|
The Russell Street to Patterson Street Trail links the two roads via a former railroad corridor in Tecumseh. Located in a residential area nearly equidistant between downtown Tecumseh to the north and...
|
MI |
0.4 mi |
Asphalt
|
|
|
Despite being less than a mile long, the Southwest Greenway provides important community connections to the riverfront and several city parks. Located in southwest Detroit, the greenway follows a...
|
MI |
0.67 mi |
Concrete
|
|
|
With 4,461 acres of prime recreational lands, this top-rated Stony Creek Metropark's scenic, hilly terrain surrounds beautiful 500-acre Stony Creek Lake. Park features include a nature center, a...
|
MI |
8 mi |
Asphalt
|
|
|
The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...
|
OH |
6.3 mi |
Asphalt
|
|
|
Overview
The Wabash Cannonball Trail is a 64.1-mile multiuse trail in northwest Ohio. Running along a former railroad, the rail-trail surface is a mix of paved asphalt and hard packed cinder...
|
OH |
64.1 mi |
Asphalt, Ballast, Cinder, Crushed Stone
|
|
|
You won’t find this trail’s name on the ground: the continuous stretch is actually made up of the scenic trails within Oakwoods Metropark, Willow Metropark and Lower Huron Metropark, as well as a...
|
MI |
16.3 mi |
Asphalt
|
|
|
Overview
The Border-to-Border Trail is a work in progress, which when complete, will stretch across Washtenaw County from its border with Livingston County in the northwest to Wayne County in the...
|
MI |
33.13 mi |
Asphalt, Boardwalk, Crushed Stone
|
|
|
The Clinton River Spillway Trail passes through a mostly wooded corridor above and parallel to the spillway between Velger Boat Harbor on Lake St. Clair and Shady Side Park in Mt. Clemens. At the east...
|
MI |
2 mi |
Asphalt
|
|
|
The Flat Rock Pathway is a paved asphalt path in the small, industrial community of Flat Rock, located on the banks of the Huron River not far from where it empties into Lake Erie. Part of the...
|
MI |
3.5 mi |
Asphalt
|
|
|
The Genesse Road Trail sits on the western side of Genessee Road in Grand Blanc. The neighborhood trail extends for just over 3/4-mile, from Perry Road in the South to Kings Fairway Lane at the north...
|
MI |
0.8 mi |
Asphalt
|
|
|
This is a dedicated sidepath in Grand Blanc that is suitable for a casual stroll, a quick jog or an easy ride. The trail sits on the north side of Grand Blanc Road, through mainly residential...
|
MI |
1.6 mi |
Asphalt
|
|
|
Overview
Paved and mostly flat, the 13.5-mile Huron Valley Trail links several suburban communities, parks, and a large recreation area while providing connections to a growing network of...
|
MI |
13.5 mi |
Asphalt
|
|
|
Overview
The I-275 Metro Trail began back in the 1970s as the Michigan Department of Transportation's response to the then-fuel crisis. The original trail linked Wayne, Oakland, and Monroe counties...
|
MI |
31.7 mi |
Asphalt
|
|
|
The Island Lake Pathway runs east–west through the densely-wooded landscape of the Island Lake Recreation Area southeast of Brighton. Although relatively short, the paved trail may prove a challenge...
|
MI |
4.3 mi |
Asphalt
|
|
|
The Island Lake Connector Trail allows cyclists, pedestrians, and other residents of Green Oak Township to connect to the Island Lake Recreation Area. The trail sits on a converted railroad bed, and...
|
MI |
0.8 mi |
Crushed Stone
|
|
|
The Lansing River Trail traces the course of three waterways for more than 25 miles across Michigan’s capital city. Visiting all four main points of the compass in Lansing, the trail provides a route...
|
MI |
25.3 mi |
Asphalt
|
|
|
Lohr-Textile Greenway is an asphalt sidepath stretching more than 4 miles. The path has two segments—one north-south along Lohr Road between West Ellsworth and Textile Roads. The segment continues...
|
MI |
4.2 mi |
Asphalt, Boardwalk
|
|
|
Overview
The entirely paved MSU to Lake Lansing Trail extends all the way from the eastern edge of MSU's campus to Haslett and Lake Lansing. The 4.6-mile trail provides a nice neighborhood...
|
MI |
4.7 mi |
Asphalt, Boardwalk
|
|
|
The Martin Luther King Equality Trail, formerly called the Jackson Intercity Trail, follows the old rail bed of what was once the Michigan Central Railroad for 4.5 miles north through the southwest...
|
MI |
4.3 mi |
Asphalt
|
|
|
The Metro Parkway Trail—also known as the Freedom Trail—parallels the busy Metropolitan Parkway (16 Mile Road) through urban Macomb County. You'll find many street crossings throughout a mix of...
|
MI |
10.7 mi |
Asphalt, Concrete
|
|
|
The Wabash Cannonball Trail Connector is a short, but valuable, paved route on the west end of Maumee that connects historical attractions, a popular park, and a rail-trail that spans more than 60...
|
OH |
1.6 mi |
Asphalt
|
|
|
The Baw Beese Trail, named in honor of a former chief of the local Potawatomi population, connects the Michigan communities of Hillsdale and Jonesville. The paved trail is a model of efficient land...
|
MI |
10.9 mi |
Asphalt
|
|
|
The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...
|
OH |
11 mi |
Asphalt, Crushed Stone
|
|
|
The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...
|
OH |
2.36 mi |
Asphalt
|
|
|
Planners in Jackson Michigan had originally wanted to build a rail with trail, but when they face resistance from the local railroad, they took a different route, one which gave us the Grand River...
|
MI |
1.2 mi |
Asphalt
|
|
|
Overview
The Manchester Bike Trail is a 1.3-mile rail-trail that runs through the Village of Manchester, between the Village's western border by Leonard Preserve and its eastern border, just east...
|
MI |
1.3 mi |
Asphalt, Grass, Gravel
|
|
|
The Metro Connector Trail works as its name suggests, closing the gap between two local favorites in Novi: the M-5 Metro Trail and the I-275 Metro Trail. The trail begins on 13 Mile Road and then...
|
MI |
2.5 mi |
Asphalt
|
|
|
The Platt Road Trail is located on the east side of Platt Road and connects users to Lillie Park, where they can relax by the pond, picnic in a pavilion or take a stroll along its woodchip and...
|
MI |
2.25 mi |
Asphalt
|
|
|
Closure Notice:Â The South Lyon Trail is closed as of Dec 1st between the Huron Valley Trail and Princeton Dr. for a construction project.
Overview
The South Lyon Trail runs through South Lyon,...
|
MI |
2.3 mi |
Asphalt, Concrete
|
|