Looking for the best trails around Marblehead?

Explore the best rated trails in Marblehead, OH, whether you're looking for an easy walking trail or a bike trail like the University/Parks Trail and East-West Connector Trail . With more than 30 trails covering 286 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.

Recent Trail Reviews

North Coast Inland Trail (Huron County)

Norwalk area West then East

August, 2025 by vicki1960

We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.

North Coast Inland Trail (Sandusky and Ottawa Counties)

Very Nice Trail

August, 2025 by mbroder

We parked at the lot in Elmore and first rode northwest to Genoa. This is a good section of the Inland Trail, very flat, good pavement, lots to see and do. The map doesn't show it yet, but the trail is paved all the way into Genoa. The newly added trail runs north beside Martin Williston road, and west beside SR-51, then winds along a separate paved path into Genoa. The trail is separated from the roads, no problem. The trail ends ends in Genoa at Washington and 6th streets, adjacent to an Ice Cream shop and Veterans Memorial Park. We then rode back to Elmore, then over to Lindsey. Each town is about 5 miles apart, giving us roughly half hour segments between each town. There are a few crossings along the way, but not bad. Plenty of shade. They just added a lot to the intersection going under the Ohio turnpike. There is a Sunflower Tours site on the outskirts of Lindsey. You can take a tractor-pulled trailer ride through a field of sunflowers for a small fee. Looked like a good time. The pavement is well maintained and the path is well marked. All and all a very nice afternoon ride.

North Coast Inland Trail (Sandusky and Ottawa Counties)

Aug. 2025: Sunflowers, Corn and the Waggoner Road Detour is open

August, 2025 by vicki1960

Fremont to Elmore, August 2025. Parked in Fremont at 1500 Walter Avenue lot. Traveled West to just beyond Elmore and back. Though the trail does continue to Genoa, it was a hot and sunny day and there isn't much shade. Most of the trail goes through cornfields. Happy that we can now go under the OH turnpike at Waggoner Road. The 15 month construction is over, it's very nice and worth the wait! Beautiful Sunflower field in Lindsey. Trail is paved and obviously a flat rail trail through quaint old railroad towns. This is our favorite section of the trail we frequent it traveling 3 1/2 hours to get to. We brought in some revenue to the area staying 3 days and riding multiple trails.

Accordion

New London-Greenwich Rail Trail

Good ride

August, 2025 by sjf0809

As noted, this trail is in the second phase of three, so expect it to be under construction. The third phase will be making the trail under the overpass to eliminate going on the road for that short time.

I started at the trailhead in Greenwich. The parking lot and about .2 mile is gravel, but then it turns to crush stone (crushed limestone or cinder???). That was very flat and smooth. It lasted about a mile until the trail crossed Alpha Rd. The surface was then gravel and dirt, the worse part was closer to the overpass. After a short zig-zag on roads to get across Rt 250 and Vermilion River, the trail continued. The total length of the gravel and dirt section was about 4 miles. The final 2 miles going into New London was crushed stone again. The trail head in New London was paved with cement. No restrooms were at either trail head. It took me about 40 minutes in each direction. It is true that some places were rougher than others, but I was still rolling at 12-13.5 mph. On the limestone sections, I was cruising at 13.5-15.5 mph. The trail is lined with trees and fairly straight, since it was a railroad track in the past. It also crosses a few roads.

The trail does run alongside, but doesn't cross, an active railroad track.

A few benches are located on the crushed stone sections.

Eateries and shops are within maybe a half a mile from the New London trail head, and within a mile or so from the Greenwich trail head.

The trail has improved since I was last rode it in September of 2023, when it was all gravel, and much rougher. For those who like smooth asphalt, parts will be rough. For those who like single track on dirt over roots and rocks, probably won't think that it is bad. Wider tires are recommended. Mine were 35.

Enjoy the ride and remember that it is a work in progress.

Rocky River Reservation All Purpose Trail

emerald necklace appropriate

July, 2025 by dogtown

A gem of a trail from Royalton Rd to the Marina. I’d probably avoid during weekends or after work due to increased foot traffic. Smooth tarmac except for detour near Cedarpoint Rd bridge reconstruction but fun gravel.

Wayne County Metroparks Trail

A bit Rough

June, 2025 by clonetrooper5373

I feel this trail is a bit of a mixed bag, as it has an excellent round trip and is completely open to the sun, but the pavement is very rough and badly needs an upgrade (which seems to have started around 2025) throughout most of the trail.

With that said, I would cautiously recommend this trail if you're wiling to try it.

Brownstown Township Trail

Meh

June, 2025 by clonetrooper5373

With nonstop noise from vehicle traffic a constant and nothing to see/do I might consider skipping if you're from out of town.

Trenton Walking Path

Good

June, 2025 by clonetrooper5373

A good, quick trial that's' mostly sunny, good smooth pavement, but nothing to see except some sports fields.

New London-Greenwich Rail Trail

Trail in progress

June, 2025 by shepdazzle

This trail is still in phase two of a three phase project which won’t finish until 2026. The New London and Greenwich ends are finished and nice crushed cinder but the middle between Greenwich is very rough. Fencing has been put up in some areas, a bench or two but it has shade and some nice farm, wooded views. There are restaurants and small shops at both ends of the trail. It will be great once complete!

Slippery Elm Trail

Very Nice Trail

June, 2025 by vicki1960

While coming across OH on our way back to PA from IN, we stopped at this trail. Had lunch in Bowling Green (OH). Parked at the Montessori school trailhead since school was not in session. Biked South to North Baltimore and back. It was a hot and sunny day. There isn't much shade coverage as this trail goes through mainly farmlands once out of Bowling Green. First few miles appears to be newer asphalt pavement but the further South, the more sealed cracks there are but it wasn't bumpy. Wood County Parks District does a great job maintaining this trail with trash cans (that they empty) and park benches along the way. Grass was cut too! North Baltimore end of the trail has parking and real flush toilet restrooms. One block from town for water/food if needed. There are quite a few road crossings but not a lot of traffic.

Dr. Richard D. Ruppert Rotary Trail

Alright

June, 2025 by clonetrooper5373

It's got some nice scenery, but with pretty bad pavement and an iffy round trip distance, I wouldn't bother unless you're local.

New London-Greenwich Rail Trail

Rough Ride

June, 2025 by christine_bopp

A mix of cinder(about 2 miles in New London) and large stone and rough terrain the rest of the trail made for a rough, uncomfortable and tricky ride. The nice mix of sun and shade along the entire trail was a positive. Not recommended.

Find Nearby City trails

Accordion

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.