|
Overview
The Dequindre Cut Greenway is a paved path nearly 2 miles long in downtown Detroit. The trail has separate lanes for bicyclists and pedestrians. Entrance ramps for the trail can be found...
|
MI |
1.8 mi |
Asphalt
|
|
|
Overview
Along its 3.5-mile paved route, the RiverWalk offers breathtaking views of the Detroit River and city skyline.
About the Route
Recreational opportunities abound as the trail links...
|
MI |
3.5 mi |
Asphalt, Concrete
|
|
|
The East-West Connector Trail is true to its name, providing an important off-road connection between several trails in the Downriver Linked Greenways network, which enables cyclists and pedestrians...
|
MI |
2.1 mi |
Asphalt
|
|
|
Overview
This trail is actually composed of two trails: the 17.5-mile Hines Park Trail is the 2-mile Rouge River Gateway Greenway, which creates a seamless 20-mile connection between Dearborn and...
|
MI |
20 mi |
Asphalt
|
|
|
A popular destination year-round for residents across the Detroit area, the Lake Erie Metropark offers a wide variety of activities and recreation sites across its 1600-plus acres. Nestled along the...
|
MI |
3 mi |
Asphalt
|
|
|
Closure Notice: The pedestrian bridge over the West Branch of the Black River, near the Western Falls and the southwest end of Cascade Park, is closed due to disrepair. Follow the alternative route...
|
OH |
30.7 mi |
Asphalt
|
|
|
Overview
The North Coast Inland Trail (NCIT) represents a regional collaboration among park districts across the Buckeye State currently including Ottawa, Sandusky, Huron, and Lorain counties. This...
|
OH |
29.64 mi |
Asphalt
|
|
|
The aptly-named North-South Connector Trail provides a paved trail connection between the communities of Gibraltar and Trenton, in the area south of Detroit known as the Downriver. Part of a...
|
MI |
3.5 mi |
Asphalt
|
|
|
An extension of the paved paths that connect the Oakwoods, Willow, and Lower Huron Metroparks, the Oakwoods Metropark to Flat Rock Trail allows you to continue your trail experience into the small...
|
MI |
2 mi |
Asphalt
|
|
|
Stretching from the small riverside community of Rockwood to the East-West Connector Trail north of the city, the Rockwood Pathway provides a great way for cyclists and pedestrians to get around town...
|
MI |
1.6 mi |
Asphalt
|
|
|
In 1875, the Bowling Green Railroad Company operated its first train from its namesake city in Ohio south to Tontogany on rails made from the wood of the local slippery elm tree. The trees were...
|
OH |
13.1 mi |
Asphalt
|
|
|
Despite being less than a mile long, the Southwest Greenway provides important community connections to the riverfront and several city parks. Located in southwest Detroit, the greenway follows a...
|
MI |
0.67 mi |
Concrete
|
|
|
A paved path, suitable for walking and cycling, the Trenton Walking Path follows the small but tranquil Frank and Poet Creek through a series of parks and green space that cuts right through the heart...
|
MI |
2 mi |
Asphalt
|
|
|
The University/Parks Trail is a wide, paved trail that extends from Toledo into its western suburbs along a former railroad corridor. More than half the trail also parallels an active freight...
|
OH |
6.3 mi |
Asphalt
|
|
|
Overview
The Wabash Cannonball Trail is a 64.1-mile multiuse trail in northwest Ohio. Running along a former railroad, the rail-trail surface is a mix of paved asphalt and hard packed cinder...
|
OH |
64.1 mi |
Asphalt, Ballast, Cinder, Crushed Stone
|
|
|
You won’t find this trail’s name on the ground: the continuous stretch is actually made up of the scenic trails within Oakwoods Metropark, Willow Metropark and Lower Huron Metropark, as well as a...
|
MI |
16.3 mi |
Asphalt
|
|
|
The Flat Rock Pathway is a paved asphalt path in the small, industrial community of Flat Rock, located on the banks of the Huron River not far from where it empties into Lake Erie. Part of the...
|
MI |
3.5 mi |
Asphalt
|
|
|
The Grosse Ile Trail is a smooth, paved route running nearly the entire north–south length of Grosse Ile, which rests in the Detroit River between mainland Michigan and Ontario, Canada. The trail...
|
MI |
6.2 mi |
Asphalt
|
|
|
The Huron River Greenway MetroPark Trail has two separate segments, each just under 1 mile long. The northern (Huron) segment runs from DuPont Marsh State Nature Preserve off River Road and heads...
|
OH |
1.8 mi |
Crushed Stone
|
|
|
Overview
The I-275 Metro Trail began back in the 1970s as the Michigan Department of Transportation's response to the then-fuel crisis. The original trail linked Wayne, Oakland, and Monroe counties...
|
MI |
31.7 mi |
Asphalt
|
|