Find the top rated horseback riding trails in Kinnelon, whether you're looking for an easy short horseback riding trail or a long horseback riding trail, you'll find what you're looking for. Click on a horseback riding trail below to find trail descriptions, trail maps, photos, and reviews.


















_190952_st.jpg)

Very scenic good ride , if your biking I would recommend ride early otherwise you encounter many walkers , strollers etc which can be a hazard if you are biking and cone around a corner the a surprise.
Nice trail to get in 10 round trip , scenic , rest areas , food .
Wonderful trail. Part of the larger Empire State Trailway. This part from Eastview to Baldwin Place is the section I ride the most. Mostly shaded once you're north of Millwood with plenty of spots where you can stop for a bite or veer off for road riding near the reservoirs.
My wife and I walked the trail after dinner tonight. It’s a fine 12 foot wide trail, very well maintained and great for moms running with strollers or teaching kids to ride a 2 wheeler. Too short for a serious adult bike ride and it’s not terribly scenic but it’s nonetheless a nice addition for the community. It does lack mileage markers which would be helpful.
The trail is not accessible for a 3-mile stretch. From Green Haven and then Eastbound is impossible to pass. Trees have fallen down virtually every 50 yards blocking passage. I carried my bike past about 6 trees and each time I saw another tree blocking the trail. I came across a clean up crew that told me the downed trees went all the way to Green Haven. I was 3 miles east of Green Haven when the mess started. There is also debris along the entire section which I was fortunate not to get a flat tire. The cleaning crew told me they have only 4 people and they will try to hire a contractor to clear the trees. There is no way a crew of 4 people could handle this. It would take them months to clean it up. (July 10, 2026)
The Trailways Bridge over the river in Brewster is open, eliminating the on-road detour. The eastern end is currently at the NY/CT line at Farrington Woods (with trail parking) in CT. Long range plans are to develop the CT portion of the RR path to Danbury.
There are far more legit parking areas than currently shown on TrailLink. Services are few and some might seem close lack easy access from route to road. High point is Whaley Lake. The trail is in good condition for it's entire length.
26 flat miles between Jim Thorpe and White Haven. The section from White Haven south to Rockport is crushed stone and we did it on road bikes with 25mm tires no problems. Going north from Jim Thorpe, there were washouts filled with sand and wider tires would have been nice.
The trail goes downhill 1-2% as you head south.
This isn’t a trail in any real sense, but is clearly intended to be the entrance to a more ambitious path along the now-overgrown elevated rail line leading away from Summit. It’s literally a few hundred yards that ends in a locked gate. Nothing to see here unless you’re being a radical completion key for every trail listed in the app. 2 stars for potential, here’s hoping there’s some further expansion somewhere in the works.
Today has been a rail trail rail fan dream come true. I rode through the Grand Canyon of Pennsylvania on the D&L rail trail. To top off the beauty of this area I also got to see up close the historic Union Pacific “Big Boy” 4014. She’s been traversing the country commemorating the 250 birthday of our nation. Needless to say I’ve had my bit of heaven on earth today.
Jennifer and I rode the section north of White Haven to Black Diamond Trailhead and then turned around and rode back White Haven on 6/5/2026 for a 21.8-mile ride. If you like to ride thru the woods this section of the trail is a good section for that it is also is a good ride on a hot sunny day, lots of shade. We did not like the parts where there were only 2 dirt paths with grass between them. There is an increase in elevation of approx. 638 feet, to us it was a noticeable grade, it did the return trip more enjoyable. We will ride this section of the trail again.
The trail from Lawrenceville to Hopewell is well maintained, has good signage and has some beautiful views. If you decide to do the loop, be aware that in its entirety it’s about 23 miles, not 19. You also will need to go on some roads and travel through neighborhoods and commercial sites in the trail gap. If I do this trail again, I would only do the first half. The trail from Hopewell to Princeton was not great and honestly not worth the trip.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!