Indian Harbour Beach, FL Geocaching Trails and Maps

116 Reviews

Looking for the best Geocaching trails around Indian Harbour Beach?

Find the top rated geocaching trails in Indian Harbour Beach, whether you're looking for an easy short geocaching trail or a long geocaching trail, you'll find what you're looking for. Click on a geocaching trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
7 Results
Activities
Length
Surfaces
Type

East Central Regional Rail Trail

47.6 mi
State: FL
Asphalt, Concrete

Flagler Trail

14 mi
State: FL
Concrete, Dirt, Grass, Gravel, Sand

Historic Jungle Trail

7.8 mi
State: FL
Sand

Little Econ Greenway

8 mi
State: FL
Asphalt

Route A1A Trail

21.8 mi
State: FL
Asphalt

Titusville Multi-Use Trail

1.9 mi
State: FL
Asphalt

Trans-Florida Central Railroad Trail

2 mi
State: FL
Asphalt, Concrete, Gravel
Trail Image Trail Name States Length Surface Rating
When complete, the East Central Regional Rail Trail will extend more than 50 miles between DeBary and Edgewater with another segment to Titusville. The trail will connect urban centers with the...
FL 47.6 mi Asphalt, Concrete
A rail-trail that's a bit wild and off the beaten path, the Flagler Trail runs for around fourteen miles through rural Seminole County, to the northwest of Orlando. Nearly the entirety of the trail is...
FL 14 mi Concrete, Dirt, Grass, Gravel, Sand
The Historic Jungle trail winds for nearly 8 miles along a sandy road through the hammock habitat of Florida's barrier islands north of Vero Beach. The trail—really a road—is on the National Register...
FL 7.8 mi Sand
The Little Econ Greenway trail is just one section of the Orlando area's many fine trails. features riverside recreation, picnicking, wildlife watching, and canoe trails. It also features a canal...
FL 8 mi Asphalt
A short distance inland of Florida's eastern coast, the Route A1A Trail offers a paved pathway of nearly 22 miles through the coastal hamlet of Vero Beach. The trail is also part of the expansive East...
FL 21.8 mi Asphalt
The Titusville Multi-Use Trail, also known as the Wuesthoff Trail, is a short and pleasant paved path located in the southern outskirts of the city of Titusville. The trail runs through Wuesthoff Park...
FL 1.9 mi Asphalt
The Trans-Florida Central Railroad Trail is a 2-mile hiking and biking pathway sitting in a former railroad corridor that once connected Sebastian and Fellsmere. The centerpiece of the trail is the...
FL 2 mi Asphalt, Concrete, Gravel

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 30,000 of trail maps
  • Share your trail photos
  • Save your own favourite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Trails by activity

Recent Trail Reviews

East Central Regional Rail Trail

Nice Bicycle Ride

December, 2018 by ekibredir

It is a nice ride through natural Florida & it’s so beautiful and peaceful, really enjoyable ride.

East Central Regional Rail Trail

Gobblers Lodge Trailhed to Edgewater

November, 2018 by randycroce

We had previously ridden the Spring to Spring Trail, which we highly recommend, and hoped that it would be connected to this trail, however, that is not the case,,,,, yet. We opted to take to this trail at the northern most spot which was at Gobblers Lodge, which had great parking and an outhouse. We found the path to be in excellent condition, with occasional rest stops with benches and refuse cans, however, not much shade, so wear your sun block. At the 6.5 mile mark of our ride, we came to the split, where you would either opt for Edgewater to the left, or Titusville to the right. We took the left fork and continued on. Although it was a beautiful Sunday, there were not many riders out, but this part of the trail is not near anything, or any homes or businesses. Just a trail through the natural beauty of Central Florida. We reached Rt I95 at the 10 mile mark, and drove under it, As we neared Edgewater, we came across a pedestrian bridge, which took a little effort to cross, but you can avoid it and cross the road instead with little problems due to low traffic flow. We continued on until we reached the end of the trail in Edgewater and took the sidewalks for an additional mile in order to reach the Indian River, where we had lunch. On our return ride, we stopped at a local deli for some awesome sandwiches, which we saved for later along the trail. We saw some wildlife during our ride, which included an Eagle, Pelicans, a beautiful blue heron in flight, a huge turtle, 1 snake on the path, and an armadillo. We finally reached our van after our 48 mile ride, which was allot longer than I had planned for today, but I hate to stop and turn around before reaching some kind of destination, which usually involves a body of water. LOL. We had a great time, and plan to return in order to head toward Titusville, which appears to be a longer ride. We will most likely pick up the trail at the parking lot just after the split on the trail for this ride. Thank you for all those responsible for these wonderful trails.

