Eastlake, OH Horseback Riding Trails and Maps

634 Reviews

Looking for the best Horseback Riding trails around Eastlake?

Find the top rated horseback riding trails in Eastlake, whether you're looking for an easy short horseback riding trail or a long horseback riding trail, you'll find what you're looking for. Click on a horseback riding trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
5 Results
Activities
Length
Surfaces
Type

Headwaters Trail

8 mi
State: OH
Crushed Stone

Hemlock Creek Trail

2 mi
State: OH
Asphalt, Concrete

Maple Highlands Trail

20.5 mi
State: OH
Asphalt, Gravel

Ohio & Erie Canal Towpath Trail

92 mi
State: OH
Asphalt, Ballast, Boardwalk, Crushed Stone, Dirt, Grass

Ohio to Erie Trail

293 mi
State: OH
Asphalt, Concrete, Crushed Stone
Trail Image Trail Name States Length Surface Rating
The bucolic Headwaters Trail is a pleasant 8-mile journey through the rural landscape between Mantua and Garrettsville. The path has a crushed-stone surface and is mostly shaded. It follows the route...
OH 8 mi Crushed Stone
Decades in the making, at long last the Hemlock Creek Trail opened to the public in September 2019, giving residents of the Ohio community of Independence a convenient and scenic trail connection to...
OH 2 mi Asphalt, Concrete
The Maple Highlands Trail totals more than 20 miles along a former Baltimore & Ohio Railroad corridor through a mostly rural landscape with portions of the trail running through heavily wooded...
OH 20.5 mi Asphalt, Gravel
The Ohio & Erie Canal Towpath Trail is an amazing trail journey that takes trail users for 92 miles between the heart of this country’s industrial might in cities like Cleveland and Akron, to some of...
OH 92 mi Asphalt, Ballast, Boardwalk, Crushed Stone, Dirt, Grass
Closure Notice: There are several closures and detours in place for the Ohio to Erie Trail. See here for more information. The Ohio to Erie Trail is a colossal project, not just for the state of...
OH 293 mi Asphalt, Concrete, Crushed Stone

Recent Trail Reviews

Maple Highlands Trail

Great destination trail

September, 2026 by rhenry21

Started at Swine Creek where there’s a smelly pit toilet where you can change lol. Nicely paved and maintained trail, just a few bumps, mostly at the Chardon end. Only water fountains seem to be around Chardon as well, so take plenty with you. Return trip seemed to go a little easier but not much elevation change overall, other than some serious hills (both ways) during the portion paralleling Route 44 near the northern end of the trail. For some reason the trail is not quite as well marked when you’re going south, at least through Middlefield and especially the on-road section back to Swine Creek; didn’t have any problem going north.

Starting at the south end, initially I was disappointed at the lack of any historical signage, these are always a big plus for me; around Chardon however there are quite a few railroad history markers, so that made up for it. And I’m probably an outlier here, but even though the faux covered bridges are cute, it almost seems like the trail designers tried to erase most vestiges of the trail’s railroading past; other than the very informative markers in Chardon, practically no railroading evidence exists, but then I’m a bit of a train nerd. Scenery was very pleasant, with the trail length and nice surface (and lotsa nearby breweries, taverns, and overall quaint towns all over this part of the state), could be considered a destination trail.

Western Reserve Greenway

Another great Summer ride

September, 2026 by vicki1960

We biked from mile 0 at the Trumbull/Ashtabula county line to Austinburg and back. Passed through Orwell and had lunch. Trail very well shaded and in good condition but a few root liftings in the asphalt but not a deal breaker. Enjoyed our stop in Austinburg but saddened to see that Shannon's mini mart is now closed since the owners retired after almost 20 years there.

