Find the top rated horseback riding trails in Marion, whether you're looking for an easy short horseback riding trail or a long horseback riding trail, you'll find what you're looking for. Click on a horseback riding trail below to find trail descriptions, trail maps, photos, and reviews.
We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.
The trail itself was in good shape, fairly smooth not a lot of bumps. About 75% of the ride was shaded. It would be pretty in the fall when the leaves change colors. Major complaint is the amount of horse poop on the trail. And because most of the trail being shaped it was hard to avoid. Washed my bike when I got home. Kokosing Gap trail and Holmes County Trail are much better rides.
Fremont to Elmore, August 2025. Parked in Fremont at 1500 Walter Avenue lot. Traveled West to just beyond Elmore and back. Though the trail does continue to Genoa, it was a hot and sunny day and there isn't much shade. Most of the trail goes through cornfields. Happy that we can now go under the OH turnpike at Waggoner Road. The 15 month construction is over, it's very nice and worth the wait! Beautiful Sunflower field in Lindsey. Trail is paved and obviously a flat rail trail through quaint old railroad towns. This is our favorite section of the trail we frequent it traveling 3 1/2 hours to get to. We brought in some revenue to the area staying 3 days and riding multiple trails.
As noted, this trail is in the second phase of three, so expect it to be under construction. The third phase will be making the trail under the overpass to eliminate going on the road for that short time.
I started at the trailhead in Greenwich. The parking lot and about .2 mile is gravel, but then it turns to crush stone (crushed limestone or cinder???). That was very flat and smooth. It lasted about a mile until the trail crossed Alpha Rd. The surface was then gravel and dirt, the worse part was closer to the overpass. After a short zig-zag on roads to get across Rt 250 and Vermilion River, the trail continued. The total length of the gravel and dirt section was about 4 miles. The final 2 miles going into New London was crushed stone again. The trail head in New London was paved with cement. No restrooms were at either trail head. It took me about 40 minutes in each direction. It is true that some places were rougher than others, but I was still rolling at 12-13.5 mph. On the limestone sections, I was cruising at 13.5-15.5 mph. The trail is lined with trees and fairly straight, since it was a railroad track in the past. It also crosses a few roads.
The trail does run alongside, but doesn't cross, an active railroad track.
A few benches are located on the crushed stone sections.
Eateries and shops are within maybe a half a mile from the New London trail head, and within a mile or so from the Greenwich trail head.
The trail has improved since I was last rode it in September of 2023, when it was all gravel, and much rougher. For those who like smooth asphalt, parts will be rough. For those who like single track on dirt over roots and rocks, probably won't think that it is bad. Wider tires are recommended. Mine were 35.
Enjoy the ride and remember that it is a work in progress.
Well maintained trail. The only thing missing is an ice cream shop.
We try to get to this one every year commuting nearly 3 hours and staying in the area. Flat paved trail runs from Danville to Mount Vernon. Crosses the Kokosing river several times over historic railroad bridges, goes through Kenyan College at Gambier and passes through the old stone arch in Howard. Mostly shaded with some open farmlands. We saw a few deer. Connecting trails are Heart of Ohio in Mt. Vernon and Mohican Valley in Danville. All around great trail!
Excellent trail. We parked at the Pickerington Ponds Park trailhead. There are bathrooms there with running water/sewer even though the map doesn't show it. Plenty of parking and nice park in its own right. The trail starts right at the parking lot. If I had one complaint, there could be more pronounced maps and signs along the trail. We missed the trail towards 3 Creeks Park and continued northeast through Portman Park and up Hines Road.
Note: The map shows a break in the pavement for about 200 yards or so just south of Refugee road. It's pavement straight through now.
The section along Hines Road up to Trussing is OK, but the trail is a modified sidewalk along the road, and the road is loud and busy, and crossing the side streets can be concerning. I realized we were going the wrong way when we got to Trussing Rd. and we turned around. Backtracking we saw the sign we missed and got back on course.
The segment starting where the path leaves Hines Road, to the Three Creeks Park trailhead, is fantastic. There is lots of shade. The trail passes a lot of nice parks and things. We saw deer along the trail. The trail goes over or under many busy roads that we would otherwise have to cross. The uphill's and downhills are gradual. All and all this is a great trail. We will definitely come back.
Started on the north part of the trail going south. It switchbacks around a lot of major road infrastructure, but I didn’t have to cross a major road in any of the sections. I ended up getting a bit lost multiple times, but after about 3 miles in, it got a bit easier to navigate. It’s all paved and the part I road on was mostly good with a few sections of bumps. Definitely close to nature - i saw deer, rabbits, and a hawk catch another bird.
Fun variety of beautiful views. Trail was clean but could have had better markers in a few locations. Had to consult map several times.
Watch out for mud over the trail at the river just south of the Greenlawn Avenue bridge near Lou Berliner Park.
This trail is still in phase two of a three phase project which won’t finish until 2026. The New London and Greenwich ends are finished and nice crushed cinder but the middle between Greenwich is very rough. Fencing has been put up in some areas, a bench or two but it has shade and some nice farm, wooded views. There are restaurants and small shops at both ends of the trail. It will be great once complete!
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!