|
Whetstone Creek Trail, built on an old rail spur, winds through the Adams Crossing and Windsor Hills neighborhoods of northwest Atlanta. Much of the trail travels through woodlands and Whetstone...
|
GA |
1.4 mi |
Concrete
|
|
|
The East Decatur Greenway offers a pleasant outdoor experience and community connector in the Atlanta metropolitan area. The paved pathway begins across the street from MARTA's Avondale Station and...
|
GA |
1.2 mi |
Concrete
|
|
|
The East Point PATHÂ is an ongoing project that includes at least 9.6 miles of multi-use trails and greenways, with the potential for developing a total of 25 miles with connections to the Atlanta...
|
GA |
1.4 mi |
Concrete
|
|
|
The picturesque Oxford Trail winds along Turkey Creek through the heart of the charming southern town of Oxford. The wooded pathway runs behind the Oxford College campus and offers a kiosk with...
|
GA |
1.2 mi |
Concrete
|
|
|
The first phase of the Proctor Creek Greenway opened in May 2018 and stretches nearly 3 miles in northwestern Atlanta, surrounded by the neighborhoods of Bankhead, Grove Park, Rockdale and West...
|
GA |
2.9 mi |
Concrete
|
|
|
The Southside Trail is a developing project in the ambitious Atlanta BeltLine system, occupying a stretch of former rail corridor to the south of downtown Atlanta. The rail-trail provides a connection...
|
GA |
4.1 mi |
Concrete, Dirt
|
|
|
The Westside Trail offers a tree-lined route in Atlanta, running from University Avenue to Lena Avenue along the former Louisville and Nashville Railroad. It connects the historical neighborhoods of...
|
GA |
5.52 mi |
Concrete
|
|
|
Although only a half-mile long, the Yellow River Trail is Newton County’s first rail-trail and offers a serene and scenic experience under a lush tree canopy. It opened in December 2015 and is nestled...
|
GA |
0.5 mi |
Concrete
|
|
|
Conceived in 1996, the Ocmulgee Heritage Trail is the jewel of Macon’s park system. At present, the entire system is over 12 miles long, flanking both sides of the Ocmulgee River through downtown...
|
GA |
12.5 mi |
Boardwalk, Concrete, Crushed Stone, Gravel, Woodchips
|
|
|
Overview
To most Atlanta residents, the Stone Mountain Trail is a short greenway through Freedom Park and Candler Park. In reality, the Stone Mountain Trail is much more: a continuous 25-mile...
|
GA |
25.23 mi |
Asphalt, Concrete
|
|
|
Castlewood Road Path offers a short, paved route through a residential area of Tyrone, about 25 miles southwest of Atlanta. The trail is part of a larger effort to create car-free connections between...
|
GA |
1.8 mi |
Asphalt
|
|
|
When Georgia's Department of Transportation undertook a major construction project to build new highway infrastructure in northwest Atlanta, local organizations pushed to make sure that the state...
|
GA |
0.5 mi |
Gravel
|
|
|
The Confluence Trail winds through the woods where the North and South Forks of Peachtree Creek meet, offering a peaceful retreat from the hustle and bustle of the city.
The trail runs parallel to...
|
GA |
1.5 mi |
Asphalt
|
|
|
Running underneath the I-85/GA-400 overpass, the Creek Walk Connector provides a link between the Confluence Trail, the PATH400 Greenway Trail, and the Cheshire Farm Trail. The paved trail is smooth...
|
GA |
0.4 mi |
Concrete
|
|
|
The Decatur Trolley Line Trail is a paved path that runs through woods in the neighborhoods of McDonugh-Adams-Kings and College Heights in the city of Decatur. The trail follows the former trolley...
|
GA |
0.3 mi |
Asphalt, Concrete
|
|
|
The Fishing Creek Community Trail is a 1.3 mile public pathway from Flagg Chapel Baptist Church to the Oconee River Greenway. The trail is built with crushed gravel and woodchips. It runs from the...
|
GA |
1.3 mi |
Gravel, Woodchips
|
|
|
Jesters Creek Trail is a multipurpose recreation path located in Clayton County, Georgia. The trail winds its way through a forested park, cutting a sun-dappled swath through the towering trees. It's...
|
GA |
2.3 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The Northeast Trail is part of the Atlanta BeltLine, a network of trails around the city. When it's finished, the Northeast Trail will connect the northern end of the Eastside Trail to the Lindbergh...
|
GA |
2 mi |
Asphalt, Crushed Stone, Dirt, Gravel
|
|
|
The Northwest BeltLine Connector is part of the Atlanta's developing PATH trail network. Together with the Northside Trail, the connector trail forms a 4-mile route that includes a loop around the...
|
GA |
3 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The Olde Town Conyers Trail is a scenic 4.9-mile pathway that winds through the heart of historic Conyers. The trail provides a delightful mix of natural beauty and urban charm as it passes through...
|
GA |
4.9 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The PATH Parkway is the result of an innovative collaboration between the PATH Foundation, Georgia Institute Technology and the City of Atlanta. The creation of this multimodal corridor involved the...
|
GA |
1.5 mi |
Asphalt, Concrete
|
|
|
The Panola Mountain Greenway is a multiuse, paved trail that winds through the woods for almost 3 miles in Stockbridge. Although the surface of the trail is smooth and wide, the route is somewhat...
|
GA |
2.8 mi |
Boardwalk, Concrete
|
|
|
The Senoia Multi-Use Trail is a 10-foot-wide, paved path that runs from the Ivy Ridge subdivision to Seavy Street. The shared-use path has a mix of paved sections and wooden boardwalks, which are used...
|
GA |
1.5 mi |
Asphalt, Boardwalk
|
|
|
The Southwest Connector Trail is part of the Atlanta BeltLine, a 33-mile network of paved trails throughout the city. Although currently disconnected from other segments of the BeltLine, this one-mile...
|
GA |
1.1 mi |
Concrete
|
|
|
Atlanta's first trolleys were developed in 1870s and the many lines were consolidated to form the Georgia Power Company. The Trolley Line Trail represents the first installment of an effort to convert...
|
GA |
1 mi |
Asphalt, Concrete
|
|
|
The West End Trail was the first section to open of the greater 33-mile Atlanta BeltLine network of proposed trails. This 12-foot wide, multi-use path extends from Westview Drive south of I-20, across...
|
GA |
2.3 mi |
Concrete
|
|
|
The Westside Connector Trail is crucial to providing access for previously disconnected neighborhoods to the wider BeltLine system. The trail begins on Northside Drive and heads northwest, occupying a...
|
GA |
1.7 mi |
Concrete
|
|