Trans-Florida Central Railroad Trail

Update: West to Fellsmere

November, 2018 by bobwise32952_tl

I heard from a friend that the trail was now open all the way to Fellsmere, so went to check it out. The gate into the St. Sebastian River Preserve had been modified to leave an opening for pedestrians and bicycles. West of the gate, the trail was a bumpy dirt track, mostly hard packed and grassy. As I approached a wider cross track marked Red Trail, it had long patches of soft white sand. From the crossing, I could see long patches of white all the way to the vanishing point, so I turned back- too soft for my hybrid bike. It might be OK for a mountain bike or beach cruiser.

Going back east, I followed the trail to its junction with the Sebastian Greenway at the county highway 512 and continued into Sebastian, a stretch I had not ridden before. The Greenway was just wide sidewalk for a mile or so, then was set back from the highway behind a belt of tall cedars, set close like a hedge; it continued like this all the way to the FEC tracks beside US 1. Apparently the cedars were planted on the original railroad grade, up to two feet above the level of the trail. They screen the trail from traffic noise and provide a lot of shade early in the day. There are several street crossings, but the busier ones have traffic signals and walk lights.

Accordion

Little Econ Greenway

Fantastic running path

November, 2018 by dcgcooke

Training for a marathon. There are water fountains and bathrooms all along the path. It is scenic, few over the road crossings. As a lone woman runner, it is relatively safe as it is well used, plenty of people around, few areas of isolation.

Trans-Florida Central Railroad Trail

New Trail with Potential

October, 2018 by bobwise32952_tl

Trans-Florida Central Railroad Trail: So read the lettering on a new pedestrian overpass spanning I-95. I'd never heard of it, and couldn't find it on the internet, so I decided to drive down and check it out.

I started at the Fellsmere Trailhead Preserve, just west of I-95 on highway 512. A young mother was watching her child on the playground as I unloaded my folding bike. Inside the shelter I found restrooms and a wall map of the Regional Greenway, which includes the rail trail (see pictures).

Pedaling around the trailhead, I saw no way to the trail until I came to a hard packed sand roadway leading north from the entry road. A road grader operator confirmed that this was the way to the overpass.

At the trail, packed sand gave way to a hard gravel surface with pinewoods on either side. I turned left, to find the end of the trail at a locked gate. Here the old railbed led straight west, through the woods of the St. Sebastian River Preserve State Park towards Fellsmere.

Turning around, I pedaled a half mile eastward to the paved section, twelve feet wide, beginning at the approach to the overpass. Out to the left were several structures of the FIT Challenge Course: horizontal rope nets, wooden walls to scale- challenges I might have tried half a century ago.

Descending the overpass, the trail turned a few degrees south of east and ran board-straight between stands of tall pine to the vanishing point. Not much shade; a summer afternoon sun would shine straight down the trail, and this morning there were only a few patches of broken shade.

It was busy on this Saturday morning- two couples walking abreast, pushing a tandem stroller; two young girls walking a huge, furry poodle-ish dog; other couples and individuals pedaling or strolling. The mile and a half of pavement led to North County Regional Park and its large, well attended swimming pool. I could hear shouts and splashes as I passed. A trailhead shelter here was closed.

From the pavement's end, a nicely wooded mile of gravel trail meandered through thick woods, over several boardwalks across the wetter places and through an oak hammock with some magnificent trees. I passed a young lady jogger, then a fast moving male cyclist, who confirmed that the trail ran on into Sebastian.

It popped out of the woods at a bridge over an arm of the St. Sebastian River, where it joined a wide sidewalk on highway 512, continuing the Regional Greenway northeast into town. I didn't have time to ride it, but looked it over by car- a true greenway. More than half its length was set back from the roadway and screened by tall, thick rows of cedar. Some of these sections adjoined neighborhood streets. A number of walkers and cyclists were using it.

Four miles of greenway led from the end of the rail trail to the downtown Sebastian waterfront, at US 1, which boasted a mile of wide bike lanes. A block east, Indian River Drive followed the shore of the Indian River Lagoon, with a half dozen seafood restaurants overlooking the water.

Starting at US 1, a rider could go about six and a half miles to the east end of the existing rail trail. Plans call for the rail trail to extend about three miles further west, into downtown Fellsmere.

