Danville, VA Wheelchair Accessible Trails and Maps

201 Reviews

Looking for the best Wheelchair Accessible trails around Danville?

Find the top rated wheelchair accessible trails in Danville, whether you're looking for an easy short wheelchair accessible trail or a long wheelchair accessible trail, you'll find what you're looking for. Click on a wheelchair accessible trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
24 Results
Activities
Length
Surfaces
Type

American Tobacco Trail

22.2 mi
State: NC
Asphalt, Crushed Stone

Atlantic & Yadkin Greenway

7.74 mi
State: NC
Asphalt, Concrete, Crushed Stone

Bolin Creek Trail

2.2 mi
State: NC
Asphalt

Dick & Willie Passage Rail Trail

6.9 mi
State: VA
Asphalt

Ellerbee Creek Trail

1.5 mi
State: NC
Asphalt, Concrete

Riverwalk Greenway

1.8 mi
State: NC
Asphalt, Boardwalk

Riverwalk Trail (VA)

11.9 mi
State: VA
Asphalt, Concrete

South Ellerbee Creek Trail

1.4 mi
State: NC
Asphalt

West Ellerbee Creek Trail

2.25 mi
State: NC
Asphalt

Bicentennial Greenway

14.5 mi
State: NC
Asphalt, Concrete, Gravel

Downtown Greenway

4 mi
State: NC
Asphalt, Concrete

Richmond and Danville Rail-Trail

5.5 mi
State: VA
Crushed Stone

Uptown Spur Trail

0.7 mi
State: VA
Asphalt

Warren Creek Trail

1.1 mi
State: NC
Asphalt

Stadium Drive Trail

1.9 mi
State: NC
Concrete

Carolina North Greenway

0.67 mi
State: NC
Asphalt

Lake Daniel Greenway

2 mi
State: NC
Concrete

Lower Booker Creek Trail

0.9 mi
State: NC
Concrete

Mayo River Rail Trail

1.8 mi
State: VA
Asphalt

Northeast Community Greenway

1.2 mi
State: NC
Asphalt
Accordion

Rolling Roads Greenway

0.63 mi
State: NC
Concrete

Sandy Creek Trail (NC)

