Looking for the best trails around Crestline?

Explore the best rated trails in Crestline, OH, whether you're looking for an easy walking trail or a bike trail like the Big Walnut Trail and T. J. Evans Trail . With more than 36 trails covering 4914 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.

Recent Trail Reviews

Great American Rail-Trail

Airbnb right on trail in Burgettstown

June, 2026 by dowiakp

Discovered this comfortable place with great accommodations for two bike travelers. They offer a pullout sofa if you do not wish to share a bed. Indoor bike storage with a comfy bed and a hot shower! Distillery right next-door and two restaurants to fuel up in the morning to get back on the trail. Close to the panhandle of West Virginia. Their name is Harmony Trail Haven on Airbnb.

Great American Rail-Trail

Highly recommend this beautiful and well kept trail. Beautiful to ride along the trees and over the 2 epic ohiopyle bridges.

May, 2026 by sarahraekratz

Highly recommend this beautiful and well kept trail. Beautiful to ride along the trees and over the 2 epic ohiopyle bridges.

Springfield Branch Trail

Local Community Trail

April, 2026 by sjf0809

This trail is good for local people and college students and staff to get to various places close to the Ohio Wesleyan University. A few people were using it at mid-day on a Wednesday during April. It was in fairly good condition. Warning lights help with street crossings. I parked in the lot off of S Liberty St and then biked in both directions.

Accordion

New London-Greenwich Rail Trail

New London-Greenwich Rail Trail

January, 2026 by tbabcock60

I am definitely biased, but having this trail a quarter of a mile from my house is a gift. The crushed limestone parts are very smooth and any bike will work. It does get rough for much of the trip. A mountain bike or gravel bike is needed. I have a hardtail mountain bike and that is perfect. I hope in the future they complete the trail with crushed limestone. But if they don't I will still be happy it's there.

Holmes County Trail

Fredericksburg to Killbuck

October, 2025 by brianstinney

We rode the roughly 30 miles from Fredericksburg to Killbuck and back. Paved trail with some nice views and lots of shaded areas. It’s a shared trail with horse/buggies and there are a lot of Amish on E-bikes pulling carts but the path is very wide. My only complaints are the bumps in some areas and the need to constantly dodge horse manure.

Richland B&O Trail

Love this trail but …..

October, 2025 by iglooicing

Really love this trail. Mostly shaded and they have ground down the tree roots but could use more road markings and signage at road crossings. The electric bikes and scooters are really becoming a problem.

Lester Rail Trail

Recently resurfaced

September, 2025 by davidmaggiehome

The trail has been resurfaced and the section up to the Medina Career Center has been paved with asphalt. Trail is in excellent condition. Nice job Medina county!

Holmes County Trail

Holmes County trail has recently been extended an extra 4 miles from the Glenmont trailhead. Killbuck trailhead is now approximately a 3 mile highway ride from the end of this new addition.

September, 2025 by ddb649

Holmes County trail has recently been extended an extra 4 miles from the Glenmont trailhead. Killbuck trailhead is now approximately a 3 mile highway ride from the end of this new addition.

North Coast Inland Trail (Huron County)

Norwalk area West then East

August, 2025 by vicki1960

We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.

Mohican Valley Trail

Road trail August 15th

August, 2025 by yx4xzgd5fb

The trail itself was in good shape, fairly smooth not a lot of bumps. About 75% of the ride was shaded. It would be pretty in the fall when the leaves change colors. Major complaint is the amount of horse poop on the trail. And because most of the trail being shaped it was hard to avoid. Washed my bike when I got home. Kokosing Gap trail and Holmes County Trail are much better rides.

North Coast Inland Trail (Sandusky and Ottawa Counties)

Very Nice Trail

August, 2025 by mbroder

We parked at the lot in Elmore and first rode northwest to Genoa. This is a good section of the Inland Trail, very flat, good pavement, lots to see and do. The map doesn't show it yet, but the trail is paved all the way into Genoa. The newly added trail runs north beside Martin Williston road, and west beside SR-51, then winds along a separate paved path into Genoa. The trail is separated from the roads, no problem. The trail ends ends in Genoa at Washington and 6th streets, adjacent to an Ice Cream shop and Veterans Memorial Park. We then rode back to Elmore, then over to Lindsey. Each town is about 5 miles apart, giving us roughly half hour segments between each town. There are a few crossings along the way, but not bad. Plenty of shade. They just added a lot to the intersection going under the Ohio turnpike. There is a Sunflower Tours site on the outskirts of Lindsey. You can take a tractor-pulled trailer ride through a field of sunflowers for a small fee. Looked like a good time. The pavement is well maintained and the path is well marked. All and all a very nice afternoon ride.

North Coast Inland Trail (Sandusky and Ottawa Counties)

Aug. 2025: Sunflowers, Corn and the Waggoner Road Detour is open

August, 2025 by vicki1960

Fremont to Elmore, August 2025. Parked in Fremont at 1500 Walter Avenue lot. Traveled West to just beyond Elmore and back. Though the trail does continue to Genoa, it was a hot and sunny day and there isn't much shade. Most of the trail goes through cornfields. Happy that we can now go under the OH turnpike at Waggoner Road. The 15 month construction is over, it's very nice and worth the wait! Beautiful Sunflower field in Lindsey. Trail is paved and obviously a flat rail trail through quaint old railroad towns. This is our favorite section of the trail we frequent it traveling 3 1/2 hours to get to. We brought in some revenue to the area staying 3 days and riding multiple trails.

Find Nearby City trails

Accordion

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.