Sharonville, OH Atv Trails and Maps

309 Reviews

Looking for the best Atv trails around Sharonville?

Find the top rated atv trails in Sharonville, whether you're looking for an easy short atv trail or a long atv trail, you'll find what you're looking for. Click on a atv trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
0 Result
Activities
Length
Surfaces
Type
Trail Image Trail Name States Length Surface Rating

Now, More Than Ever, Trails Matter!

During COVID-19, trails are being counted on as places where people can find solace and respite and we need your support to keep trails open and provide these critical FREE resources! Please continue to practice physical distancing and check the status of your trail before heading out!

Trails by activity

Recent Trail Reviews

Cardinal Greenway

Great trail with needed maintenance

June, 2020 by stormie_sarge

This is a great trail for indiana. There is a chunk of the trail near the brady street crossing in muncie that heaving of the asphalt is occuring. After experiencing one especially bad heaved area, i will say that people riding bikes at a higher speed really need to watch these. They will jump you and your bike unexpectedly. I am hopeful that whomever is responsible for this portion of the trail will grind these down or replace the heaved sections entirely. There should not be these safety issues present on a paved trail.

Cardinal Greenway

Cardinal Greenway Trail, Richmond, IN to Losantville, IN

May, 2020 by rtool

My first time in this trail. Fully enjoyed it. Well taken care of with easy access at many places along the trail. Indiana drivers were very accommodating at intersections. Now I want to ride another section of this trail.

Xenia-Jamestown Connector

Xenia to Jamestown a quiet, peaceful ride.

May, 2020 by tlockman11

Rode this trail over the weekend and were surprised at the low number of riders on the outbound. The trail's asphalt pavement is in good shape and there is more shade that we expected. There are a few places for drinks and snacks when you reach Jamestown. Would recommend this ~25 mile ride.

Accordion

Lebanon Countryside YMCA Trail

good challenge

May, 2020 by hill.517

It is certainly a nice trail with a good mix of nature and industrial areas. However, this trail is tough and has constant uphill and downhill. If you want a good workout this is the trail for you.

Cardinal Greenway

wonderful trail

April, 2020 by christopherrodriguez2023

This trail is amazing! It is peaceful, scenic with very little noise from traffic.

Wasson Way

partially finished

April, 2020 by nathanb93

I really enjoy how they finished this section of trail. I use it as my daily commute and really enjoy it

Armleder-Lunken Connector Trail

Beautiful Trail

April, 2020 by boso.b4444

I rode my bike here and it was just absolutely gorgeous! Beautiful wild life and the trail is very nice and smooth, and pretty flat, not too hilly. Perfect for people who want to enjoy the ride!

Great American Rail-Trail

Best Trail Ever

January, 2020 by cbyounger

This is the best trail I have ever ridden!

Stillwater River Bikeway

Dayton's Memorial Day Tornado Effected This Trail

November, 2019 by orangedoug

I rode the two segments of the Stillwater River Bikeway back in July of this year, but forgot to review here at TrailLink.

I rode this trail a month and a half after a devastating Category F4 tornado tore through the area. Before my trip to Dayton, I just couldn't believe that I kept reading online that the trail was still closed. However, when I rode the southern section of the trail the destruction of what must of been a beautiful tree lined river pathway became more and more evident as I traveled north from Island MetroPark. It will take decades for the trees to grow back to the same conditions you see along the northern section of the trail. The trail it self is in good shape but becomes somewhat rough as the trail shares the park road north of the Wegerzyn Center. Here the road is marked with a number of potholes and rough patches.

In contrast, the northern section of the Stillwater River Greenway in Englewood MetroPark was not affected by the Memorial Day storms. The trail here is heavily shaded but has an excellent surface. There is one significant climb if you want to travel south of the of Englewood Dam but it is eased by one switch back in order to pass by the dam's spillway. There are several beautiful lakes both above and below the dam. One slightly disturbing aspect of the trail in Englewood Park is that in some areas of the park you have to share the single lane roadway with cars. Fortunately, for a Saturday I didn’t feel that the park was particularly busy.

It saddens me to think of how the weather has changed the face of the southern portion of the trail. Here's hoping that the damage caused by the Memorial Day tornado might spark the desire to connect the two sections in this trail. It might now be easier to complete the gap between the two sections of trail. First of all, the downed trees will have to be removed because as the piles of dead trees dry out they will become more and more of a fire hazard. Because these trees are such a jumbled and tangled mess, heavy equipment will need to be called in to remove the debris. This heavy equipment will create pathways for the equipment to move around in the debris field and perhaps these pathways can be turned into a good portion of the missing section of trail. Only time will tell.

