Find the top rated running trails in Rensselaer, whether you're looking for an easy short running trail or a long running trail, you'll find what you're looking for. Click on a running trail below to find trail descriptions, trail maps, photos, and reviews.
They started paving last fall. From County line rd heading West there is about 2-3 miles paved to Lake Shore County rd.
Straight flat the mile markers are off by 1.5 miles. The pavement is not smooth enough to skate on with ease. But for biking its fine. 80% friendly people to people of color.
We started in Akron and rode about 18 miles north. Loved it!!!
I rode the Panhandle Pathway from the Kenneth trailhead to Winimac and back. Overall, it is a good trail for those who are wanting to get away from the crowds and do some riding. There is nothing specific to to tell about the trail except that the Tippecanoe River bridge is very well done. The trail is flat and easy to ride. The Winimac trailhead area is nice because there are public restrooms directly adjacent to the trail. Conversely, the Panhandle is experiencing the inevitable problem that comes with time. There are several areas that have tree roots heaving and then cracking the trail surface.
Rode the OST today. Well marked, flat and paved. A few tree roots but not significant. The trail goes through neighborhoods, parks and open land. Shaded most of the way. Overall a good 20 mile RT ride.
On 8/27/24, the National Park Service issued a solicitation for bids to improve the Marquette Trail within its boundaries as part of the overall Marquette Greenway project. Approximately 2.5 miles of the existing trail will become a 10-foot wide asphalt multi-use trail with 2-foot gravel shoulders, and include a new bridge. It looks like completion will be in 2026. Other segments of the Marquette Greenway are complete around Burns Harbor and Michigan City, and more will open by Fall 2024.
We ( recumbent trike & e-bike) headed West from the Kiwanis park. Turned around after 9km as the surface was really tough on the trike. There’s 2 good wheel tracks for bikes, but the trike had to ride partially in the coarse trail ballast. Scenic area with farm views and a huge windmill farm in the distance.
Have always loved this trail. Peaceful ride. Only thing is we just went down it on 7/6/2024. It needs a lot of repairs soon or it isn't going to last long. Sad because we love riding this trail.
This is such a nice trail. Part of it is nice and secluded while other parts are next to the road. It's definitely worth riding.
In April a limestone parking area was added to the east side of Starke County Road 700 East adjacent to the current southeast trailhead. On May 25 a 5K Run and 3K Walk was held beginning a few feet northwest of this location. The starting point for the event is painted on the pavement with the turnarounds for the 5K Run and 3 Walk also painted--for persons training for other competitions and a possible repeat event here in 2025.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!