Upper Arlington, OH Horseback Riding Trails and Maps

807 Reviews

Looking for the best Horseback Riding trails around Upper Arlington?

Find the top rated horseback riding trails in Upper Arlington, whether you're looking for an easy short horseback riding trail or a long horseback riding trail, you'll find what you're looking for. Click on a horseback riding trail below to find trail descriptions, trail maps, photos, and reviews.

  • Relevance
  • Name
  • Length
  • Most Popular
Activities
Length
Surfaces
Type
6 Results
Activities
Length
Surfaces
Type

Great American Rail-Trail

3743.9 mi
State: DC, IA, ID, IL, IN, MD, MT, NE, OH, PA, WA, WV, WY
Asphalt, Concrete, Crushed Stone

Heritage Rail-Trail

7 mi
State: OH
Asphalt

Little Miami Scenic Trail

77.7 mi
State: OH
Asphalt, Concrete

Ohio to Erie Trail

293 mi
State: OH
Asphalt, Concrete, Crushed Stone

Ohio Canal Greenway

2.7 mi
State: OH
Asphalt, Concrete

Paint Creek Recreation Trail

34.8 mi
State: OH
Asphalt
Trail Image Trail Name States Length Surface Rating
Note: This developing route is not yet fully contiguous – it is just over 50% complete. Please refer to the Trail Map for more information on the existing sections of trail, as well as the online...
DC, IA, ID, IL, IN, MD, MT, NE, OH, PA, WA, WV, WY 3743.9 mi Asphalt, Concrete, Crushed Stone
The Heritage Rail-Trail runs 7 miles between the outskirts of Plain City and the City of Hilliard. Following a former railroad corridor, the trail connects several parks and runs through farmland,...
OH 7 mi Asphalt
The Little Miami Scenic Trail is a jewel in the crown of Ohio rail-trails, spanning nearly 78 miles between the outskirts of Cincinnati and Springfield over historical bridges and through tranquil...
OH 77.7 mi Asphalt, Concrete
Closure Notice: There are several closures and detours in place for the Ohio to Erie Trail. See here for more information. The Ohio to Erie Trail is a colossal project, not just for the state of...
OH 293 mi Asphalt, Concrete, Crushed Stone
The Ohio Canal Greenway extends south from Hebron on an old Penn Central Railroad right-of-way. Farm fields border the trail on the west, while remnants of the historic Ohio and Erie Canal are to the...
OH 2.7 mi Asphalt, Concrete
The Paint Creek Recreation Trail is the flagship pathway of a planned trail network in the Ohio counties of Fayette, Ross and Highland. Nearly 35 miles of paved trail are currently open linking the...
OH 34.8 mi Asphalt

Recent Trail Reviews

Paint Creek Recreation Trail

Pretty scenery but a rough ride - this trail needs resurfaced

September, 2026 by jason.zerkle

The scenery is nice with lots of shade and hints of the foothills in the distance in some areas. Much of the trail is super bumpy and not great on a road bike. The root incursions have been recently ground flat but they’re still rough. There are long sections with many many cracks - some of the cracks are a couple inches wide. Most of the bridge transitions are mismatched with sunken pavement. The trail also hasn’t been cleared off when we ride today - lots of leaves sticks and nuts that are difficult to see at times with the dappled light from the surrounding trees. Once this trail gets resurfaced, it will be fantastic. Until then, it’s walking or mountain biking.

Great American Rail-Trail

Lovely Ride!

September, 2026 by l_digby

We rode the GAP from Cedar Creek Park to the Boston trailhead at the base of the Historic Boston Bridge and back. About 36 miles round trip. What a great ride. Smooth trail with lots of benches and several picnic areas and toilet facilities. Well maintained. Passed through several little communities along the trail. No major highways and very few little roads to cross making it very safe. Got a delicious huge “medium” size ice cream cone at the “Big Twist” in Blythedale, right off the trail. Highly recommend this ride!

Little Miami Scenic Trail

An Amazing Trail System In Ohio

August, 2026 by 6gfqq9fj45

I've ridden the LMST on average over 2,000 miles the past three years on my Aventon ebike. I enter the bike trail normally at Cartridge Brewing by riding the down the hill from Kings Island which is part of the city of Mason bike path system.

