|
Although short, the Bayshore Trail provides an important connection between two popular trails on Florida's west coast: the Courtney Campbell Trail and the Ream Wilson Trail.
The paved north-south...
|
FL |
0.9 mi |
Asphalt
|
|
|
Overview
The Clearwater Memorial Causeway Trail is a paved 3.5-mile trail that connects Clearwater Beach and downtown Clearwater.
About the Route
From its eastern end in Clearwater, the trail...
|
FL |
3.5 mi |
Asphalt
|
|
|
Overview
The Coastal Anclote Trail is a 4.5-mile multi-use path in southeast Pasco County, Florida. The paved trail includes one longer route and three spurs that connect trail users to local...
|
FL |
4.5 mi |
Asphalt, Boardwalk
|
|
|
Closure Notice: The Courtney Campbell Trail is closed indefinitely due to damages from Hurricane Helene.
Overview
The Courtney Campbell Trail provides pedestrian and bicycle access along the...
|
FL |
10.9 mi |
Asphalt, Concrete
|
|
|
The Druid Road Trail is a vital link in Pinellas County’s extensive trail system, connecting two of its most prominent trails: the Pinellas Trail, which stretches for 50 miles from St. Petersburg to...
|
FL |
4 mi |
Asphalt
|
|
|
OverviewÂ
The Flatwoods Park Trail is located within a park of the same name. This multi-purpose route is a ten-mile paved loop that provides a pleasant, wooded experience with abundant wildlife...
|
FL |
10 mi |
Asphalt
|
|
|
Overview
The Fort Desoto Island Park Trail is a paved path running the entirety of the offshore key for 6.6 miles.
About the Route
Lying southwest of St. Petersburg, visitors to the Fort...
|
FL |
6.6 mi |
Asphalt, Concrete
|
|
|
Overview
One of Florida's most popular and unique urban pathways, the Fred Marquis Pinellas Trail curves northwest from St. Petersburg and the stretches to form a rough "C" shape before ending in...
|
FL |
46 mi |
Asphalt, Concrete
|
|
|
Overview Â
The Legacy Trail runs for 23.2 miles through coastal communities between Venice and Sarasota, Florida. Through wetlands and coastal forests, the trail’s interpretive signs point out...
|
FL |
23.2 mi |
Asphalt
|
|
|
As part of Nathan Benderson Park, this 3.4-mile paved trail loops around the park's competition lake. The trail is a popular place for running, biking, rollerblading/skating, walking, and more....
|
FL |
3.4 mi |
Asphalt, Crushed Stone
|
|
|
Overview
The North Bay Trail runs 6.3 miles through St. Petersburg, FL. The multiuse trail is paved, smooth and varies from 12-to-15 feet wide depending on the section of trail.Â
About the...
|
FL |
6.3 mi |
Asphalt, Concrete
|
|
|
Whether you are commuting to work and school or going for a family bike ride, this trail has it all. The Pinellas Trail Loop will be a 75-mile loop running throughout the county and is currently...
|
FL |
68 mi |
Asphalt
|
|
|
Overview
The Ream Wilson Clearwater Trail is a four-mile trail that runs through Safety Harbor, Florida. There are frequent amenities along the route including drinking fountains and...
|
FL |
4.4 mi |
Asphalt, Concrete
|
|
|
If you are looking for a picturesque stroll or a tranquil ride through nature close to an urban setting, then consider St. Petersburg’s Skyway Trail. The trail showcases the best of Clam Bayou’s...
|
FL |
4.6 mi |
Asphalt, Boardwalk
|
|
|
Part of Florida's Coast-to-Coast Trail, the Starkey Gap Trail is a broad paved trail traveling within the Duke Energy powerline corridor. Paved with asphalt, the trail is 12-feet-wide.Â
Stretching...
|
FL |
2.4 mi |
Asphalt
|
|
|
The paved trail in Jay B. Starkey Wilderness Park stretches across the preserve for about 6 miles. Well-spaced shelters along the trail offer pleasant places to rest in the shade; many are even...
|
FL |
5.8 mi |
Asphalt
|
|
|
Overview
The Suncoast Trail parallels the Suncoast Parkway for 54.1 miles through Hillsborough, Pasco, Hernando, and Citrus counties.
About the Route
For its entire route, the Suncoast Trail...
|
FL |
54.1 mi |
Asphalt
|
|
|
The Tangerine Greenway follows a former trolley line that once ran between St. Petersburg and Gulfport on Florida's west coast. The paved pathway begins at Gulfport's Tomlinson Park and heads east in...
|
FL |
0.4 mi |
Concrete
|
|
|
Closure Notice:Â The Rocky Creek Bridge is closed for reconstruction. Both north and south of the bridge are open to trail use. The closure is expected to last until 2025. Please check with...
|
FL |
13.85 mi |
Asphalt
|
|
|
Overview
The Venetian Waterway Park Trail follows along both sides of the Intracoastal Waterway for 9.2 miles, from the ocean north and somewhat east, past the Venice Airport to north of Venice...
|
FL |
9.2 mi |
Concrete, Grass
|
|