Find the top rated wheelchair accessible trails in Mansfield, whether you're looking for an easy short wheelchair accessible trail or a long wheelchair accessible trail, you'll find what you're looking for. Click on a wheelchair accessible trail below to find trail descriptions, trail maps, photos, and reviews.
I took the trail during the last week in August, starting at the west end. It was trashy under the first bridge just at the beginning, but otherwise the trail was fine. I didn't have any problem seeing the chain link fence.
Views of the Basket Building are best going west, especially when even with the white-roofed greenhouses. Longaberger Basket closed in 2018 and it is now empty.
I could not find the parking lot on the west end as mentioned when I was on the corner of E Main St and S Morris St. I ended up parking at the St Vincent De Paul Thrift Store with permission. If one is going to do the whole route, there is better and obvious parking about midway at Marne and Licking Valley Rd NE as mentioned by others. There is a bike fix-it station less than a minute's ride from that parking lot at the trail side of the church. This would be a good place for a port a pot, since there are no restrooms along the way. The east end doesn't have parking either where the trail just ends.
There are a couple fast food restaurants and a convenience store off the path a couple miles from the west end. Some are at the bottom of a hill, so keep in mind you have to go back up the hill to get on the trail again.
Overall a good trail for the area.
Been awhile since I rode this trail. Started at Ernie’s in Massillon and rode into Dalton. The trail has a noticeable incline going from East to West and the wind is typically from West to East. The 10+ bridges are in good shape. The trail has had some improvements but around the 3 mile mark after riding new asphalt the section of about 3/4 is somewhat bumpy The scenery is nice and both ends of trail have stopping places to eat
I am thankful for the reviews as I was able to ride the grassy section to add a few miles. I did the county line trail before this one, between the two I managed to do 20 miles with a 7 mile car ride between the trails. Maybe I will live long enough to see and ride the completion of this trail system.
We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.
We biked this trail along the section which runs through the Cuyahoga Valley National Park. First we took advantage of the Explorer Program offered by the Cuyahoga Valley Scenic Railroad. For $5 you can purchase a one-way ticket, load your bike and take the train to one of the stations then bike riding back. The train was nice and air conditioned. No need to make reservations, purchase the $5 ticket when you board. They have bike restrictions (bike weight) so visit their website for all the information including the schedule. www.cvsr.org
We ate lunch in Peninsula. Eddys bike shop in Peninsula burned to the ground over the Winter they are now operating out of a cement block garage offering bike rentals. There is a farm market along the trail to check out. The trail is mostly crushed limestone with a few paved sections and boardwalks. So many old locks and remnants of the canal. There is an ice cream shop at Boston Mills. Most of the trail is well shaded. Train stations along the way, and some public restrooms but not necessarily at the train stations. All around great way to spend the day! Take the train and you can bike back as little as a few miles or up to 22.
The trail itself was in good shape, fairly smooth not a lot of bumps. About 75% of the ride was shaded. It would be pretty in the fall when the leaves change colors. Major complaint is the amount of horse poop on the trail. And because most of the trail being shaped it was hard to avoid. Washed my bike when I got home. Kokosing Gap trail and Holmes County Trail are much better rides.
We parked at the lot in Elmore and first rode northwest to Genoa. This is a good section of the Inland Trail, very flat, good pavement, lots to see and do. The map doesn't show it yet, but the trail is paved all the way into Genoa. The newly added trail runs north beside Martin Williston road, and west beside SR-51, then winds along a separate paved path into Genoa. The trail is separated from the roads, no problem. The trail ends ends in Genoa at Washington and 6th streets, adjacent to an Ice Cream shop and Veterans Memorial Park. We then rode back to Elmore, then over to Lindsey. Each town is about 5 miles apart, giving us roughly half hour segments between each town. There are a few crossings along the way, but not bad. Plenty of shade. They just added a lot to the intersection going under the Ohio turnpike. There is a Sunflower Tours site on the outskirts of Lindsey. You can take a tractor-pulled trailer ride through a field of sunflowers for a small fee. Looked like a good time. The pavement is well maintained and the path is well marked. All and all a very nice afternoon ride.
Fremont to Elmore, August 2025. Parked in Fremont at 1500 Walter Avenue lot. Traveled West to just beyond Elmore and back. Though the trail does continue to Genoa, it was a hot and sunny day and there isn't much shade. Most of the trail goes through cornfields. Happy that we can now go under the OH turnpike at Waggoner Road. The 15 month construction is over, it's very nice and worth the wait! Beautiful Sunflower field in Lindsey. Trail is paved and obviously a flat rail trail through quaint old railroad towns. This is our favorite section of the trail we frequent it traveling 3 1/2 hours to get to. We brought in some revenue to the area staying 3 days and riding multiple trails.
As noted, this trail is in the second phase of three, so expect it to be under construction. The third phase will be making the trail under the overpass to eliminate going on the road for that short time.
I started at the trailhead in Greenwich. The parking lot and about .2 mile is gravel, but then it turns to crush stone (crushed limestone or cinder???). That was very flat and smooth. It lasted about a mile until the trail crossed Alpha Rd. The surface was then gravel and dirt, the worse part was closer to the overpass. After a short zig-zag on roads to get across Rt 250 and Vermilion River, the trail continued. The total length of the gravel and dirt section was about 4 miles. The final 2 miles going into New London was crushed stone again. The trail head in New London was paved with cement. No restrooms were at either trail head. It took me about 40 minutes in each direction. It is true that some places were rougher than others, but I was still rolling at 12-13.5 mph. On the limestone sections, I was cruising at 13.5-15.5 mph. The trail is lined with trees and fairly straight, since it was a railroad track in the past. It also crosses a few roads.
The trail does run alongside, but doesn't cross, an active railroad track.
A few benches are located on the crushed stone sections.
Eateries and shops are within maybe a half a mile from the New London trail head, and within a mile or so from the Greenwich trail head.
The trail has improved since I was last rode it in September of 2023, when it was all gravel, and much rougher. For those who like smooth asphalt, parts will be rough. For those who like single track on dirt over roots and rocks, probably won't think that it is bad. Wider tires are recommended. Mine were 35.
Enjoy the ride and remember that it is a work in progress.
Biking this trail did not disappoint! Shout out to Metroparks and Cuyahoga Valley National Park for maintaining and connecting the trail. We started at the Boston Mills Trailhead /Visitor Center and used the train in both directions…$5 and they did load our e-bikes. Scenic, charming, and good surface. Stayed at Richfield motel. Convenient.
Detours on road but not busy as is in the country. Love the flat paved trail 10/10
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!