Find the top rated walking trails in Vermilion, whether you're looking for an easy short walking trail or a long walking trail, you'll find what you're looking for. Click on a walking trail below to find trail descriptions, trail maps, photos, and reviews.
This trail is still in phase two of a three phase project which won’t finish until 2026. The New London and Greenwich ends are finished and nice crushed cinder but the middle between Greenwich is very rough. Fencing has been put up in some areas, a bench or two but it has shade and some nice farm, wooded views. There are restaurants and small shops at both ends of the trail. It will be great once complete!
A mix of cinder(about 2 miles in New London) and large stone and rough terrain the rest of the trail made for a rough, uncomfortable and tricky ride. The nice mix of sun and shade along the entire trail was a positive. Not recommended.
First time on this trail. Started off at the North Lake park. The covered trail with the tree canopy was a little chilly. But the views were amazing. Traffic was very light. The path is well maintained. This is one of my favorite thus far.
Ok section, kind of dull. Agriculture & cows. Found a bit of shade by a grain elevator for lunch. Several washouts filled with tumbleweeds as you get closer to Lind.
Took the kids for a bike ride on this trail! It wasn’t over crowded. Beautiful scenery too! Enjoyed stopping at the parks along the way for the kids to play at.
Great scenic country trail. Paved the whole way and no incline.
Great trail to downtown wadsworth. Would love to see it extended!
Rode the trail on 3/8/25 and it has fallen into disrepair the path is littered with debris, the rail between the trail and the cliff is broken with many sections heavily damaged, some parts of the trail surface is beginning to breakup and slide down the hillside. The city of Cleveland has responsibility for the maintenance of this trail according to our council woman but the city has neglected this critical pathway to the lower section of the towpath.
We started in Akron and rode about 18 miles north. Loved it!!!
Not sure what the September reviews are talking about. Rode this trail today from route 97 to Mansfield and back, for 21 miles. We had no scary issues. A few bumps. Awesome crisp fall day. The fences were in place to protect from going into a deep ravines. We would ride this trail again. Not on a Sunday because the nearby Der Dutchman restaurant was closed. ¿
Started at the beginning of the trail in Bellevue and rode to the end in Genoa. Round trip was 68.5 miles, so each way about 34 miles. This is a great trail - flat and smooth, with minimal uprooting. Two things to mention: 1. There are several road crossings, and 2. Have to ride on streets in one of the passing towns (route signs are visible, though).
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!