of the Mystic Greenways trail system, which also includes the Wellington Greenway and the Malden River Greenway. When completed, the trail will connect the...
|
MA |
4 mi |
Asphalt, Boardwalk
|
|
|
|
The Nashua River Rail Trail stretches from southern Nashua, New Hampshire, to downtown Ayer, Massachusetts, connecting to the towns of Pepperell and Groton. The trail is built on the former rail...
|
MA, NH |
12.4 mi |
Asphalt
|
|
|
|
The New Hampshire Seacoast Greenway is an 8-mile rail-trail with a crushed-stone surface that stretches between Portsmouth and the North Hampton/Hampton border. Following a former Pan Am Railways...
|
NH |
8 mi |
Crushed Stone
|
|
|
|
The North Bank Bridge, which opened in 2012, provides a safe and convenient pedestrian and bicycle connection between Cambridge's North Point Park and Paul Revere Park in Charlestown. Spanning 690...
|
MA |
0.5 mi |
Concrete
|
|
|
|
The Northern Rail Trail is New Hampshire’s longest rail-trail conversion, spanning 59 meticulously maintained miles, weaving along corn and hay fields, lakes, wetlands, and numerous historic sites,...
|
NH |
59 mi |
Cinder, Crushed Stone
|
|
|
|
Offering picturesque woodland and marsh surroundings, the Old Eastern Marsh Trail stretches for 3.7 miles between the MA-NH border and the north bank of the Merrimack River. The southern 2.3-mile...
|
MA |
3.7 mi |
Asphalt, Boardwalk, Concrete
|
|
|
|
The Peanut Trial is a distinct trail in the town of Newton that spans one-mile. This rail-trail was meant to connect to the Jay McLaren Memorial Trail. However, due to a controversial lawsuit by land...
|
NH |
1.5 mi |
Cinder
|
|
|
|
The Piscataquog Trail, though only about 2 miles long, provides a vital off-road link between the communities on the western side of the Merrimack River (the West Side of Manchester) to several parks...
|
NH |
2.1 mi |
Asphalt
|
|
|
|
Currently just over two miles long, the Salisbury Point Ghost Trail provides a peaceful journey through the woods.
About the Route
From its western end on Elm Street in Amesbury, the trail heads...
|
MA |
2.2 mi |
Asphalt, Crushed Stone
|
|
|
|
Running through the city of Somerville, the Somerville Community Path is 3.2-mile paved rail-trail that connects with several other multiuse trails—contributing to the developing trail network in...
|
MA |
3.2 mi |
Asphalt
|
|
|
|
Meandering through South Portland, the Greenbelt Walkway connects the neighborhoods south of the Fore River. The paved, multiuse trail offers three distinct vistas of the Portland waterfront and...
|
ME |
5.6 mi |
Asphalt
|
|
|
|
The Wellington Greenway is a section of the Malden River Greenway in Medford, Massachusetts. Eventually, the Wellington Greenway will be connected to the other sections of the Malden River Greenway in...
|
MA |
2.5 mi |
Asphalt
|
|
|
|
The Windham Rail Trail passes through the woodsy periphery of Windham in southern New Hampshire, but it sits in the heart of the future cross-state Granite State Rail Trail. The trail is 4.3 miles...
|
NH |
4.3 mi |
Asphalt
|
|
|
|
The Amesbury Riverwalk (also known as the Powwow Riverwalk) offers visitors and residents a picturesque connection between a resurgent waterfront district on the Powwow River and a modern shopping...
|
MA |
1.3 mi |
Asphalt
|
|
|
|
The Dover Community Trail snakes its way through the heart of the Garrison City—so nicknamed for the fortified log houses, or garrisons, built by 17th-century settlers—-offering a variety of trail...
|
NH |
4.2 mi |
Asphalt, Crushed Stone, Dirt
|
|
|
|
The Gillis Memorial Bridge Connector (a.k.a the Salisbury Rail Trail Connector,) is a 0.6-mile link between two rail-trails: Salisbury's Old Eastern Marsh Trail and Newburyport's Clipper City Rail...
|
MA |
0.6 mi |
Asphalt
|
|
|
|
The Mayor James J. Fiorentini Bradford Rail Trail is constructed along the former Georgetown Branch of the Boston and Maine Railroad and runs along the Merrimack River in Bradford, MA. It runs nearly...
