Find the top rated running trails in Roselawn, whether you're looking for an easy short running trail or a long running trail, you'll find what you're looking for. Click on a running trail below to find trail descriptions, trail maps, photos, and reviews.
They started paving last fall. From County line rd heading West there is about 2-3 miles paved to Lake Shore County rd.
Straight flat the mile markers are off by 1.5 miles. The pavement is not smooth enough to skate on with ease. But for biking its fine. 80% friendly people to people of color.
rode the trail on 11/2/2024 roundtrip from manhattan road (mile 7) to the kankakee river (mile 22) . it was in good shape almost the whole length and without loose gravel anywhere.
We started in Akron and rode about 18 miles north. Loved it!!!
My wife & I rode two days from LaSalle toward Ottawa and from Ottawa to Marseilles on our recumbent etrikes. Had to turn around the first day before getting to Ottawa, as the trail became two narrow paths through the grass that were impassable for the trikes. The second day we had to lift our trikes over a fallen tree. There were no trail workers to be seen anywhere. That part of the trail rarely followed the canal, but instead wound through the woods on a cow path like trail. The 20 miles or so between LaSalle and Marseilles are not suitable for road bikes or recumbent trikes, but instead are only desirable for cross bikes or fat tire bikes preferably with electric assist.
I rode the Panhandle Pathway from the Kenneth trailhead to Winimac and back. Overall, it is a good trail for those who are wanting to get away from the crowds and do some riding. There is nothing specific to to tell about the trail except that the Tippecanoe River bridge is very well done. The trail is flat and easy to ride. The Winimac trailhead area is nice because there are public restrooms directly adjacent to the trail. Conversely, the Panhandle is experiencing the inevitable problem that comes with time. There are several areas that have tree roots heaving and then cracking the trail surface.
Rode the OST today. Well marked, flat and paved. A few tree roots but not significant. The trail goes through neighborhoods, parks and open land. Shaded most of the way. Overall a good 20 mile RT ride.
On 8/27/24, the National Park Service issued a solicitation for bids to improve the Marquette Trail within its boundaries as part of the overall Marquette Greenway project. Approximately 2.5 miles of the existing trail will become a 10-foot wide asphalt multi-use trail with 2-foot gravel shoulders, and include a new bridge. It looks like completion will be in 2026. Other segments of the Marquette Greenway are complete around Burns Harbor and Michigan City, and more will open by Fall 2024.
Better than battling cars to me. We saw tons of wildlife and the living history of the I and M canal! Won’t lie, very tough ride but super cool. Pair it with a visit to Starved Rock State Park and some hiking!!!
I’d read many negative reviews but wanted to do it anyway. I’m so glad I did. For me it’s a one and done trail. It’s a long trail and most of it over grassy and gravelly areas which makes it seem even longer since you can’t really ride that fast. But the grass had been cut and it was better than battling cars to me.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!