Sandusky, OH Inline Skating Trails and Maps

147 Reviews

Looking for the best Inline Skating trails around Sandusky?

Find the top rated inline skating trails in Sandusky, whether you're looking for an easy short inline skating trail or a long inline skating trail, you'll find what you're looking for. Click on a inline skating trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
18 Results
Activities
Length
Surfaces
Type

Bridgeway Trail

4.8 mi
State: OH
Asphalt

Chessie Circle Trail

11 mi
State: OH
Asphalt, Crushed Stone

Chippewa Inlet Trail

3.95 mi
State: OH
Asphalt, Crushed Stone

Chippewa Rail-Trail

2.4 mi
State: OH
Asphalt

Cleveland Lakefront Bikeway

17 mi
State: OH
Asphalt

Dr. Richard D. Ruppert Rotary Trail

2.36 mi
State: OH
Asphalt

Lake to Lake Trail

2.4 mi
State: OH
Asphalt, Boardwalk

North Coast Inland Trail (Lorain County)

19.3 mi
State: OH
Asphalt, Crushed Stone

Richland B&O Trail

18.5 mi
State: OH
Asphalt

Slippery Elm Trail

13.1 mi
State: OH
Asphalt

Steel Mill Trail

2 mi
State: OH
Asphalt

University/Parks Trail

6.3 mi
State: OH
Asphalt
Trail Image Trail Name States Length Surface Rating
Big Creek Reservation All Purpose Trail provides a paved pathway connecting the Mill Stream Run Reservation, Big Creek Reservation, and the Fern Hill Picnic Area. At its southern end, you can connect...
OH 7.4 mi Asphalt
The Brecksville Reservation All Purpose Trail offers a pleasant paved pathway connecting the community of Brecksville with the Ohio & Erie Canal Towpath Trail, a well-loved 81-mile route from...
OH 6 mi Asphalt
The Brideway Trail is found within the Black River Reservation, a park in Lorain County, where you can walk, jog, inline skate, cross-country ski or bike. The trail runs between Day's Dam in Lorain...
OH 4.8 mi Asphalt
The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...
OH 11 mi Asphalt, Crushed Stone
The Chippewa Inlet Trail runs for nearly 4 miles between Lafayette Road/State Route 42 and the Chippewa Nature Area. The trail traverses an open, pastoral landscape along the Chippewa Inlet, which...
OH 3.95 mi Asphalt, Crushed Stone
The Chippewa Rail Trail runs for 2.4 miles between Chippewa Road (SR 50) in Chippewa Lake to suburban Wycliffe Drive southwest of Medina (Lafayette Township). The trail is mostly rural in feel,...
OH 2.4 mi Asphalt
The Cleveland Lakefront Bikeway extends 17 miles along the city's Lake Erie shoreline, between the suburbs of Euclid and Lakewood. The bikeway has on-road sections, and the route is signed. The...
OH 17 mi Asphalt
The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...
OH 2.36 mi Asphalt
Cleveland Metroparks’ Lake to Lake Trail links Lake Isaac and Lake Abram in Middleburg Heights via an asphalt- and boardwalk-surfaced path. The two lakes are the largest remaining glacial wetlands in...
OH 2.4 mi Asphalt, Boardwalk
For nearly 9 miles, the Mill Stream Run Reservation All Purpose Trail runs through a wooded park in Berea, a western suburb of Cleveland. Though the trail loosely parallels Valley Parkway, you will...
OH 8.9 mi Asphalt
The North Coast Inland Trail will one day stretch across northern Ohio from Indiana to Pennsylvania on a network of connecting off-road trails. Today, large sections of the trail, especially from the...
OH 19.3 mi Asphalt, Crushed Stone
The North Coast Inland Trail (NCIT) represents a regional collaboration among park districts across the Buckeye State to connect trails linking Ohio to Indiana and Pennsylvania. Begin this section...
OH 28 mi Asphalt
The short North Olmsted Walking & Bike Trail parallels Interstate 480 and provides an alternate, non-motorized route linking neighborhoods with green spaces and business districts.
OH 3 mi Asphalt
Traveling just over 18 miles through some of the most scenic areas of the Buckeye State, the Richland B&O Trail is an ideal way to immerse yourself in the region. Built partially as a result of the...
OH 18.5 mi Asphalt
The Rocky River Reservation All Purpose Trail parallels Valley Parkway through several western suburbs of Cleveland, but this is no traditional suburban side path. Instead, the winding trail through...
OH 13.5 mi Asphalt
In 1875, the Bowling Green Railroad Company operated its first train from its namesake city in Ohio south to Tontogany on rails made from the wood of the local slippery elm tree. The trees were...
OH 13.1 mi Asphalt
The Steel Mill Trail is a 2-mile continuation of the Bridgeway Trail, which lies within the Black River Reservation, a scenic wooded park in Lorain. The Steel Mill Trail picks up at the north end of...
OH 2 mi Asphalt
The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...
OH 6.3 mi Asphalt