|
MA |
0.77 mi |
Asphalt
|
|
|
|
The Northern Strand Community Trail runs almost 10 miles through the cities of Everett, Malden, Revere, and the town of Saugus and provides a variety of experiences.Â
About the Route
Access the...
|
MA |
9.9 mi |
Asphalt
|
|
|
|
The Salem Bike-Ped Corridor is a 4.95-mile trail in Salem. The trail is paved between its northern end at intersection of Broadway & Range Street and Main Street. South of Main Street, the trail is...
|
NH |
4.95 mi |
Asphalt, Dirt, Grass
|
|
|
|
Although less than a mile, the trail running through Salisbury Beach State Reservation offers lovely views of the beaches off the northeastern coast of Massachusetts, just a few miles south of the New...
|
MA |
0.6 mi |
Crushed Stone, Grass
|
|
|
|
The South Manchester Rail Trail is a developing bike/pedestrian path that currently runs through the City of Manchester's southeast neighborhoods to the border with the Town of Londonderry. The...
|
NH |
1.8 mi |
Asphalt
|
|
|
|
The Squannacook River Rail Trail is 3.7 miles long, from Depot St in the center of Townsend, MA, to the Bertozzi Wildlife Management Area in Groton, MA. The trail occupies the Greenville Branch of the...
|
MA |
3.7 mi |
Crushed Stone
|
|
|
|
The Stevens Rail Trail is part of the Concord-Lake Sunapee Rail Trail, which follows the historic Concord-Claremont Railroad corridor. Located about a dozen miles west of Concord, the Stevens Rail...
|
NH |
1.65 mi |
Crushed Stone, Gravel
|
|
|
|
The Tri-Community Greenway is a 10.6-mile multiuse trail that connects Stoneham, Woburn and Winchester. Part of the route runs along a former railroad corridor.
About the Route
At its southern...
|
MA |
10.6 mi |
Asphalt
|
|
|
|
The WOW Trail is named after the three bodies of water that can be seen from this rail trail: Lake Winnipesaukee, Opechee Bay, and Lake Winnisquam. This picturesque 2.7-mile trail shares a corridor...
|
NH |
2.7 mi |
Asphalt
|
|
|
|
Connecting the cities of Watertown and Cambridge, the 2-mile 12ft-wide paved Greenway runs along the former corridor of the B&M Railroad’s Watertown Branch. The southern end of this multi-use trail...
|
MA |
2 mi |
Asphalt
|
|
|
|
The Winnipesaukee River Trail runs for nearly 5 miles between the towns of Franklin and Tilton, nestled in the White Mountains of New Hampshire.
About the Route
The Winnipesaukee River Trail...
|
NH |
4.94 mi |
Asphalt, Crushed Stone, Dirt, Gravel
|
|
|
|
Following the historic Concord-Claremont Railroad corridor, the Concord–Lake Sunapee Rail Trail will eventually connect communities from Concord to the southern point of Lake Sunapee via a multiuse...
|
NH |
5.65 mi |
Asphalt, Boardwalk, Crushed Stone, Dirt, Gravel
|
|
|
|
The Bridge Street Bike Trail begins near Curtis Park and travels south through downtown Salem, closely following the Bridge Street Bypass. The short trail runs through residential, retail and...
|
MA |
1 mi |
Asphalt
|
|
|
|
Lowell's Canal System Trails are part of Lowell National Historical Park in Lowell, Massachusetts. The park preserves some of America's industrial past: its 19th-century textile mills formed the first...
|
MA |
1.9 mi |
Asphalt, Concrete
|
|
|
|
The Mayor Anthony Salvo Bike Path is 1.8-mile paved trail, which provides a connection between the Marblehead Rail Trail and downtown Salem.
Located near the Marblehead/Salem town line on Lafayette...
|
MA |
1.7 mi |
Asphalt
|
|
|
|
The Swampscott Rail Trail is a developing rail-trail in the North Shore community of Swampscott. When complete, the trail will extend two miles through the heart of the town ending with a seamless...
|
MA |
0.3 mi |
Crushed Stone
|
|