Armleder-Lunken Connector Trail

Use this Trail to Avoid Beechmont Circle

November, 2019 by orangedoug

I rode the Armleder-Lunken Connector Trail in Otto Armleder Park in Cincinnati, Ohio as part of my southbound Ohio to Erie Trail (OTET) route ride. Officially, this trail is not recognized as one of the trails of the OTET route, but I would recommend it to all who are attempting to ride the Ohio to Erie Trail as it avoids a dangerous traffic circle near Lunken Airport. Having ridden the OTET twice before, I consider Beechmont Circle a dangerous intersection for all cyclists because this traffic circle has a number of buildings and trees in its center which block a driver's view of what is up ahead/around the corner in the circle. Combine these blind curves with fairly high speeds within the circle and the interchange can be hazardous to cyclists. Therefore, I have sought out a way to avoid this intersection all together. My solution is to connect to the Lunken Airport Bike Path or Wooster Road/Wooster Pike (depending on your direction of travel) by using the Airport Connector Trail between Lunken Airport and Armleder Park. If you take this trail you avoid Beechmont Circle completely.

Ohio to Erie Trail

The Ohio to Erie Trail Has the Potential to be One of America's Great Trails

November, 2019 by orangedoug

I've ridden the Ohio to Erie Trail (OTET) three times; first in July of 2013, again in May 2016, and most recently in October of 2019. It is interesting to note the progress that has been made in filling in the on-road gaps in the trail between each ride. However, it is frustrating to witness the glacial pace at which this trail is being completed.

Currently, the largest on-road gaps in the OTET exist between the end of the Sippo Valley Trail in Dalton and the beginning of the Holmes County Trail in Fredericksburg; between Killbuck and Glenmont on the Holmes County Trail, and between the end of the Heart of Ohio Trail southwest of Centerburg and the beginning of the Sandel Legacy Trail in Sunbury. There are a few smaller gaps in the OTET among which include, the bike lane in the Ohio River Trail in Cincinnati, the missing bridge over Little Miami River at the end of the Little Miami Scenic Trail needed to connect to the Lunken Airport Bike Path and a less than 1 mile gap between the Prairie Grass Trail and the Roberts Pass Trail in London.

The Ohio to Erie Trail is a paved trail except for the portion of the Ohio & Erie Towpath Trail that runs through northeast Ohio's Cuyahoga Valley National Park. It is unlikely that the National Park Service will pave this portion of the trail due to the canal's historical significance in developing the Ohio territory and helping to expand our nation from the original 13 colonies.

This trail links the three C's of Ohio -- Cleveland, Columbus, and Cincinnati. These are Ohio's 3 largest cities. In between you will encounter a variety of cities and towns; rivers, wetlands, and forests; industrial, commercial, and agricultural areas; and different types of topographies. This variety makes the Ohio to Erie Trail unique when compared to the nation's other long-distance trails.

It is important to understand that the OTET is still a work in progress. While some locations have embraced being a part of the trail, others seem to have completely ignored it. Communities that embrace the trail offer bike friendly establishments whether they be bike shops, hotels, Bnb's, restaurants, or trailheads. There just are not enough of them. The state of Ohio should be looking into promoting such businesses along the trail. One thing that is certainly needed are more official, recognized campsites along the trail. Whereas riders of C&O/GAP Trail, or Missouri's Katy Trail can expect to see a campsite roughly every 8 to 12 miles, the OTET has some areas where such campsites are 60 miles apart. Such distances don't make the trail appealing those that would prefer to camp. It also doesn't give riders much wiggle room in their itineraries to explore around the trail or deal with the unexpected such as a flat tire. Perhaps more campsites and other amenities will become a priority once the trail is fully completed.

My complaints are not intended to be a trashing of this trail but rather constructive criticism designed to help improve this into one of America's great trails. With the Rails to Trails Conservancy designating much of the OTET as part of its route for the Great American Rail-Trail through Ohio, I'm hoping that improvement and completion of the trail will become more of a state priority. If you are considering riding the Ohio to Erie Trail, don't hesitate. It is worth every pedal stroke.

Newport Southbank Bridge (Purple People Bridge)

A Must if You Are Riding the Ohio to Erie Trail

November, 2019 by orangedoug

If you choose to ride the Ohio to Erie Trail route, especially if you are heading southbound, consider taking one short additional ride on the Newport Southbank Bridge. It is also known locally as the Purple People Bridge because of its lavender color and because it is not open to cars. The length of the trail is listed at 1/2 mile in length, so it will not take you very long to complete even an out and back ride on the bridge.

The payoff for riding this short trail is the opportunity to get some great pictures of the Cincinnati skyline and riverfront. In addition, on the other end of the bridge is the Newport Aquarium, a 20 screen AMC movie theater, and many restaurants and bars.

Find Nearby City trails

Accordion

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

OR