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 30,000 of trail maps
  • Share your trail photos
  • Save your own favourite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Trails by activity

Slippery Elm Trail

OH - 13.1 miles

In 1875, the Bowling Green Railroad Company operated its first train from its namesake city in Ohio south to Tontogany on rails made from the wood of the local slippery elm tree. The trees were...

Chippewa Inlet Trail

OH - 3.95 miles

The Chippewa Inlet Trail runs for nearly 4 miles between Lafayette Road/State Route 42 and the Chippewa Nature Area. The trail traverses an open, pastoral landscape along the Chippewa Inlet, which...

Cleveland Lakefront Bikeway

OH - 17 miles

The Cleveland Lakefront Bikeway extends 17 miles along the city's Lake Erie shoreline, between the suburbs of Euclid and Lakewood. The bikeway has on-road sections, and the route is signed. The...

Mill Stream Run Reservation All Purpose Trail

OH - 8.9 miles

For nearly 9 miles, the Mill Stream Run Reservation All Purpose Trail runs through a wooded park in Berea, a western suburb of Cleveland. Though the trail loosely parallels Valley Parkway, you will...

Accordion

Dr. Richard D. Ruppert Rotary Trail

OH - 2.36 miles

The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...

Lake to Lake Trail

OH - 2.4 miles

Cleveland Metroparks’ Lake to Lake Trail links Lake Isaac and Lake Abram in Middleburg Heights via an asphalt- and boardwalk-surfaced path. The two lakes are the largest remaining glacial wetlands in...

Big Creek Reservation All Purpose Trail

OH - 7.4 miles

Big Creek Reservation All Purpose Trail provides a paved pathway connecting the Mill Stream Run Reservation, Big Creek Reservation, and the Fern Hill Picnic Area. At its southern end, you can connect...

Chippewa Rail-Trail

OH - 2.4 miles

The Chippewa Rail Trail runs for 2.4 miles between Chippewa Road (SR 50) in Chippewa Lake to suburban Wycliffe Drive southwest of Medina (Lafayette Township). The trail is mostly rural in feel,...

North Coast Inland Trail (Sandusky and Ottawa Counties)

OH - 28 miles

The North Coast Inland Trail (NCIT) represents a regional collaboration among park districts across the Buckeye State to connect trails linking Ohio to Indiana and Pennsylvania. Begin this section...

Steel Mill Trail

OH - 2 miles

The Steel Mill Trail is a 2-mile continuation of the Bridgeway Trail, which lies within the Black River Reservation, a scenic wooded park in Lorain. The Steel Mill Trail picks up at the north end of...

Richland B&O Trail

OH - 18.5 miles

Traveling just over 18 miles through some of the most scenic areas of the Buckeye State, the Richland B&O Trail is an ideal way to immerse yourself in the region. Built partially as a result of the...

North Olmsted Walking & Bike Trail

OH - 3 miles

The short North Olmsted Walking & Bike Trail parallels Interstate 480 and provides an alternate, non-motorized route linking neighborhoods with green spaces and business districts.

Bridgeway Trail

OH - 4.8 miles

The Brideway Trail is found within the Black River Reservation, a park in Lorain County, where you can walk, jog, inline skate, cross-country ski or bike. The trail runs between Day's Dam in Lorain...

University/Parks Trail

OH - 6.3 miles

The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...

