|
An extension of the paved paths that connect the Oakwoods, Willow, and Lower Huron Metroparks, the Oakwoods Metropark to Flat Rock Trail allows you to continue your trail experience into the small...
|
MI |
2 mi |
Asphalt
|
|
|
Overview
Even though the Paint Creek Trail is Michigan’s oldest nonmotorized rail-trail, the occasional face-lifts and renovations keep it looking as young as ever. Established in 1983, the...
|
MI |
8.9 mi |
Crushed Stone
|
|
|
Also known as the Amber's Heart Orion Township Connector Trail, this paved trail provides an important link between the Polly Ann Trail and the Paint Creek Trail (MI). Following Clarkson Road for the...
|
MI |
3.1 mi |
Asphalt, Concrete
|
|
|
The Russell Street to Patterson Street Trail links the two roads via a former railroad corridor in Tecumseh. Located in a residential area nearly equidistant between downtown Tecumseh to the north and...
|
MI |
0.4 mi |
Asphalt
|
|
|
Despite being less than a mile long, the Southwest Greenway provides important community connections to the riverfront and several city parks. Located in southwest Detroit, the greenway follows a...
|
MI |
0.67 mi |
Concrete
|
|
|
With 4,461 acres of prime recreational lands, this top-rated park's scenic, hilly terrain surrounds beautiful 500-acre Stony Creek Lake. Park features include a nature center, a hike-bike trail,...
|
MI |
6.2 mi |
Asphalt
|
|
|
A paved path, suitable for walking and cycling, the Trenton Walking Path follows the small but tranquil Frank and Poet Creek through a series of parks and green space that cuts right through the heart...
|
MI |
2 mi |
Asphalt
|
|
|
The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...
|
OH |
6.3 mi |
Asphalt
|
|
|
You won’t find this trail’s name on the ground: the continuous stretch is actually made up of the scenic trails within Oakwoods Metropark, Willow Metropark and Lower Huron Metropark, as well as a...
|
MI |
16.3 mi |
Asphalt
|
|
|
Overview
The West Bloomfield Trail sails along for nearly 7 miles through a municipality that claims to be one of the wettest in the nation—not from rainfall but from the sheer number of lakes...
|
MI |
6.8 mi |
Crushed Stone
|
|
|
Overview
The Border-to-Border Trail is a work in progress, which when complete, will stretch across Washtenaw County from its border with Livingston County in the northwest to Wayne County in the...
|
MI |
33.13 mi |
Asphalt, Boardwalk, Crushed Stone
|
|
|
The Bridge to Bay Trail is a diverse trail system of boardwalks, river walks, rail trails and bike paths that extends along 50+ miles of shoreline across St Clair County, Michigan. Heading north, the...
|
MI |
42.17 mi |
Asphalt
|
|
|
The Clinton River Spillway Trail passes through a mostly wooded corridor above and parallel to the spillway between Velger Boat Harbor on Lake St. Clair and Shady Side Park in Mt. Clemens. At the east...
|
MI |
2 mi |
Asphalt
|
|
|
The Clinton River Trail is a 16-mile recreational trail on an abandoned rail line through the heart of Oakland County, including the cities of Sylvan Lake, Pontiac, Auburn Hills, Rochester Hills and...
|
MI |
16 mi |
Asphalt, Crushed Stone
|
|
|
This is a dedicated sidepath in Grand Blanc that is suitable for a casual stroll, a quick jog or an easy ride. The trail sits on the north side of Grand Blanc Road, through mainly residential...
|
MI |
1.6 mi |
Asphalt
|
|
|
The Grosse Ile Trail is a smooth, paved route running nearly the entire north–south length of Grosse Ile, which rests in the Detroit River between mainland Michigan and Ontario, Canada. The trail...
|
MI |
6.2 mi |
Asphalt
|
|
|
Overview
Paved and mostly flat, the 13.5-mile Huron Valley Trail links several suburban communities, parks, and a large recreation area while providing connections to a growing network of...
|
MI |
13.5 mi |
Asphalt
|
|
|
The I-275 Metro Trail began back in the 1970s as the Michigan Department of Transportation's response to the then-fuel crisis. The original trail linked Wayne, Oakland and Monroe counties along a...
|
MI |
31.7 mi |
Asphalt
|
|
|
The Island Lake Pathway runs east–west through the densely-wooded landscape of the Island Lake Recreation Area southeast of Brighton. Although relatively short, the paved trail may prove a challenge...
|
MI |
4.3 mi |
Asphalt
|
|
|
The Lakes Community Trail is a multi-use pathway in southwest Oakland County. The walking-and-biking path stretches four miles and links to parks within four adjacent communities; the City of Wixom,...
