Find the top rated hike trails in Perry, whether you're looking for an easy short hike trail or a long hike trail, you'll find what you're looking for. Click on a hike trail below to find trail descriptions, trail maps, photos, and reviews.
Very nice trail, hilly and punchy. You will get a workout. Well maintained, recent fresh asphalt. Almost entirely in the shade on a hot June morning. Meets up with the hike and bike trail at the lower end.
On a hot summer day, this is the trail to ride! Miles and miles of nothing but shade. Always an enjoyable ride on this trail. Follows French Creek which was muddy and high levels of water due to so much recent rains. Saw a hawk along the trail. And a turtle down near the Beans trailhead.
This is the second time riding the WRG.We started at The Rock Creek Falls Trailhead. Still like because of the wide trail. We also found when you get to the Austinburg Trail Head that about 500 feet west of it is a great coffee shop. They roast their own coffee and have fresh baked pastries. A small coffee and tea and 2 banana bread with chocolate was around $10.00. We like to support local businesses along trails if we can. Safe travels.
We have ridden the trail a couple of times this year. We started at Rock Creek Trailhead and rode to Ashtabula. Nice wide trail. A few bumps but that is to be expected. When you get to Austinburg there is a Coffee shop there that is a good place to get some coffee and a pastry. I believe it’s Station Coffee and Pastry. Coffee beans are roasted on site and fresh baked pastry. We had the banana bread with chocolate chips. Small coffee and a tea and two slices banana bread was around $10.00. We love riding trails where you can stop and try some local shops.
I have to say a big THANK YOU to the Portage County Parks District for repairing a good portion of the sections of the trail. So much smoother. Keep up the good work.
May 2025-Spring Ride. Great ride as always and enjoy visiting the Spillway. Trail is approx 3.5 miles in length, flat and paved. Mid point is the Spillway. Plenty of parking and restrooms.
Very nice trail. Pretty scenery but the amount of gnats on it ruin it. There was probably about 1 minute of the ride where there wasn’t a swarm of gnats you were going through.
Last Friday a buddy and I rode the Niles Greenway & the Metroparks Bikeway. While I liked the Metroparks section a tad better the Niles was certainly nice. There were a few nice bridges to ride over and a fantastic picnic area at the north trailhead. I believe the length on TrailLink for this trail is incorrect though. According to the signs along the trail it is 3.87 miles long and that matches pretty closely to what I got on my Garmin. The Niles is a bit more urban or light industrial and has 10 road crossings so keep that in mind. If you're on the Metroparks trail be sure to ride the Niles also.
A buddy and I rode the Metroparks Bikeway and the Niles Greenway on Friday. My overall impression of the trail was very good. The pavement is nice and the Kirk Rd. trailhead where we started was very nice also. The downsides of the trail are actually quite minor. There are cracks in the pavement on the section north of Kirk Rd but unlike some other reviewers who saw them as awful I found them just a bit of a distraction. If you've ever ridden paved trails with root or frost heaves these are nothing. I'm not sure how you could wreck on them as I believe someone suggested. The other downside is the number of road crossings. By our count I believe we had 13 crossings. Double that for a round trip of course. The route south from Kirk Rd. was my favorite though, fewer crossings, no cracks and a bit more wooded of farmland feeling. I have no regrets riding this trail.
Rare 70 degree day mid-March provided a great opportunity to get out and enjoy the trail. Trail is free of any ice/snow and wet leaves. Paved surface for 6 miles from Meadville to Krider Road. Beans trailhead has a new layer of gravel so it won't be as much of a mud hole in the Spring!
Rode the trail on 3/8/25 and it has fallen into disrepair the path is littered with debris, the rail between the trail and the cliff is broken with many sections heavily damaged, some parts of the trail surface is beginning to breakup and slide down the hillside. The city of Cleveland has responsibility for the maintenance of this trail according to our council woman but the city has neglected this critical pathway to the lower section of the towpath.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!