Rocky River Reservation All Purpose Trail

OH - 13.5 miles

The Rocky River Reservation All Purpose Trail parallels Valley Parkway through several western suburbs of Cleveland, but this is no traditional suburban side path. Instead, the winding trail through...

Chessie Circle Trail

OH - 11 miles

The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...

North Coast Inland Trail (Lorain County)

OH - 19.3 miles

The North Coast Inland Trail will one day stretch across northern Ohio from Indiana to Pennsylvania on a network of connecting off-road trails. Today, large sections of the trail, especially from the...

Brecksville Reservation All Purpose Trail

OH - 6 miles

The Brecksville Reservation All Purpose Trail offers a pleasant paved pathway connecting the community of Brecksville with the Ohio & Erie Canal Towpath Trail, a well-loved 81-mile route from...

Bridgeway Trail

OH - 4.8 miles

The Brideway Trail is found within the Black River Reservation, a park in Lorain County, where you can walk, jog, inline skate, cross-country ski or bike. The trail runs between Day's Dam in Lorain...

Chessie Circle Trail

OH - 11 miles

The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...

Chippewa Inlet Trail

OH - 3.95 miles

The Chippewa Inlet Trail runs for nearly 4 miles between Lafayette Road/State Route 42 and the Chippewa Nature Area. The trail traverses an open, pastoral landscape along the Chippewa Inlet, which...

Richland B&O Trail

OH - 18.5 miles

Traveling just over 18 miles through some of the most scenic areas of the Buckeye State, the Richland B&O Trail is an ideal way to immerse yourself in the region. Built partially as a result of the...

Accordion

Mill Stream Run Reservation All Purpose Trail

OH - 8.9 miles

For nearly 9 miles, the Mill Stream Run Reservation All Purpose Trail runs through a wooded park in Berea, a western suburb of Cleveland. Though the trail loosely parallels Valley Parkway, you will...

Rocky River Reservation All Purpose Trail

OH - 13.5 miles

The Rocky River Reservation All Purpose Trail parallels Valley Parkway through several western suburbs of Cleveland, but this is no traditional suburban side path. Instead, the winding trail through...

Slippery Elm Trail

OH - 13.1 miles

In 1875, the Bowling Green Railroad Company operated its first train from its namesake city in Ohio south to Tontogany on rails made from the wood of the local slippery elm tree. The trees were...

North Coast Inland Trail (Sandusky and Ottawa Counties)

OH - 28 miles

The North Coast Inland Trail (NCIT) represents a regional collaboration among park districts across the Buckeye State to connect trails linking Ohio to Indiana and Pennsylvania. Begin this section...

North Coast Inland Trail (Lorain County)

OH - 19.3 miles

The North Coast Inland Trail will one day stretch across northern Ohio from Indiana to Pennsylvania on a network of connecting off-road trails. Today, large sections of the trail, especially from the...

University/Parks Trail

OH - 6.3 miles

The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...

Lake to Lake Trail

OH - 2.4 miles

Cleveland Metroparks’ Lake to Lake Trail links Lake Isaac and Lake Abram in Middleburg Heights via an asphalt- and boardwalk-surfaced path. The two lakes are the largest remaining glacial wetlands in...

North Olmsted Walking & Bike Trail

OH - 3 miles

The short North Olmsted Walking & Bike Trail parallels Interstate 480 and provides an alternate, non-motorized route linking neighborhoods with green spaces and business districts.

Brecksville Reservation All Purpose Trail

OH - 6 miles

The Brecksville Reservation All Purpose Trail offers a pleasant paved pathway connecting the community of Brecksville with the Ohio & Erie Canal Towpath Trail, a well-loved 81-mile route from...

Big Creek Reservation All Purpose Trail

OH - 7.4 miles

Big Creek Reservation All Purpose Trail provides a paved pathway connecting the Mill Stream Run Reservation, Big Creek Reservation, and the Fern Hill Picnic Area. At its southern end, you can connect...

Chippewa Rail-Trail

OH - 2.4 miles

The Chippewa Rail Trail runs for 2.4 miles between Chippewa Road (SR 50) in Chippewa Lake to suburban Wycliffe Drive southwest of Medina (Lafayette Township). The trail is mostly rural in feel,...

