Find the top rated birding trails in Lorain, whether you're looking for an easy short birding trail or a long birding trail, you'll find what you're looking for. Click on a birding trail below to find trail descriptions, trail maps, photos, and reviews.






_249776_st.jpg)
_277990_st.jpg)




_133078_st.jpg)
_228736_st.jpg)






We live not too far from this trail and like to bring our dog along for a nice walk. The trail is flat and new asphalt pavement is easy to walk. Nice local trail.
I went to the Alexander Rd trailhead on 10/25/25 planning to ride south over Brandywine Falls area, but the trail is completely blocked off with fencing and heavy equipment for an apparent repair. It was disappointing, but I rode north into the Bedford reservation instead for a hilly, beautiful ride. Just wanted everyone to be aware of the closure. There is no posting when it may be opening again.
I’m a newer rider and decided to ride from Ira trailhead north to Boston Mills. It was about a 14 mile round trip, mostly flat ride. It was absolutely beautiful for a crisp, fall ride! There were some areas of congestion along the way, but most of the ride was quiet and relaxing. I look forward to trying other areas of the trail!
The trail has been resurfaced and the section up to the Medina Career Center has been paved with asphalt. Trail is in excellent condition. Nice job Medina county!
Rode out on Old Muskingum. He people, flat quiet, not too much to look at. then back on towpath but closed at Crystal Springs.
This short trail connects to other trails to make a loop from the Ohio and Erie trail. I started at Bacci park, north east to Garfield park, west on Morgana run. Then to this trail to Ohio and Erie connector. About a 18 mile loop.
Overgrown vegetation, trail has many bumps, west end of trail is detoured by freeway 77. Not a safe area either. Would be nice if the maintained this as it is a connector trail to Garfield and Washington trails that go to Ohio and Erie trail
We are traveling and today was the only day we had to ride the trail. We entered at the Rockside Station and rode south. About 4 miles in, it started to rain off and on. We were sad because the forecast said 0% chance. Rode on for another few miles. By this time my husband's back was covered in mud from the wet trail and he was chilly, so we turned around and headed back. Total miles ridden was 17, so we only got a small portion but we loved it. So beautiful with yellow wildflowers all around. Informative historical signs tell you about the Erie Canal and life on the canal. Neat. I wish we could have ridden the train and then biked back, but we found out it doesn't run on Monday and Tuesday, and guess when we were here, yup Monday and Tuesday. If we are ever back in the area we would definitely ride it again!
I am thankful for the reviews as I was able to ride the grassy section to add a few miles. I did the county line trail before this one, between the two I managed to do 20 miles with a 7 mile car ride between the trails. Maybe I will live long enough to see and ride the completion of this trail system.
We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!