Find the top rated walking trails in Marblehead, whether you're looking for an easy short walking trail or a long walking trail, you'll find what you're looking for. Click on a walking trail below to find trail descriptions, trail maps, photos, and reviews.
We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.
We parked at the lot in Elmore and first rode northwest to Genoa. This is a good section of the Inland Trail, very flat, good pavement, lots to see and do. The map doesn't show it yet, but the trail is paved all the way into Genoa. The newly added trail runs north beside Martin Williston road, and west beside SR-51, then winds along a separate paved path into Genoa. The trail is separated from the roads, no problem. The trail ends ends in Genoa at Washington and 6th streets, adjacent to an Ice Cream shop and Veterans Memorial Park. We then rode back to Elmore, then over to Lindsey. Each town is about 5 miles apart, giving us roughly half hour segments between each town. There are a few crossings along the way, but not bad. Plenty of shade. They just added a lot to the intersection going under the Ohio turnpike. There is a Sunflower Tours site on the outskirts of Lindsey. You can take a tractor-pulled trailer ride through a field of sunflowers for a small fee. Looked like a good time. The pavement is well maintained and the path is well marked. All and all a very nice afternoon ride.
As noted, this trail is in the second phase of three, so expect it to be under construction. The third phase will be making the trail under the overpass to eliminate going on the road for that short time.
I started at the trailhead in Greenwich. The parking lot and about .2 mile is gravel, but then it turns to crush stone (crushed limestone or cinder???). That was very flat and smooth. It lasted about a mile until the trail crossed Alpha Rd. The surface was then gravel and dirt, the worse part was closer to the overpass. After a short zig-zag on roads to get across Rt 250 and Vermilion River, the trail continued. The total length of the gravel and dirt section was about 4 miles. The final 2 miles going into New London was crushed stone again. The trail head in New London was paved with cement. No restrooms were at either trail head. It took me about 40 minutes in each direction. It is true that some places were rougher than others, but I was still rolling at 12-13.5 mph. On the limestone sections, I was cruising at 13.5-15.5 mph. The trail is lined with trees and fairly straight, since it was a railroad track in the past. It also crosses a few roads.
The trail does run alongside, but doesn't cross, an active railroad track.
A few benches are located on the crushed stone sections.
Eateries and shops are within maybe a half a mile from the New London trail head, and within a mile or so from the Greenwich trail head.
The trail has improved since I was last rode it in September of 2023, when it was all gravel, and much rougher. For those who like smooth asphalt, parts will be rough. For those who like single track on dirt over roots and rocks, probably won't think that it is bad. Wider tires are recommended. Mine were 35.
Enjoy the ride and remember that it is a work in progress.
A gem of a trail from Royalton Rd to the Marina. I’d probably avoid during weekends or after work due to increased foot traffic. Smooth tarmac except for detour near Cedarpoint Rd bridge reconstruction but fun gravel.
I feel this trail is a bit of a mixed bag, as it has an excellent round trip and is completely open to the sun, but the pavement is very rough and badly needs an upgrade (which seems to have started around 2025) throughout most of the trail.
With that said, I would cautiously recommend this trail if you're wiling to try it.
With nonstop noise from vehicle traffic a constant and nothing to see/do I might consider skipping if you're from out of town.
A good, quick trial that's' mostly sunny, good smooth pavement, but nothing to see except some sports fields.
This trail is still in phase two of a three phase project which won’t finish until 2026. The New London and Greenwich ends are finished and nice crushed cinder but the middle between Greenwich is very rough. Fencing has been put up in some areas, a bench or two but it has shade and some nice farm, wooded views. There are restaurants and small shops at both ends of the trail. It will be great once complete!
While coming across OH on our way back to PA from IN, we stopped at this trail. Had lunch in Bowling Green (OH). Parked at the Montessori school trailhead since school was not in session. Biked South to North Baltimore and back. It was a hot and sunny day. There isn't much shade coverage as this trail goes through mainly farmlands once out of Bowling Green. First few miles appears to be newer asphalt pavement but the further South, the more sealed cracks there are but it wasn't bumpy. Wood County Parks District does a great job maintaining this trail with trash cans (that they empty) and park benches along the way. Grass was cut too! North Baltimore end of the trail has parking and real flush toilet restrooms. One block from town for water/food if needed. There are quite a few road crossings but not a lot of traffic.
It's got some nice scenery, but with pretty bad pavement and an iffy round trip distance, I wouldn't bother unless you're local.
A mix of cinder(about 2 miles in New London) and large stone and rough terrain the rest of the trail made for a rough, uncomfortable and tricky ride. The nice mix of sun and shade along the entire trail was a positive. Not recommended.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!