I've ridden to downtown Cincinnati, north to Springfield and created my own u-shaped ride from Loveland, OH to Xenia Station connecting to the Creek Trail west to downtown Dayton in order to access the Great Miami Bike Trail south all the way south to Trenton, OH (a 104.5 mi. ride).

2026 has had a few challenges as many sections of the trail north out of Loveland have undergone a refresh with digging out entire sections of the trail and blacktopping them anew. It's been fun to figure out how to circumvent these trail closings. I have gone off trail at South Lebanon where the trail is closed and followed Main Street into town and made a right on Mason Millgrove Road to arrive in a few miles at the next opening of the trail at Stub Mills Road just south of Morrow.

I'm thankful that I live in a state that supports an extensive bike trail system.

Accordion

Little Miami Scenic Trail

Tree across trail!!!

August, 2026 by davejohnson1967

Tree across the path 1.5 miles outside Xenia heading toward Spring Valley. You need to get off the bike and move around it.

Paint Creek Recreation Trail

Paint Creek Recreational Trail

August, 2026 by counsel4231

Trail is now open from Chillicothe into Washington Court House. Repairs have been completed to the two erosion closures. Many cracks in the pavement have been repaired but some remain.

Camp Chase Trail

Lots of trash, drug use, trail hazards

July, 2026 by natureschild1

From Eureka Ave to Hollywood Casino don’t ride alone, be cautious of trail hazards. I encountered between 10 & 15 individuals sitting on and around the trail using heavy narcotics, ‘on the nod’, plus two girls between 8 & 10 yrs of age sitting on the trail smoking weed. On my return I rounded a curve at high speed and almost collided with a car in mid path with its trunk open and two women standing at the trunk. A bike was laying across the path as well blocking all pavement. So much garbage, shopping carts, and scrap metal in the path. My co-rider hit something they didn’t see that sliced his tire. So many homeless camps along the path. Definitely not the 5 star, pretty ride described in the comments. I would ride the rest of the trail again but will never again ride between Eureka Ave. and Hollywood Casino.

Ohio to Erie Trail

Made up of many trails

July, 2026 by vicki1960

This "trail" is made up of many smaller trails and some of it is on roads. Do as much research on this as you can before your trip!

Kokosing Gap Trail

7/30/26

July, 2026 by blarnold

Parked in Danville and biked over to Mt Vernon. Had lunch at Southside Diner. Walked up into Mt Vernon and visited some shops. Grand Hotel is beautiful. Trail was paved. Mostly flat. A bit downhill on the return trip. Lots to see and beautiful scenery!

Downtown Connector Trail

Comes in handy

July, 2026 by vicki1960

We use this trail as a go between the Kokosing Gap Trail and the Heart of Ohio trail in Mt. Vernon. When in Mt. Vernon there is the old train station/welcome center with restrooms open bankers hours. Be sure to visit Ariel Foundation Park 1/2 mile from the Mt. Vernon train station welcome center. Many eateries near this trail. We went to the Southside Diner this time.

Kokosing Gap Trail

This is a great trail!

July, 2026 by vicki1960

We travel over 3 hours to get to every year and stay in the area. Trail runs from Mt. Vernon to Danville. Connects to other trails at each end. This trail is paved in good to fair condition. There was a closure on the trail near Kenyan College approx mile marker 4. Word is they are doing repairs before a near future repave. We will see next year when we come back. Most of the trail is well shaded but some of it goes through open farmlands. Take the Mt. Vernon Connector and there are numerous places to eat next to the trail. While in the area visit Berlin Amish Country. All in all this trail is one of our favorites!

Western Fayette Bike Path

Trail extension from Octa to Milledgeville near completion. Extension just over two miles. One bridge needs guard rails finished, and two road crossing in Octa to be completed

July, 2026 by ddb649

Trail extension from Octa to Milledgeville near completion. Extension just over two miles. One bridge needs guard rails finished, and two road crossing in Octa to be completed

Kokosing Gap Trail

This trail is well maintained and very beautiful

July, 2026 by tom43760

This trail is well maintained and very beautiful

Find Nearby City trails

Accordion

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.