0.75 mi
State: NC
Asphalt

Southeast Greenway

1.2 mi
State: NC
Asphalt

Staunton River Battlefield Rail-Trail

1.25 mi
State: VA
Crushed Stone
Trail Image Trail Name States Length Surface Rating
Closure notice: Due to damage from Hurricane Helene, the American Tobacco Trail is closed between the Wimberly Road trailhead and the Town of Apex White Oak Greenway. Please refer to information from...
NC 22.2 mi Asphalt, Crushed Stone
Closure Notice: The northernmost trestle bridge along the route is closed between Bur-Mil Park and Strawberry Rd. for replacement. Please check with the City of Greensboro for more current...
NC 7.74 mi Asphalt, Concrete, Crushed Stone
Bolin Creek Trail is a 3-mile out and back multipurpose trail in Chapel Hill, North Carolina. The paved trail begins at Community Center Park and heads west, then ducks under the Franklin St. bridge....
NC 2.2 mi Asphalt
Overview The Dick & Willie Passage Rail Trail runs for 6.9 miles on a former Danville & Western Railroad corridor, which was acquired by Southern Railway in 1920 and ultimately abandoned by its...
VA 6.9 mi Asphalt
The Ellerbee Creek Trail is part of a chain of trails running across Durham, known as the North-South Greenway. This trail picks up where the Stadium Drive Trail leaves off, on Stadium Drive next to...
NC 1.5 mi Asphalt, Concrete
The Riverwalk Greenway is a 2-mile trail in Hillsborough, North Carolina.  The shared use trail begins at Gold Park and heads east, staying close to the river for most of its length, before concluding...
NC 1.8 mi Asphalt, Boardwalk
Overview The nearly 12-mile paved Riverwalk Trail, also called the “Riverwalk on the Dan,” is part of Danville’s expanding network of trails. This scenic pathway along the Dan River connects...
VA 11.9 mi Asphalt, Concrete
The North-South Greenway is a complex of trails that link up to allow residents to cross the heart of the City of Durham without the need for a car. The South Ellerbee Creek picks up the southward...
NC 1.4 mi Asphalt
The West Ellerbee Creek Trail winds along the stream of the same name and is part of Durham's North-South Greenway, a series of multiuse trails crossing the city of Durham. Beginning by Indian...
NC 2.25 mi Asphalt
Overview The Bicentennial Greenway is a 14.5-mile paved pathway connecting the City of Greensboro to the City of High Point, NC. The trail, which is a joint effort of the two cities and Guilford...
NC 14.5 mi Asphalt, Concrete, Gravel
The Downtown Greenway is a paved multi-use trail winding through Greensboro, North Carolina. The trail is 4 miles long and forms a complete loop around Greensboro. There is often a landscaped buffer...
NC 4 mi Asphalt, Concrete
The Richmond and Danville Rail-Trail the follows part of the right-of-way of the old railroad of the same name, an important transportation corridor for the Confederacy during the Civil War. The...
VA 5.5 mi Crushed Stone
Martinsville's Uptown Spur Trail, as its name implies, runs along an abandoned railroad spur line. Like the trains before its conversion, the paved trail branches off from the former main line—now the...
VA 0.7 mi Asphalt
The northernmost segment of Durham's North-South Greenway, Warren Creek Trail provides a serene hiking or biking experience and access to a neighborhood park. The trail extends between Horton Road...
NC 1.1 mi Asphalt
The Stadium Drive Trail is a component of Durham's North-South Greenway, a series of multiuse trails crossing the city of Durham. While the Stadium Drive Trail mostly utilizes the sidewalks and...
NC 1.9 mi Concrete
The Carolina North Forest (aka the Horace Williams Tract) is made up of 750 acres owned by the University of North Carolina in Chapel Hill. The forest and its trails provide respite for members of the...
NC 0.67 mi Asphalt
This concrete trail travels the length of Lake Daniel Park, from Friendly Avenue to Mendenhall Street. The trail sits in the shadow of overhead power lines as it parallels North Buffalo Creek. The...
NC 2 mi Concrete
The Lower Booker Creek Trail is a paved neighborhood trail in Chapel Hill, North Carolina. The neighborhood trail cuts through the woods around Booker Creek, providing a natural escape for neighbors...
NC 0.9 mi Concrete
Following a former corridor of the Danville and Western Railway through downtown Stuart, the Mayo River Rail Trail is a paved multi-use path that runs along the Mayo River. Nicknamed "Dick and Willie"...
VA 1.8 mi Asphalt
The Northeast Community Greenway is 1.2 miles of paved hiking and biking pathway. The trail is a safe place that Greensboro residents can get outside and into nature. On a given day, you will be in...
NC 1.2 mi Asphalt
Accordion
Rolling Road Greenway is one of Greensboro's collection of neighborhood-based pathways bringing residents close to the water bodies in their city; in this case, South Buffalo Creek. The concrete trail...
NC 0.63 mi Concrete
The Sandy Creek Trail cuts a leafy course through Sandy Creek Park, stretching between the park entrance and Pickett Road. It is asphalt-paved, relatively flat and suitable for a variety of uses,...
NC 0.75 mi Asphalt
Neighbors can meet and interact on the Southeast Greenway, a 1.2-mile paved recreation path. The trail begins continues on where the Downtown Greenway leaves off, heading south starting at the Freeman...
NC 1.2 mi Asphalt
The Staunton River Battlefield Rail-Trail crosses through the state park battlefield of the same name in rural south-central Virginia. The gravel trail follows an abandoned corridor of the old...
VA 1.25 mi Crushed Stone

Recent Trail Reviews

American Tobacco Trail

Bucket List Trail

March, 2025 by mlawlor72

This trail has been on my “bucket list” and I finally got to ride it! Absolutely stunning early spring day for riding - sunshine and warmth. I started the trail at its head point - New Hill Olive which was well marked off the road. Lots of parking. Has a bathroom. The segway portion leading down to the trail is loose gravel and on the steep side - take note - wasn’t easy to bike on and I could see people taking spills here. From here, the trail is packed sand which I find more enjoyable to ride on as there aren’t root humps and bumps. New Hope Church Rd is a beautiful stop with bathrooms and water fountains. From there it turns into mixed use with asphalt and packed sand.