|
MI |
4.4 mi |
Asphalt, Boardwalk
|
|
|
Lohr-Textile Greenway is an asphalt sidepath stretching more than 4 miles. The path has two segments—one north-south along Lohr Road between West Ellsworth and Textile Roads. The segment continues...
|
MI |
4.2 mi |
Asphalt, Boardwalk
|
|
|
The M-5 Metro Trail runs for 2 miles between Commerce Township and the city of Novi in southeastern Michigan. The paved trail parallels the west side of its namesake roadway (also known as the...
|
MI |
2.2 mi |
Asphalt
|
|
|
The Metro Parkway Trail—also known as the Freedom Trail—parallels the busy Metropolitan Parkway (16 Mile Road) through urban Macomb County. You'll find many street crossings throughout a mix of...
|
MI |
10.7 mi |
Asphalt, Concrete
|
|
|
Overview
The Polly Ann Trail is a 36.7-mile long, non-motorized trail extending north from suburban Detroit on a former Pontiac, Oxford & Northern Railroad corridor. The trail is managed separately...
|
MI |
36.7 mi |
Asphalt, Ballast, Crushed Stone
|
|
|
The Sylvania River Trail follows the Ottawa River as it flows through the heart of town. The trail is a pathway for residents to get closer to the river and enjoy nature's scenic beauty just steps...
|
OH |
1.5 mi |
Asphalt, Concrete
|
|
|
The Chelsea Community Wellness Path weaves through a large campus home to many of Chelsea’s amenities. Although the total length of the trail is less than 2 miles, it is divided into three separate...
|
MI |
1.5 mi |
Asphalt, Woodchips
|
|
|
The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...
|
OH |
11 mi |
Asphalt, Crushed Stone
|
|
|
The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...
|
OH |
2.36 mi |
Asphalt
|
|
|
The Flat Rock Pathway is a paved asphalt path in the small, industrial community of Flat Rock, located on the banks of the Huron River not far from where it empties into Lake Erie. Part of the...
|
MI |
3.5 mi |
Asphalt
|
|
|
The Metro Connector Trail works as its name suggests, closing the gap between two local favorites in Novi: the M-5 Metro Trail and the I-275 Metro Trail. The trail begins on 13 Mile Road and then...
|
MI |
2.5 mi |
Asphalt
|
|
|
The Platt Road Trail is located on the east side of Platt Road and connects users to Lillie Park, where they can relax by the pond, picnic in a pavilion or take a stroll along its woodchip and...
|
MI |
2.25 mi |
Asphalt
|
|
|
The new Riverbend Preserve in southern Washtenaw County features 58 acres of wetlands on both sides of the Raisin River. The area is a common resting place for migratory birds on their trek across the...
|
MI |
0.1 mi |
Dirt
|
|
|
Located atop Interstate 696 as it cuts through the Detroit suburbs of Oak Park and Southfield are the three parks. Back in the 1980s, the Orthodox Jewish community opposed the construction of this...
|
MI |
2.5 mi |
Asphalt, Concrete
|
|
|
Running from the city of Monroe's popular Munson Park, through the city's charming historic downtown, and out to Sterling State Park - one of the most-frequented of Michigan's state parks - the River...
|
MI |
7.5 mi |
Asphalt, Concrete
|
|
|
Providing nearly two and a half miles of paved trail through a mixture of suburban and industrial land, the Brownstown Township Trail may not be much of a destination trail, but it is a great resource...
|
MI |
2.4 mi |
Asphalt
|
|
|
This unassuming recreational path in Goodrich, Genesee County is actually a part of the Iron Belle Trail, Michigan's state-spanning multiuse trail system. The Gale Road Trail starts near Perry Road...
|
MI |
2.3 mi |
Asphalt
|
|
|
The Genesse Road Trail sits on the western side of Genessee Road in Grand Blanc. The neighborhood trail extends for just over 3/4-mile, from Perry Road in the South to Kings Fairway Lane at the north...
|
MI |
0.8 mi |
Asphalt
|
|
|
Jewett Trail is both the name of the road, as well as the off-street bike-ped path, circling the Grand Blanc Community High School complex. The pathway, which sits on the southern edge of the trail,...
|
MI |
1 mi |
Asphalt
|
|
|
A shared-use path parallels Michigan Avenue between Warner Road and Platt Road. The path connects to local government offices, the Pittsfield Township Farmer's Market as well as Prairie Park. It also...
|
MI |
1.1 mi |
Asphalt
|
|
|
Stretching from the small riverside community of Rockwood to the East-West Connector Trail north of the city, the Rockwood Pathway provides a great way for cyclists and pedestrians to get around town...
|
MI |
1.6 mi |
Asphalt
|
|