Richmond Heights, OH Atv Trails and Maps

385 Reviews

Looking for the best Atv trails around Richmond Heights?

Find the top rated atv trails in Richmond Heights, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
0 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 30,000 of trail maps
  • Share your trail photos
  • Save your own favourite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Trails by activity

Recent Trail Reviews

Berlin Lake Trail

A Nice Local Recreational Trail

May, 2019 by orangedoug

This is a nice short rail trail that services this community as another recreational opportunity. I would not call this a destination trail by any means. The surface is crushed limestone except for the concrete surface on the bridge that crosses over a passage in the lake. Most of the time you are surrounded by water on both your left and your right. Riding or walking this trail at dawn or twilight might give you better chances to encounter wildlife. There always seems to be people out on the lake boating or fishing when the weather is good. I did not encounter anyone else on the trail today, but previously I have shared the trail with runners and dog walkers.

Lake Metroparks Greenway Corridor

Short morning jog

May, 2019 by vicki1960

Short Sunday morning jog while traveling in the area. Nicely paved trail. Great for walking, running or biking.

MetroParks Bikeway

April 2019 Newly Constructed Detour

April, 2019 by vicki1960

Though the trail is closed at Kirk Road, there is a short detour which was newly constructed, and it's complete with road barriers.
At Kirk road, they are working on the trail under the Ohio turnpike. The detour takes you about a tenth of a mile West and there is a cement wall between the trail detour and traffic. Go under the turnpike and turn left onto the new asphalt paved temporary trail. Continue another 2/10 of a mile and it re-connects with the trail. This is a very safe detour.
Biked the entire length of this trail (10.6 miles, and back). Also biked on the connecting Niles Bikeway trail.

Accordion

Brecksville Reservation All Purpose Trail

Not a Trail for Those Expecting a Flat Rail Trail

March, 2019 by orangedoug

There are actually two trails here, though, eventually they will probably fall under the name of Brecksville Reservation All Purpose Trail. First there is the Valley Parkway Connector Trail.

The Valley Parkway Connector Trail runs from the eastern edge of Mill Stream Run Reservation to the western edge of Brecksville Reservation. The Valley Parkway Connector Trail was the final and key link in connecting the Westside and Eastside Cleveland Metroparks. It truly connected the "Emerald Necklace" around Cleveland, OH and created about 70 miles of continuous off road trail (which includes approximately a 5 mile connection using the Towpath Trail in Cuyahoga Valley National Park.) This trail parallels the Ohio Turnpike for much of its route. You will pass under the turnpike and over Interstate 77 along the way. For a March Wednesday afternoon ride, the trail was not crowded, but it was moderately trafficked with cyclists and pedestrians. I can imagine that there will be a lot of people using this trail on the weekends particularly as the weather continues to warm up.

The other trail is the Brecksville All Purpose Trail. It is a beautiful tree shaded trail (or at least they will be once the leaves on the trees come out). Traveling east along either the Valley Parkway or Chippewa Creek Drive is easy as you descend into the depths of the Cuyahoga Valley. Heading west along either road presents some challenges with some steep climbs. Such climbs are not unusual in the Cleveland Metroparks but the two routes within the Brecksville Reservation may be among the longest and steepest on All Purpose Trails within the Cleveland Metropark Reservations.

Once you are in the valley if you head east on the trail along Chippewa Creek Drive you can connect to the Station Road Depot and Train Station for the Cuyahoga Valley Scenic Railroad. The Cuyahoga River flows not 50 yards from the station and the tracks. Should you choose to cross the Station Road Bridge you can walk or cycle the Ohio & Erie Canal Towpath Trail through the Cuyahoga Valley National Park. On the Towpath you can travel north into downtown Cleveland or south to Akron and beyond. The Towpath Trail is part of the Ohio to Erie Trail cross-state route. Again, this is a popular destination and it attracts lots of visitors on the weekends. You might find fewer people on these trails late in the afternoon and evenings during the summer.

Bike and Hike Trail

Interesting and varied ride

March, 2019 by djfiler

While this trail is described as 34 miles, it is a 43 mile ride if you do the entire thing. It is a combination of rail trail, power line right of way, suburban streets and park trails. The street sections were unexpected but ok since there was pretty much zero traffic. You have to keep an eye out for tiny green bike trail signs along the way so as to not miss a turn. I managed to get off route a couple times and needed to use google maps and the PDF map of the trail to figure out where to go. That didn’t bother me since it was a good opportunity to get out of the saddle and drink water. More annoying were the frequent road crossings. Some were extremely busy and required use of a crosswalk button.