Dick & Willie Passage Rail Trail

More hills than expected. We rode from parking lot at Fisher Street to the sports complex and there was a lot of street/sidewalk riding. Glad I had my ebike.

March, 2025 by ljsanfo

More hills than expected. We rode from parking lot at Fisher Street to the sports complex and there was a lot of street/sidewalk riding. Glad I had my ebike.

Downtown Greenway

Actually 3.5 miles finished. Working on the last .5 mile. Will be a 4 mile loop around the city. Nice paved trail.

March, 2025 by geraldlee63

Actually 3.5 miles finished. Working on the last .5 mile. Will be a 4 mile loop around the city. Nice paved trail.

Accordion

Tobacco Heritage Trail

Don’t ride when wet

January, 2025 by terriannjma_tl

This is a very lovely trail with some elevation gain and loss, but very quiet and remote. The key is do not ride this trail if there has been any substantial moisture! We rode this trail when there was snow and ice on the trail as well as melt water and the trail was like riding through quicksand. Very difficult! Maybe during the summertime when it’s dry it would be lovely but not today. Riding on the snow and ice was also treacherous as there were packed down frozen tracks from a truck that uses the path for maintenance and access to surrounding areas.

Uptown Spur Trail

Connector Trail

November, 2024 by kristin.kaylor

This is a connector trail, connecting uptown to the Dick & Willie. It’s paved and kept clean, there is a nice bathroom at the parking area.

American Tobacco Trail

We made a trip from western NC to ride the trail. Riding bikes we are always looking for longer trails and this was worth the trip!Also got to experience and enjoy the Durham area. Hopefully we'll get the opportunity to return sometime soon.

October, 2024 by 1anonly0069

We made a trip from western NC to ride the trail. Riding bikes we are always looking for longer trails and this was worth the trip!Also got to experience and enjoy the Durham area. Hopefully we'll get the opportunity to return sometime soon.

Bicentennial Greenway

Nice trail – for biking at low speeds

October, 2024 by wmclarin

Just rode the whole trail. Trail is fully paved, goes through some really pretty wooded areas. It’s hilly, and the pavement is full of bumps caused by tree roots. Fine for casual bikers, not great for high-speed road bikers. There is a stairway towards the southern end that does accommodate bikes. But it’s nicely done and well maintained.

Ellerbee Creek Trail

Shaded, paved path with side trails

September, 2024 by vanessarenilde.ford

Main path is flat and shaded. A hidden statue is along the way. There are some side trails to extend the walk.

Atlantic & Yadkin Greenway

Nice Local Trail

May, 2024 by tayyarahdavidson

We enjoyed the trail. We rode from Guilford Military Park in Greensboro to Burmill Park In summerfield. Lots of up and down hills but not too strenuous. Paved and well maintained. Nice resting stops along the way.

Atlantic & Yadkin Greenway

bridge is out

April, 2024 by brian.laney8

The bridge crossing Lake Brandt 1/4 mile south of Strawberry Rd is blocked off. The detour is Battleground Rd to Bur-Mil park.

Atlantic & Yadkin Greenway

Has Potential

March, 2024 by prial

We began our ride at the northern terminus and rode only about a mile and a quarter before we came to a bridge that was closed and had to turn around. We got back in the car and went to a trailhead further south that was only to be found in the heart of an apartment complex. We rode in circles not able to find the trail leading to where the opposite side of the bridge closure might be. So we got back in the car once more and found the southern terminus of the trail and tried again. It was a better start with a stop at the Guildford Courthouse National Military Site (part of the National Park Service) where we could ride along the battleground car/bike tour road. Generally, the trail is not well signed and at points it is a shared sidewalk along busy roads. Coming from the cold of the north, we were looking to begin our bike season in a warmer March climate. The trail sections of this ride would be beautiful come April - September. This was a very hard-won 16.5 mile ride.

American Tobacco Trail

very busy trail today

January, 2024 by luke.syvinski

Went 11 miles biking today and it was very busy surprisingly busy for 30 degree Monday in mid January but still a good day

Find Nearby City trails

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.