|
Travelers on the Mariners Trail will be spoiled with beautiful vistas of beaches, parks, forests and the sparkling waters of Lake Michigan. Supplementing the scenic landscapes are several trailside...
|
WI |
6.2 mi |
Asphalt
|
|
|
The Mascoutin Valley State Trail is divided into two segments along a former corridor of the Chicago and North Western Railway. The eastern section runs 10 miles between Fond du Lac and Rosendale. The...
|
WI |
21 mi |
Crushed Stone, Grass, Gravel
|
|
|
The 83-mile Mountain-Bay State Trail, one of the longest trails in the state, travels a mostly scenic, wooded route through three counties—Marathon, Shawano, and Brown—as it makes its way from Weston...
|
WI |
83.4 mi |
Asphalt, Crushed Stone, Dirt, Grass, Gravel
|
|
|
Appleton’s Newberry Trail follows the Fox River, its navigational canal locks and an active rail line at different points during its scenic trek. The area was once an industrial hub, but mature trees...
|
WI |
2.4 mi |
Asphalt
|
|
|
As of summer 2015, the Newton Blackmour State Trail is now complete, running 20 miles in eastern Wisconsin from the outskirts of New London to Seymour, roughly paralleling State Highway 54. Along the...
|
WI |
20.6 mi |
Crushed Stone
|
|
|
The Nicolet State Trail runs for 90 miles through three counties, numerous small communities and Nicolet National Forest in northeastern Wisconsin. Following a former railroad route used by the timber...
|
WI |
90.1 mi |
Cinder, Crushed Stone, Gravel
|
|
|
The Northwestern Trail begins near the public library in downtown Ripon, a charming small town in eastern Wisconsin. History buffs may want to head a few blocks south from this endpoint to explore the...
|
WI |
2.8 mi |
Dirt, Grass, Gravel
|
|
|
The Oconto River State Trail offers an 8-mile crushed limestone, level-grade pathway between Stiles Junction and Oconto, which sits on the shores of Lake Michigan. Along the way, you'll enjoy a...
|
WI |
8 mi |
Crushed Stone
|
|
|
The Old Plank Road Trail parallels State Route 23—a road originally built out of wooden planks in the 1800s—from the western edge of Sheboygan to the Village of Greenbush. The trail was one of the...
|
WI |
17 mi |
Asphalt
|
|
|
In western Green Bay, the Packerland Drive Trail primarily parallels its namesake roadway, just east of the airport. The paved trail is separated from traffic by a wide grassy median and has open,...
|
WI |
6.9 mi |
Asphalt
|
|
|
The Peebles Trail is a nearly 6-mile pathway, linking Fond du Lac at the southern edge of Lake Winnebago with St. Peter (Taycheedah) to its east. The trail also passes through the unincorporated...
|
WI |
5.6 mi |
Asphalt, Crushed Stone
|
|
|
The Prairie Trail offers a paved route of nearly 7 miles along the eastern boundary of Fond du Lac, a mid-sized city befitting its French name which means “foot of the lake” as it hugs the southern...
|
WI |
6.7 mi |
Asphalt
|
|
|
The Rawley Point Trail is a winding, hard-packed limestone pathway from the harbor town of Two Rivers on the shores of Lake Michigan to Point Beach State Forest. The 6-mile, sometimes hilly, trail...
|
WI |
5.9 mi |
Crushed Stone
|
|
|
The Sheboygan Interurban Trail follows the route of an electric railway that once ran between Milwaukee and Sheboygan from the early 1900s to 1951. The trail begins at Pebble Beach Road on the Ozaukee...
|
WI |
17.7 mi |
Asphalt
|
|
|
The Shoreland 400 Rail Trail opened in 2013 on a former Union Pacific Railroad corridor through the heart of Sheboygan. More than 30% of Sheboygan County’s residents live within a mile of the trail,...
|
WI |
1.85 mi |
Asphalt
|
|
|
Taylor Drive Multi-use Path is a 2.75-mile trail in the heart of Sheboygan, Wisconsin. The trail stretches from Crocker Avenue to Kohler Memorial Drive (SR 23), providing a north-south non-motorized...
|
WI |
2.75 mi |
Asphalt
|
|
|
espite its futuristic name, the Tomorrow River State Trail takes users on a tour of a historic rail-trail through beautiful Portage and Waupaca Counties. Trail users will find a good start at the...
|
WI |
29.2 mi |
Crushed Stone
|
|
|
The West Side Railroad Trail cuts a diagonal 1.5-mile route across Green Bay's western neighborhoods from South Oneida Street to Bond Street. Much of the paved pathway is pleasantly buffered by trees....
|
WI |
1.5 mi |
Concrete
|
|
|
The Wild Goose State Trail is a premier rail-trail, spanning approximately 35 miles in Dodge and Fond du Lac counties. If you are looking for a peaceful and beautiful place to visit, this trail has it...
|
WI |
34.4 mi |
Asphalt, Crushed Stone, Dirt, Grass
|
|
|
Wisconsin’s Wiouwash State Trail is named for the four counties it passes through: Winnebago, Outagamie, Waupaca and Shawano. Currently, 41 miles of the rail-trail are open in two disconnected...
|
WI |
41 mi |
Crushed Stone
|
|