|
Overview
The Shingle Creek Regional Trail startled with humble beginnings of just over 1 mile, leaving off near Steffee Landing, south of US Highway 192, and running past the Osceola County Welcome...
|
FL |
17.7 mi |
Asphalt, Boardwalk, Concrete
|
|
|
Overview
About 20 miles west of Orlando, the South Lake Trail (also known as Lake Minneola Scenic Trail) takes in some of central Florida's most spectacular prospects. Nowhere in this region will...
|
FL |
15.5 mi |
Asphalt
|
|
|
Part of Florida's Coast-to-Coast Trail, the Starkey Gap Trail is a broad paved trail traveling within the Duke Energy powerline corridor. Paved with asphalt, the trail is 12-feet-wide.Â
Stretching...
|
FL |
2.4 mi |
Asphalt
|
|
|
The paved trail in Jay B. Starkey Wilderness Park stretches across the preserve for about 6 miles. Well-spaced shelters along the trail offer pleasant places to rest in the shade; many are even...
|
FL |
5.8 mi |
Asphalt
|
|
|
Overview
The Suncoast Trail parallels the Suncoast Parkway for 54.1 miles through Hillsborough, Pasco, Hernando, and Citrus counties.
About the Route
For its entire route, the Suncoast Trail...
|
FL |
54.1 mi |
Asphalt
|
|
|
Closure Notice:Â The Rocky Creek Bridge is closed for reconstruction. Both north and south of the bridge are open to trail use. The closure is expected to last until 2025. Please check with...
|
FL |
13.85 mi |
Asphalt
|
|
|
Overview
Connecting small communities and suburban neighborhoods, the 22-mile West Orange Trail is one of Florida's most popular rail-trails, thanks to its reputation and proximity to metro...
|
FL |
22.4 mi |
Asphalt, Concrete, Dirt, Woodchips
|
|
|
Closure notice: Starting August 2024, a resurfacing project is underway along portions of the Withlacoochee State Trail. Sections of the trail will temporarily close when necessary. Please follow all...
|
FL |
45.9 mi |
Asphalt, Boardwalk, Concrete
|
|
|
Please note: There is a gap in the route where it will cross over Lake Tarpon Outfall Canal. The bridge is scheduled for completion in 2024.
Overview
Currently, the Duke Energy Trail is almost...
|
FL |
11.68 mi |
Asphalt, Concrete
|
|
|
Overview
The paved Fort Fraser Trail traverses part of the former CSX Railroad line, running parallel to US Highway 98 for 7.54 miles, between Lakeland and Bartow, Florida.
About the...
|
FL |
7.54 mi |
Asphalt
|
|
|
The Neptune Road Recreational Pathway, also known as the Bill Johnston Memorial Pathway, connects Kissimmee's Lakefront Park to St. Cloud in central Florida. The 10-foot wide trail exits the Kissimmee...
|
FL |
6.6 mi |
Asphalt, Concrete
|
|
|
The Oldsmar Trail extends over 10 miles, and links to 10 major parks in Oldsmar, Florida. R.E. Olds Park lies at the center of the system, which is roughly shaped like an upside down T. One...
|
FL |
11 mi |
Asphalt, Boardwalk, Concrete, Crushed Stone
|
|
|
It should take about 50 minutes to walk the Tampa Riverwalk from end to end, but chances are, it'll take you much longer than that. Tampa's waterfront abounds with attractions for the whole family -...
|
FL |
2.6 mi |
Asphalt, Brick, Concrete
|
|
|
This is a paved multipurpose trail connecting two cities in central Florida. The pathway stretches 3 miles from W Main St. in Tavares, parallel to US-441 S, and terminates just after Kinne Pearce Rd....
|
FL |
3.5 mi |
Asphalt
|
|
|
The Town-n-Country Greenway is part of Tampa's network of trails and non-motorized greenways. You can access the paved trail from a parking lot on Webb Road, just south of Woodbridge Boulevard and on...
|
FL |
3 mi |
Asphalt
|
|
|
The Wilson Parkway Trail parallels the road of the same name, stretching north from Cherry Rd to its endpoint on Libby Rd. #3. It’s mostly a green ride, there’s not much variation in scenery. The...
|
FL |
3 mi |
Asphalt
|
|
|
Overview
The Chain of Lakes Trail stretches nearly 5 miles along an abandoned rail corridor between downtown Winter Haven and north of Lake Alfred in central Florida.
About the Route
As its...
|
FL |
4.7 mi |
Asphalt
|
|
|
Combining asphalt off-street paths and sections of sidewalk (particularly the eastern arc of the loop), the Kissimmee Loop provides access from the city’s residential neighborhoods to many amenities,...
|
FL |
6 mi |
Asphalt
|
|
|
Part of the developing Wekiva Trail System, the Neighborhood Lakes Scenic Trail will help provide an essential link between Lake and Orange Counties. From its northern endpoint in Sorrento, the...
|
FL |
2.8 mi |
Asphalt
|
|
|
The Old Fort King Trail is a 6.7-mile mixed-surface trail in west Central Florida. The trail consists of two parts: starting from John B. Sargeant Park, a 2.2 mile paved portion heads north, along the...
|
FL |
6.7 mi |
Asphalt, Dirt, Grass
|
|
|
The Crosstown Trail in Crystal River is a historic railway line that has been converted into a multiuse trail stretching nearly two miles. The concrete trail is used for walking, biking and hiking. A...
|
FL |
1.8 mi |
Concrete
|
|
|
As its name suggests, the Leesburg-Wildwood Trail is planned to connect the two communities via an off-street, walking and biking pathway. Presently, the trail extends between Veech Road and N. 14th...
|
FL |
2.6 mi |
Asphalt, Concrete
|
|
|
The Montverde Greenway Trail or as locals refer to it "The Greenway" provides safer passage along County Road 455 for commuting and recreational activities. The paved trail runs along a former...
|
FL |
1 mi |
Concrete
|
|
|
Fountain Lake Trail is just short of a mile long, and occupies a former CSX railroad corridor. The trail is built to accommodate both pedestrians and cyclists, as well as other non-motorized users....
|
FL |
0.9 mi |
Asphalt
|
|
|
This trail branches off from the Leesburg-Wildwood rail-trail and will some day reach Fruitland Park, about 3 miles away. The current paved portion extends 0.7 miles, cutting a shaded swath past...
|
FL |
0.7 mi |
Asphalt
|
|
|
This is a biking and walking trail located in Leesburg, Florida. It's the first part of what is hoped to be a rail-trail extending to Leesburg High School. Currently, the paved trail heads east from...
|
FL |
0.7 mi |
Asphalt
|
|
|
The Marine Parkway Multi-use Path was constructed as part of a wider trail networking improvement effort in the city of New Port Richey. The ultimate vision is to have a continuous bike-ped connection...
|
FL |
0.4 mi |
Asphalt
|
|
|
This is a dedicated bike-ped sidepath along Pleasant Hill Road in Kissimmee, Florida. The north-south trail extends from Cypress Parkway to Orange Blossom Trail (US Highway 17/ 92) through a setting...
|
FL |
0 mi |
Asphalt
|
|
|
Located in Leesburg, Florida, this two-lane, asphalt trail parallels Canal Street, connecting to the Venetian Gardens Park at its southern end. The park is spread out over 45 acres tucked into the...
|
FL |
0.5 mi |
Asphalt
|
|