|
Lying largely within the Marjorie Harris Carr Cross Florida Greenway, this trail begins just off Bridge Rd by a trail kiosk with a map of the route. This paved path passes through 2.5 miles of cypress...
|
FL |
2.5 mi |
Asphalt
|
|
|
OverviewÂ
The Flatwoods Park Trail is located within a park of the same name. This multi-purpose route is a ten-mile paved loop that provides a pleasant, wooded experience with abundant wildlife...
|
FL |
10 mi |
Asphalt
|
|
|
Overview
One of Florida's most popular and unique urban pathways, the Fred Marquis Pinellas Trail curves northwest from St. Petersburg and the stretches to form a rough "C" shape before ending in...
|
FL |
46 mi |
Asphalt, Concrete
|
|
|
OverviewÂ
The General James A. Van Fleet State Trail runs for 29 miles between Mabel and Polk City through some of Florida’s most scenic rural landscapes. At least one-third of the trail passes...
|
FL |
29 mi |
Asphalt
|
|
|
OverviewÂ
The Good Neighbor Trail runs for 10 miles between Brooksville and Withlacoochee State Forest, following the former Florida Southern Railroad Line. The paved path offers a scenic,...
|
FL |
10.4 mi |
Asphalt
|
|
|
The Hancock Trail is 6.5 miles of smooth as ice, undulating multi-purpose trail in Lake County, Florida. It’s wide - a good 14 ft - and the hilly topography can either be a moderate challenge or a...
|
FL |
6.5 mi |
Asphalt
|
|
|
The Hardy Trail is a mile long walk or ride in the heart of Dade City. The trail sits on a converted railbed, and travels south from Church Avenue. Residents love using the trail to run or jog or walk...
|
FL |
0.9 mi |
Asphalt
|
|
|
Overview
The Lake Apopka Loop Trail is 18.4-miles. There’s an abundance of nature as well as some background history regarding the lake. Spanning across former farmland along the north shore,...
|
FL |
18.4 mi |
Crushed Stone, Gravel
|
|
|
The Marjorie Harris Carr Cross-Florida Greenway is on a mission to create a non-motorized conduit stretching 110 miles from the Gulf of Mexico to St. John’s River in Palatka. The corridor showcases...
|
FL |
15.6 mi |
Asphalt
|
|
|
Whether you are commuting to work and school or going for a family bike ride, this trail has it all. The Pinellas Trail Loop will be a 75-mile loop running throughout the county and is currently...
|
FL |
72.3 mi |
Asphalt
|
|
|
Overview
Running along the former line of the Orange Belt Railway, the Seminole-Wekiva Trail offers a peaceful alternative to the busy streets of Altamonte Springs. This popular, well-marked,...
|
FL |
26.5 mi |
Asphalt, Concrete
|
|
|
The Seven Mile Loop Trail is located in the Crystal River Preserve State Park (3266 N Sailboat Ave, Crystal River). Winding through Florida's diverse coastal habitats, the route crosses three...
|
FL |
7 mi |
Dirt, Grass
|
|
|
Overview
About 20 miles west of Orlando, the South Lake Trail (also known as Lake Minneola Scenic Trail) takes in some of central Florida's most spectacular prospects. Nowhere in this region will...
|
FL |
15.5 mi |
Asphalt
|
|
|
Part of Florida's Coast-to-Coast Trail, the Starkey Gap Trail is a broad paved trail traveling within the Duke Energy powerline corridor. Paved with asphalt, the trail is 12-feet-wide.Â
Stretching...
|
FL |
2.4 mi |
Asphalt
|
|
|
The paved trail in Jay B. Starkey Wilderness Park stretches across the preserve for about 6 miles. Well-spaced shelters along the trail offer pleasant places to rest in the shade; many are even...
|
FL |
5.8 mi |
Asphalt
|
|
|
Overview
The Suncoast Trail parallels the Suncoast Parkway for 54.1 miles through Hillsborough, Pasco, Hernando, and Citrus counties.
About the Route
For its entire route, the Suncoast Trail...
|
FL |
54.1 mi |
Asphalt
|
|
|
Closure Notice:Â The Rocky Creek Bridge is closed for reconstruction. Both north and south of the bridge are open to trail use. The closure is expected to last until 2025. Please check with...
|
FL |
13.85 mi |
Asphalt
|
|
|
Overview
Connecting small communities and suburban neighborhoods, the 22-mile West Orange Trail is one of Florida's most popular rail-trails, thanks to its reputation and proximity to metro...
|
FL |
22.4 mi |
Asphalt, Concrete, Dirt, Woodchips
|
|
|
The Withlacoochee Bay Trail extends from the Gulf, north of Crystal River and south of Inglis, nearly 5 miles east to just beyond North Suncoast Boulevard. The trail provides access to a 758-acre...
|
FL |
6.2 mi |
Asphalt
|
|
|
Closure notice: Starting August 2024, a resurfacing project is underway along portions of the Withlacoochee State Trail. Sections of the trail will temporarily close when necessary. Please follow all...
|
FL |
45.9 mi |
Asphalt, Boardwalk, Concrete
|
|