|
Overview
The South River Trail offers a 10.9-mile wooded route along its namesake river, about 15 miles southeast of Atlanta.
About the Route
A disconnected 7.7-mile segment runs east from...
|
GA |
10.9 mi |
Concrete
|
|
|
The East Decatur Greenway offers a pleasant outdoor experience and community connector in the Atlanta metropolitan area. The paved pathway begins across the street from MARTA's Avondale Station and...
|
GA |
1.2 mi |
Concrete
|
|
|
The picturesque Oxford Trail winds along Turkey Creek through the heart of the charming southern town of Oxford. The wooded pathway runs behind the Oxford College campus and offers a kiosk with...
|
GA |
1.2 mi |
Concrete
|
|
|
The first phase of the Proctor Creek Greenway opened in May 2018 and stretches nearly 3 miles in northwestern Atlanta, surrounded by the neighborhoods of Bankhead, Grove Park, Rockdale and West...
|
GA |
2.9 mi |
Concrete
|
|
|
The Southside Trail is a developing project in the ambitious Atlanta BeltLine system, occupying a stretch of former rail corridor to the south of downtown Atlanta. The rail-trail provides a connection...
|
GA |
4.1 mi |
Concrete, Dirt
|
|
|
The Westside Trail offers a tree-lined route in Atlanta, running from University Avenue to Lena Avenue along the former Louisville and Nashville Railroad. It connects the historical neighborhoods of...
|
GA |
5.52 mi |
Concrete
|
|
|
The 10-feet-wide Wildhorse Trail begins at Wild Horse Creek Park at Macedonia Road in Powder Springs and continues south 1.5 miles along Wild Horse and Noses creeks, where it connects with the Silver...
|
GA |
1.5 mi |
Concrete
|
|
|
Although only a half-mile long, the Yellow River Trail is Newton County’s first rail-trail and offers a serene and scenic experience under a lush tree canopy. It opened in December 2015 and is nestled...
|
GA |
0.5 mi |
Concrete
|
|
|
Overview
The result of efforts by the Cumberland Community Improvement District, the Akers Mill Trail is an important connector trail in Atlanta's Cobb County outskirts. The trail is divided into...
|
GA |
2.3 mi |
Asphalt, Concrete
|
|
|
The Cumberland Connector begins at the eastern end of the popular Silver Comet Trail and continues east nearly 5 miles along the southern outskirts of Smyrna in the Atlanta metro region. The trail...
|
GA |
4.8 mi |
Concrete
|
|
|
Conceived in 1996, the Ocmulgee Heritage Trail is the jewel of Macon’s park system. At present, the entire system is over 12 miles long, flanking both sides of the Ocmulgee River through downtown...
|
GA |
12.5 mi |
Boardwalk, Concrete, Crushed Stone, Gravel, Woodchips
|
|
|
Overview
To most Atlanta residents, the Stone Mountain Trail is a short greenway through Freedom Park and Candler Park. In reality, the Stone Mountain Trail is much more: a continuous 25-mile...
|
GA |
25.23 mi |
Asphalt, Concrete
|
|
|
The Confluence Trail winds through the woods where the North and South Forks of Peachtree Creek meet, offering a peaceful retreat from the hustle and bustle of the city.
The trail runs parallel to...
|
GA |
1.5 mi |
Asphalt
|
|
|
Running underneath the I-85/GA-400 overpass, the Creek Walk Connector provides a link between the Confluence Trail, the PATH400 Greenway Trail, and the Cheshire Farm Trail. The paved trail is smooth...
|
GA |
0.4 mi |
Concrete
|
|
|
The East Point PATHÂ is an ongoing project that includes at least 9.6 miles of multi-use trails and greenways, with the potential for developing a total of 25 miles with connections to the Atlanta...
|
GA |
1.4 mi |
Concrete
|
|
|
Harris Greenway Trail is a 5.7 mile greenway that stretches from Tribble Mill Park to Harbins Park. It also features a 760-foot boardwalk, giving trail users a panoramic view of the greenery and...
|
GA |
5.7 mi |
Boardwalk, Concrete
|
|
|
Jesters Creek Trail is a multipurpose recreation path located in Clayton County, Georgia. The trail winds its way through a forested park, cutting a sun-dappled swath through the towering trees. It's...
|
GA |
2.3 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The Nancy Creek Trail provides a route between Murphy Candler Park and Blackburn Park, two popular recreation sites in the Atlanta suburb of Brookhaven. The concrete trail is a mixture of off-road...
|
GA |
2.32 mi |
Concrete
|
|
|
The Northwest BeltLine Connector is part of the Atlanta's developing PATH trail network. Together with the Northside Trail, the connector trail forms a 4-mile route that includes a loop around the...
|
GA |
3 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The Olde Town Conyers Trail is a scenic 4.9-mile pathway that winds through the heart of historic Conyers. The trail provides a delightful mix of natural beauty and urban charm as it passes through...
|
GA |
4.9 mi |
Asphalt, Boardwalk, Concrete
|
|
|
The PATH Parkway is the result of an innovative collaboration between the PATH Foundation, Georgia Institute Technology and the City of Atlanta. The creation of this multimodal corridor involved the...
|
GA |
1.5 mi |
Asphalt, Concrete
|
|
|
The Panola Mountain Greenway is a multiuse, paved trail that winds through the woods for almost 3 miles in Stockbridge. Although the surface of the trail is smooth and wide, the route is somewhat...
|
GA |
2.8 mi |
Boardwalk, Concrete
|
|
|
The Peachtree Parkway Trail may not be much to look at, but this flat asphalt pathway that runs along the side of Peachtree Parkway is one of the best ways to get around the suburban community of...
|
GA |
3.2 mi |
Asphalt, Concrete
|
|
|
The Southwest Connector Trail is part of the Atlanta BeltLine, a 33-mile network of paved trails throughout the city. Although currently disconnected from other segments of the BeltLine, this one-mile...
|
GA |
1.1 mi |
Concrete
|
|
|
The Thread Trail is a network of multiuse trails that connect parks, neighborhoods, and commercial areas within the City of LaGrange. Currently 13 miles of a proposed 29 mile are open for walking,...
|
GA |
13 mi |
Asphalt, Boardwalk, Concrete
|
|
|
Atlanta's first trolleys were developed in 1870s and the many lines were consolidated to form the Georgia Power Company. The Trolley Line Trail represents the first installment of an effort to convert...
|
GA |
1 mi |
Asphalt, Concrete
|
|
|
The West End Trail was the first section to open of the greater 33-mile Atlanta BeltLine network of proposed trails. This 12-foot wide, multi-use path extends from Westview Drive south of I-20, across...
|
GA |
2.3 mi |
Concrete
|
|
|
The Western Gwinnett Bikeway was designated one of the Gwinnett County's Signature Trails as part of the county's ambitious trails master plan, which hopes to link communities across the populous...
|
GA |
6.4 mi |
Asphalt, Concrete
|
|
|
The Westside Connector Trail is crucial to providing access for previously disconnected neighborhoods to the wider BeltLine system. The trail begins on Northside Drive and heads northwest, occupying a...
|
GA |
1.7 mi |
Concrete
|
|