Fellsmere has two very authentic Mexican restaurants, one including a bakery, plus a local pizza parlor. Southern comfort food is on offer at the century-old Fellsmere Estates Building, in a small historic district along Broadway St. The town has the oldest operating library in the county, and was the first town in the south where a woman voted in a municipal election.

Despite its imposing name, the Trans-Florida Central Railroad was never more than a feeder for the main rail line along the east coast. It reached about fifteen miles inland, to the St. Johns marshes and the former town of Broadmoor, planned for development but abandoned after a hurricane flooded the area in 1916.

The rails brought lumber and building materials inland to Fellsmere, carrying out whatever products were harvested from the marshy land over the decades- sugar, citrus, potatoes, muck for fertilizer, pulpwood. Early in the last century, passenger service ran four times a day between Fellsmere and Sebastian.

This short rail line buoyed the region's economy for half a century. Its legacy is a pleasant greenway, well used by locals and worth a visit for anyone seeking a leisurely ride.

East Central Regional Rail Trail

Osteen to Green Springs

June, 2018 by cwright402

We packed lunch and headed-out to the Osteen Community Center on Hwy 415. Parking and restrooms are excellent. We went west over the pedestrian/bicycle bridge and rode approx 6 miles to Green Springs. Easy ride with about half of the trail covered by a canopy of tree limbs. We visited the Springs and then had lunch at a park bench by the boat ramp over-looking Lake Monroe. We then rode the 6-miles back. A very easy-going enjoyable 12-mile ride. I will return to do the complete ride on the east section of Osteen and then turning back west and ride past Green Springs on the one-way 12-mile ride at a higher rate of speed. Must be a great kept secret as there were only a few people out on a Saturday!
Thank you for the trail.

East Central Regional Rail Trail

Great Trail

April, 2018 by dbooth1917

We parked at Thornby Park, Restrooms and water. There were several parking areas also nearby and all marked nicely. We headed east and weren't sure how far the trail went. Some maps I looked at showed all the way to Titusville. It actually ends 8 miles. Five miles in there is a great diner (recommended by another reviewer), Osteen's Diner is a great stop to take a break and grab a bite to eat. This is a beautiful 8 mile, tree shaded trail with lots to see. Head west and you're on the Spring to Spring trail for an additional 8 miles. We'll possibly do that trail another day.
Lake Monroe is around the corner from where we parked, beautiful view.

Route A1A Trail

Great for training

March, 2018 by dongrant18

We came to Florida from the north to get in some riding at the start of spring. This route is perfect. It is 22 miles from end to end but you could continue. Wide shoulder, courteous drivers and lots of beaches to stop at.

Tips: 1) do not take the Jungle Trail - it is sand, has no view and is frustrating; 2) you can eat in San Sebastian Inlet State Park and though it is $2 to get in, it is worth it; 3) if you come from the South cut in at the 7 Eleven at Sea Gull Dr. and go into the beach part of Vero Beach as it is great back there, lots of shops, foods and a market on Saturdays; 4) Spend some time in Round Island Beach park as you can see manatees and go to the ocean for a swim on the other side.

This ride really made our trip and was a nice compliment to General Van Fleet and others that are totally segregated. Highly recommended.

Historic Jungle Trail

Do not use this trail

March, 2018 by dongrant18

Perhaps I should have read the reviews more closely. We were on cross bikes with 28 mm tires and we started at the north end. All sand until we got off and rejoined the A1A trail. Very hard to ride even though we ride cottage roads up north with the same style of bike. Too much soft sand.

The biggest disappointment is that there is nothing to see. No cut outs so you can see the reserve, no easy access benches or tables or wooden walkways. No animals and then the brutal part where you have million dollar houses on either side with a thin row of jungle in between.

East Central Regional Rail Trail

Hunting area

March, 2018 by flastorm32

Just a caution that much of this trail goes, or will go, thru areas popular with hunters, in season.

East Central Regional Rail Trail

Titusville to Edgewater

March, 2018 by overfecd

Rode from Titusville to Edgewater, 33 miles of bicycle trail. The only impediment is a bridge under construction along Maytown Rd and it looks close to completion.

East Central Regional Rail Trail

East Central Rail Trail from Titusville to Maytown Rd

February, 2018 by overfecd

Now at 18 miles in length this path is beautiful and gets better as you travel north. The last 9 miles, north of Aurantia Rd does not have any intersections.

Find Nearby City trails

Accordion

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews
OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!
OR