Dr. Richard D. Ruppert Rotary Trail

OH - 2.36 miles

The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...

Cleveland Lakefront Bikeway

OH - 17 miles

The Cleveland Lakefront Bikeway extends 17 miles along the city's Lake Erie shoreline, between the suburbs of Euclid and Lakewood. The bikeway has on-road sections, and the route is signed. The...

Steel Mill Trail

OH - 2 miles

The Steel Mill Trail is a 2-mile continuation of the Bridgeway Trail, which lies within the Black River Reservation, a scenic wooded park in Lorain. The Steel Mill Trail picks up at the north end of...

Chessie Circle Trail

OH - 11 miles

The Chessie Circle Trail (formerly Westside Corridor Rail-to-Trail) provides a paved (and compacted stone), 11-mile north-south route through western Toledo built along the former Toledo Terminal...

Richland B&O Trail

OH - 18.5 miles

Traveling just over 18 miles through some of the most scenic areas of the Buckeye State, the Richland B&O Trail is an ideal way to immerse yourself in the region. Built partially as a result of the...

Big Creek Reservation All Purpose Trail

OH - 7.4 miles

Big Creek Reservation All Purpose Trail provides a paved pathway connecting the Mill Stream Run Reservation, Big Creek Reservation, and the Fern Hill Picnic Area. At its southern end, you can connect...

Lake to Lake Trail

OH - 2.4 miles

Cleveland Metroparks’ Lake to Lake Trail links Lake Isaac and Lake Abram in Middleburg Heights via an asphalt- and boardwalk-surfaced path. The two lakes are the largest remaining glacial wetlands in...

Accordion

Slippery Elm Trail

OH - 13.1 miles

In 1875, the Bowling Green Railroad Company operated its first train from its namesake city in Ohio south to Tontogany on rails made from the wood of the local slippery elm tree. The trees were...

Cleveland Lakefront Bikeway

OH - 17 miles

The Cleveland Lakefront Bikeway extends 17 miles along the city's Lake Erie shoreline, between the suburbs of Euclid and Lakewood. The bikeway has on-road sections, and the route is signed. The...

Rocky River Reservation All Purpose Trail

OH - 13.5 miles

The Rocky River Reservation All Purpose Trail parallels Valley Parkway through several western suburbs of Cleveland, but this is no traditional suburban side path. Instead, the winding trail through...

University/Parks Trail

OH - 6.3 miles

The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...

Chippewa Inlet Trail

OH - 3.95 miles

The Chippewa Inlet Trail runs for nearly 4 miles between Lafayette Road/State Route 42 and the Chippewa Nature Area. The trail traverses an open, pastoral landscape along the Chippewa Inlet, which...

Dr. Richard D. Ruppert Rotary Trail

OH - 2.36 miles

The Dr. Richard D. Ruppert Rotary Trail circles International Park along the east bank of the Maumee River in East Toledo. The trail runs between the Main Street bridge and Navarre Avenue, where it...

Brecksville Reservation All Purpose Trail

OH - 6 miles

The Brecksville Reservation All Purpose Trail offers a pleasant paved pathway connecting the community of Brecksville with the Ohio & Erie Canal Towpath Trail, a well-loved 81-mile route from...

Chippewa Rail-Trail

OH - 2.4 miles

The Chippewa Rail Trail runs for 2.4 miles between Chippewa Road (SR 50) in Chippewa Lake to suburban Wycliffe Drive southwest of Medina (Lafayette Township). The trail is mostly rural in feel,...

Bridgeway Trail

OH - 4.8 miles

The Brideway Trail is found within the Black River Reservation, a park in Lorain County, where you can walk, jog, inline skate, cross-country ski or bike. The trail runs between Day's Dam in Lorain...

North Olmsted Walking & Bike Trail

OH - 3 miles

The short North Olmsted Walking & Bike Trail parallels Interstate 480 and provides an alternate, non-motorized route linking neighborhoods with green spaces and business districts.

North Coast Inland Trail (Sandusky and Ottawa Counties)

OH - 28 miles

The North Coast Inland Trail (NCIT) represents a regional collaboration among park districts across the Buckeye State to connect trails linking Ohio to Indiana and Pennsylvania. Begin this section...