All this added up to a nice sense of adventure. I parked at the northern end on Alexandra road and did the lollipop counter clockwise. This worked nicely and I would recommend this trail to friends. Just be aware that this is not a typical rail trail. It requires a bit of navigational skill.

Western Reserve Greenway

Avoid the Warren end

February, 2019 by jpinoniemi

Ashtabula to the north side of Warren was great. I rode this trail twice last year. However, once you get into Warren, the trail winds through an urban setting on streets and sidewalks that aren't maintained. I rode the trail to the end and the bike path was littered with broken bottles and glass. I punctured a tire in Warren, but was able to change it and make it back to Ashtabula.

Ohio & Erie Canal Towpath Trail

The OTET is Awesome!

December, 2018 by blzbikebox

Rode this trail from Cincinnati to Cleveland and back in three weeks. The best touring I’ve ever done. This trail is very well kept. To me, Columbus to Massillon was the most scenic. But it’s hard to find any part of this ride that wasn’t great. I went in late September and had only one rainy day followed by a half day of light drizzle. Xenia, Millersville, and Mt. Vernon were my favorite stops. Can’t wait to do it again!

North Coast Inland Trail (Lorain County)

Newly paved section near Kipton.

November, 2018 by ed.wood.77582

The North Coast Inland Trail has now been paved between Kipton and Wakeman. Enjoy it!

MetroParks Bikeway

Partially closed - additional info

September, 2018 by mamon

Adding to what smk wrote in the preceding review: The trail is indeed closed a short distance south of Kirk Rd. because of construction on a new I-76 underpass. Going south, the detour around this closure is: West on Kirk Rd, south on Turner Rd., east on Herbert Rd. While the extra distance due to this detour is not much, I gave up on it because Turner road is narrow, shoulderless, and hilly. There is no visibility over hilltops, and a car speeding over one is too likely to knock down a cyclist on the other side. Unsafe, in my opinion. So the remedy was to ride back to the northern trail end, put the bike on the car, drive to the southern trail end, and ride north to the closure point. This interruption spoiled an otherwise nice ride. Based on the work crew I saw (just two guys), this construction job could take a long time.

Portage Hike and Bike Trail

Portage Hike and Bike Trail - some practical info

September, 2018 by mamon

This is an excellent trail. All paved, mostly flat with only minor inclines, good facilities. Please disregard reviews prior to 2016 because construction was completed in 2015. The only problem is that the description in TrailLink lacks adequate detail, so I would like to provide the following info. Please refer to the TrailLink map to make sense of this info:

This trail is made up of three separate segments in Ohio's Portage County. Two of these segments are sort of connected, and the third is actually the extension of another trail altogether. All three segments run roughly in the east-west direction.
1) The southernmost segment runs along the Cuyahoga River in its western half and through the center of the Kent State University campus in its eastern half. It is about 4 miles long, one way. Expect heavy pedestrian traffic on the campus section on class days.
2) The middle segment runs from a point north-east of Ravenna to downtown Kent. It is about 9 miles long, one way. It is mostly a nature trail.
3) The northernmost segment, also known as the Franklin Connector, is just a 1.6 mile extension of the "Hike & Bike Trail", which TrailLink describes and maps separately under that name. (No "Portage" in the latter name.)
Segments 1 and 2 are connected by a rideable north-south foot path along the Cuyahoga River in Kent's Franklin Mills River Edge Park. At one point, you have to choose between leaving the path and going briefly on River St, which is parallel to the path, OR carrying your bike up or down some stairs. Important : I recommend using the foot path as much as possible when traveling between the segments 1 and 2. You could ride on Kent city streets, but they are complicated and the views along the foot path are much nicer.

MetroParks Bikeway

Partially closed

September, 2018 by smk

Nice trail, but note that it is closed at mile 5 (from the north). Work being done on highway overpasse

Western Reserve Greenway

Great Trail as Always-September 2018

September, 2018 by vicki1960

Labor Day Weekend we biked 31 miles. Parked at Sunside Trailhead in Champion and headed North to Orwell, and back. Makes for a nice 30+ mile trek. It's 15 1/2 miles from Champion to Orwell. Newly repaved section near Orwell. While passing the Wildlife viewing area we noticed the observation deck/platform has been removed. It's been falling apart so this is probably a good thing.

Find Nearby City trails

Accordion

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

OR