Maple Highlands Trail

One of Ohio's Best

August, 2026 by vicki1960

We travel almost 2 hours to get to this trail and worth the drive. One of Ohio's nicest trails. Asphalt paved in very good condition, pretty scenery, well maintained by Geauga County Parks, numerous benches along the route, grass cut, trash cans emptied and nice restrooms. There are 5 covered bridges along the trail. Most of the trail is full sun so make sure you slather up with sunscreen on a sunny day. We parked at Headwaters Park and biked up to Chardon for lunch and back. Then biked down to Middlefield. Total miles 30 round trip. Was sad to see the fountain at the Middlefield end of the trail was not working and the trellis removed and no hanging flower baskets.

Accordion

Niles Greenway

Summer 2026 Ride

August, 2026 by vicki1960

We biked on this trail coming seamlessly off the Metro Parks trail. This trail begins at Countyline....the Mahoning and Trumbull County lines. Trail is asphalt paved in good condition. One busy road crossing just below Meander Reservoir. At the Niles trailhead the trail extends 2/10 of a mile over at least one bridge. Eventually it will connect with the Western Reserve Trail in Warren.

Western Reserve Greenway

Summer 2026 Ride

August, 2026 by vicki1960

We parked in Orwell and biked South to Bristolville and turned around. Then back to Orwell for lunch at the Mexican restaurant along the trail. Great food and service with outdoor seating. They will also fill your water bottles with water and ice. After lunch we headed North to Rock Spring. Total 36 miles round trip. This trail is virtually flat as well as straight. Most of it is very well shaded. Trail in very good paved condition though between Oakfield and Bristol a stretch about 1/10 of a mile with some kind of speed bumps every 20 feet. We are not sure what the purpose of that is, they are marked with paint. If you can just overlook that, the rest of the trail is super!

Ohio to Erie Trail

Made up of many trails

July, 2026 by vicki1960

This "trail" is made up of many smaller trails and some of it is on roads. Do as much research on this as you can before your trip!

Portage Hike and Bike Trail

trail maintenance

July, 2026 by fogbent

Hats off to Portage County for repaving last year and redoing the RR crossing near Ravenna. Whether it was the RR or the County you did a fantastic job on a hazardous crossing. Very nice trail. Hopefully it gets extended east

Pyamunting Valley Greenway

Summer Ride

July, 2026 by vicki1960

Enjoyed our ride along this trail. Doesn't offer much shade but the scenery is fields of corn and other crops and working farms. We parked at the police station in Andover and biked to Leon Road and back, then zig-zagged through town (Andover) and biked the Southern section from Mill Street to Marvin Road. Out and back is approx 12-13 miles. Always a great ride along this trail which is less than 2 years old. While in the area, about 10 minutes away is the Spillway Trail in Linesville, PA. July, 2026.

Western Reserve Greenway

it’s a trail

July, 2026 by brianstinney

We rode from Warren trailhead on the Southern end to North Bloomfield and back (about 28 miles round trip). It’s kind of a boring trail, mostly woods on each side with not many views. There are HORRENDOUS bumps on a stretch just north of Rt. 88. 17 huge “speed bumps” in a half mile stretch that are marked with red and yellow paint. Needs fixed badly. We will most likely not ride this section of the trail again. Will attempt the northern end from Orwell to see if it’s any better.

Maple Highlands Trail

June 2026

July, 2026 by blarnold

Parked at Swine Creek. Traveled up to Middlefield, where we picked up the trail. Went north to Chardon. Turned west down to Spinners Diner for lunch and biked back. On the way up, there was a small tree across the trail. By the time we got back, it was cleared. Hit two Amish Markets in Middlefield for some baked goods. After, we went south to Garrett’s Mill and Brewing in Garrettsville, OH for a pint. Great day trip!!

Rocky River Reservation All Purpose Trail

wrong address

July, 2026 by w.hodina

Location for parking says 136 E Bagley but should be 136 West Bagley.

Pyamunting Valley Greenway

Map is backwards. Plenty of parking at North end of trail. North section is about 3 miles, while the South is about 2 miles.

June, 2026 by richmerrow.rm

Map is backwards. Plenty of parking at North end of trail. North section is about 3 miles, while the South is about 2 miles.

Find Nearby City trails

Accordion

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.