Steel Mill Trail

OH - 2 miles

The Steel Mill Trail is a 2-mile continuation of the Bridgeway Trail, which lies within the Black River Reservation, a scenic wooded park in Lorain. The Steel Mill Trail picks up at the north end of...

North Coast Inland Trail (Lorain County)

OH - 19.3 miles

The North Coast Inland Trail will one day stretch across northern Ohio from Indiana to Pennsylvania on a network of connecting off-road trails. Today, large sections of the trail, especially from the...

Mill Stream Run Reservation All Purpose Trail

OH - 8.9 miles

For nearly 9 miles, the Mill Stream Run Reservation All Purpose Trail runs through a wooded park in Berea, a western suburb of Cleveland. Though the trail loosely parallels Valley Parkway, you will...

Recent Trail Reviews

North Coast Inland Trail (Lorain County)

Newly paved section near Kipton.

November, 2018 by ed.wood.77582

The North Coast Inland Trail has now been paved between Kipton and Wakeman. Enjoy it!

North Coast Inland Trail (Huron County)

Elmore to Fremont

October, 2018 by vicki1960

Biked from Elmore to Fremont (and back). Very nice flat asphalt paved trail. Trail goes through a few very small towns. Along this trail you will see plenty of cornfields (in season) and pass by numerous working farms. This is rural Ohio at it's best. You will also have a view of the Ohio Turnpike on several occasions. There are some wooded sections of the trail. Trail surface in very good condition.
Trail towns along the trail are welcoming and friendly.
It's approx 10 miles between Elmore and Fremont. Each half-mile is marked with a sign. In the trail towns there are mileage signs as well.
Parked in Elmore at the old train station. There are places to eat and shop in Elmore. Parking in Elmore is at Ory Park on Rice Street. There is a bike shop and rental in Elmore. In Fremont there are places to eat and shop but to access them, you have to street ride. The trail continues on the other side of Fremont.
An all around great trail and fun ride!

Richland B&O Trail

Lots of scenery change from small towns, to fields, to forests.

October, 2018 by orion9282

Lots of scenery change from small towns, to fields, to forests.

Accordion

Slippery Elm Trail

SET is a real gem

September, 2018 by pmcox9

Very nice ride through verdant NW Oh farmland. Immaculately maintained; not so much as a cigarette butt in view. Much of the trail is shaded, making for a comfortable ride even on a hot day. Only disappointment was a sadly underperforming water fountain in NBaltimore.

Cleveland Lakefront Bikeway

Misleading name

August, 2018 by lampinscott

I think this should probably be renamed the “Cleveland LakeNear Bikeway”. We rode it from the northern end and it starts in a beautiful park with a marina and beach but quickly dead ends in a parking lot behind a highrise. We probably missed a sign but it’s pretty easy to find the continuation on a very busy section of Lakeshore Blvd that does have a marked bike lane but requires vigilant urban riding skills. After a couple miles it becomes much less trafficked going by beautiful homes and gardens. It then gets pretty ugly again for a few miles approaching downtown when you’re still on road sandwiched between noisy I-90, a mostly industrial area, and an airport.

We didn’t bother to continue past downtown because the ride was so disappointing.

The trail is well marked, relatively flat, and well paved but mostly on the road.

There are rare glimpses of the lake. If you’re looking for a family friendly ride this is definitely not for you.

Chessie Circle Trail

Not as stated

August, 2018 by schweinhart

We went to Bowman Park and found a crushed stone trail. Went to first street and still crushed stone. Don’t know where if ever it becomes asphalt.

Slippery Elm Trail

Enjoyable trip

July, 2018 by gatorcritter

I rode the Slippery Elm trail Sunday for the first time. It is an enjoyable trail with a fair amount of variety. I especially enjoyed the cool shade in the forested sections. The trailhead in North Baltimore is very nice with paved parking and clean restrooms. They have covered a lot of cracks in the pavement with a sealant that has made the surface a bit rough in places but otherwise it is in good condition.

Chippewa Inlet Trail

relaxing ride ¿¿

July, 2018 by acadia2013

Beautiful park. Trails are well maintain. Bullfrogs croaking, birds chirping, blue herons, bunnies, families of geese and beautiful vegetation and sparkling lake are some of the wonderful things you will see and hear on your ride. Enjoy ¿¿¿¿¿¿¿¿¿¿!

Richland B&O Trail

Beautiful Ride

June, 2018 by jdclark1282

Beautiful ride on a nice trail. Slightly uphill from Butler to Mansfield and downhill on the way back. The bike shop where I was planning to rehydrate was closed when I rolled back through, which made for a balmy 11 miles back to the car.

Cleveland Lakefront Bikeway

A Scenic Urban Bike Trail

January, 2018 by orangedoug

I rode the Cleveland Lakefront Bikeway in June 2017 as a nice out-and-back ride. There is lots to see from Euclid Beach Park (on the East Side) to Edgewater Beach Park (on the West Side) as you ride through downtown Cleveland, Ohio. This route was pretty flat with no difficult hills at all. The bikeway itself was a combination of bike paths in and around the beach parks, on street bike lanes on Lakeshore Boulevard and Detroit Road, and on street riding in Bratenahl and Downtown Cleveland. The busiest street traffic was on the several blocks of street riding downtown.

I found the route to be well marked, particularly on the portions where you were riding on the street. Complaints made in previous reviews about the condition of the route are outdated as I found the trail surface to be in pretty good shape. Other review complaints about riding through a ghetto in the Manhattan Beach and North Collinwood neighborhoods seem exaggerated but are balanced out by the ride past the mansions in Bratenahl. Look for the Cleveland Script Signs on either end of the trail for great postcard-like photo opportunities.

For those interested in riding this route, I would definitely suggest lathering up with sunscreen because other than the 3 mile section through the tree lined streets of Bratenahl, you are always out in the open along the shore of Lake Erie.

Rocky River Reservation All Purpose Trail

A Wide of Variety of Scenery

January, 2018 by orangedoug

I rode this trail during the first week of June 2017. I started this trail as I entered into the Rocky River Reservation when I crossed Bagley Road after having ridden the All-Purpose Trail through the entirety of the Mill Stream Run Reservation. The trail continues to follow the main road through the park -- the Valley Parkway. I would call this trail "The Trail of Bridges," as cross over the Rocky River numerous times and you pass under many others as you follow the Rocky River on its way to Lake Erie.

As you head north you are descending most of the way along this route, and climbing on your return. For the most part the slope is very gradual with just a few short steep climbs on the return trip.

For me, the most disappointing thing about this trail is that it doesn't make it all the way to the shores of Lake Erie. The trail ends at the Emerald Necklace Marina under the Detroit Road Bridge. It appears that from here toward the lake the steep sides of the valley prevent a trail from being developed. There may be a way of reaching the Lake Erie shore if you take the bike route out of the Rocky River Valley either at Rockcliff Drive or at the marina using the Scenic Park Loop Trail. In either case, you're going to have a good climb out of the valley and then you will have to bike along U.S. Highway 20, which I was unwilling to do as I am not familiar with the area, nor the amount of traffic along that route.

Mill Stream Run Reservation All Purpose Trail

Typical for a Cleveland Metropark

January, 2018 by orangedoug

I rode this trail in early June of 2017. This trail is approximately 9 miles long. I started at a parking lot just west of Edgerton Road and rode out to Edgerton and then northwest back through this Cleveland Metropark until it crosses Bagley Road where it continues on in the Rocky River Reservation. As mentioned by other reviewers this trail follows the main road through the park — the Valley Parkway. There were many bikers and pedestrians using the trail so at times maintaining a decent speed was difficult. I could see and understand why many cyclists prefer to ride on the road. I enjoyed the shade the trees along the trail provided, although on the return trip, the position of the sun was such that there was not as much sun protection. This trail follows the Rocky River as it heads north toward Lake Erie, though you don't see much of the river on this trail. Starting where I did, you are descending most of the way, and climbing on your return. For the most part the slope is very gradual with just a few short steep climbs on the return trip.

Find Nearby City trails

Accordion

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

OR

Register for free!

Join TrailLink (a non-profit) to view more than 30,000 miles of trail maps and more!

Register with Google

OR